Outdoors
Elevation
Select a view or open the gallery
Addor Arise
Kocharab, Ahmedabad
Construction Status
New launch
Possession will start from Dec, 2029
Price on request
Price on request
3 BHK
Carpet Area
930–1007.61 sqft
Price on Request
Project Details
- Project area
- 0.71 acres
- Towers
- 1
- Total units
- 112
- Floors
- 14
- Open area
- 66%
- Unit sizes
- 930–1,007.61 sqft · Carpet Area
- Configurations
- 3 BHK
- Property type
- Apartment
- Possession
- Completion in Dec, 2029
Specifications
- Structure - Earthquake resistant R.C.C. frame structure Flooring Vitrified tiles for drawing room, kitchen, dinning room or equivalent China mosaic on terrace Kitchen Granite top platform with sink • Tile dado up to lintel level Wall Finish Internal Single coat mala plaster with putty finish External double coat plaster with paint or equivalent Toilet & Plumbing -
CPVC
- and
UPVC
- pipes or equivalent Sanitary bath fittings & tiles on flooring dado or equivalent Doors & Windows Main door & other flush door or equivalent Powder coated/anodized aluminum sliding window or equivalent Electrification Modular switches with concealed copper wiring and MCB distribution panel or equivalent
As stated by the builder; shown as filed.
RERA Registration
Phase registrations, completion timelines and available documents from the state RERA record.
Phase 1
RAA15883/220925/311229
Gujarat RERA
- Registered on
- Not stated
- Completion by
- Not stated
Indicative project-name match
A similarly named project was found in GujRERA
This match used project name and state, not the registration number. Treat it as indicative and verify the number on the live portal.
- Snapshot checked
- 21 Jul 2026
- Check the official portal
- Open GujRERA portal ↗
- Registry ID
- PR/GJ/AHMEDABAD/AHMEDABADCITY/AHMEDABADMUNICIPALCORPORATION/RAA15883/220925/311229
- Registry promoter
- Addis Infracon LLP
- Registry project status
- New
Registry documents
Mirrored from GujRERA
Requesting a download sends your enquiry to the seller. Once sent, other documents for this project stay unlocked for this browser session.
Registration certificate
Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AHMEDABADMUNICIPALCORPORATION/RAA15883/220925/311229128 KB
Files are shown as captured in our registry snapshot. Always confirm the latest record on the official state portal before you transact.
About Addor Arise
For those looking to buy a residential property, here comes one of the choicest offerings in Ahmedabad West, at Kocharab. Brought to you by Addor, Addor Arise is among the newest addresses for homebuyers. There are apartments for sale in Addor Arise Kocharab, Paldi. This is a new launch project right now, and is expected to be delivered by Dec, 2029 . Addor Arise Ahmedabad West is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERA registration number of this…More ↓Less ↑
For those looking to buy a residential property, here comes one of the choicest offerings in Ahmedabad West, at Kocharab. Brought to you by Addor, Addor Arise is among the newest addresses for homebuyers. There are apartments for sale in Addor Arise Kocharab, Paldi. This is a new launch project right now, and is expected to be delivered by Dec, 2029 . Addor Arise Ahmedabad West is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERA registration number of this project is RAA15883/220925/311229. Addor is one of the known real estate brands in Ahmedabad West.The builder has delivered 5 projects so far. Around 2 projects are upcoming. There is 1 project of this builder, which is currently under-construction. Read on to know more about must-know features, Addor Arise Photos, Floor Plans, Brochure download procedure and other exciting facts about the project.
Top Facilities
2 facilities recorded for this project
- Car Parking
- Fire Fighting Systems
Location Advantages
Key destinations around Addor Arise
L.D. College Of Engineering
University · 800 meters
Paldi Metro Station
Metro Station · 1.8 Km
Sardar Patel Stadium
Stadium · 3.5 Km
Himalaya Mall
Shopping Center/ Market/ Mall · 3.6 Km
ITC Narmada
Hotel · 4 Km
Asia English School
School · 4.1 Km
View Official Brochure
Official brochure
Addor Arise
15 pages · 7.4 MB · PDF
Published by the builder; shown as filed.
Reading here is free. Downloading sends your enquiry to the seller so they can follow up.
Market Snapshot for Kocharab
Computed from 2 Kocharab projects in our catalogue.
Government charges
Stamp duty — 5.9 % for Male5.9 % for Male
Stamp duty — 4.9 % for Female4.9 % for Female
Stamp duty — 5.9 % for Joint (Male and Female)5.9 % for Joint (Male and Female)
Stamp duty — 4.9 % For Joint (Female and Female)4.9 % For Joint (Female and Female)
RegistrationMale Ownership: 1%
RegistrationFemale Ownership: No registration charges
RegistrationJoint (Male + Female) Ownership: 1 %
As recorded for this state — confirm current rates at registration.
Society Reviews
Reviews by residents
No written reviews yet
Be the first to share a first-hand experience.
Explore life around Addor Arise
Understand prices, daily conveniences and connectivity around the project before planning a visit.
Distances as recorded by the builder — approximate; please confirm on the ground.
View on mapMetro & Rail 2
- Paldi Metro Station1.8 Km
- Ahmedabad Junction6.3 Km
Schools 1
- Asia English School4.1 Km
Colleges & Universities 1
- L.D. College Of Engineering800 meters
Hospitals 1
- SAL Hospital4.9 Km
Shopping & Malls 1
- Himalaya Mall3.6 Km
Business Hubs 1
- Parshwanath Business Park7 Km
Roads & Connectivity 1
- Sarkhej - Gandhinagar Hwy11.1 Km
Airport 1
- SVP International Airport11.7 Km
Hotels 1
- ITC Narmada4 Km
Sports & Stadiums 1
- Sardar Patel Stadium3.5 Km
Distances as recorded when the project was listed — approximate; please confirm on the ground.
Similar Projects
Comparable projects around Kocharab
About Addor

Addor
4 projects on PropertyBaazi
Addor is an eminent name in the real estate industry. It is driven by the vision to become a leading real estate firm while maintaining highest standards of ethics and transparency. The company has successfully delivered many residential, commercial and infrastructure projects and aims to establish itself as a distinctive development group. With every project that it delivers, the group strives to enhance the lifestyle needs of the customers to a new level of positive human experiences.
Projects by Addor
Frequently Asked Questions
Is Addor Arise ready to move in?
Addor Arise is still under construction, with possession expected around Dec, 2029.
Does Addor Arise have RERA approval?
Yes. Addor Arise is registered with GujRERA under number RAA15883/220925/311229, which you can verify on the official RERA portal.
How much should I budget for Addor Arise?
Addor Arise offers 3 BHK Apartment, sized 930–1,007.61 sq.ft carpet area. Current pricing is shared on request — download the brochure from the project page for the latest price list.
Whereabouts is Addor Arise, and what's the commute like?
Addor Arise is located in Kocharab, Ahmedabad.
What's the scale of Addor Arise?
Addor Arise is spread across 0.7 acres, 1 tower, up to 14 floors and 112 homes.
What amenities does Addor Arise offer?
Addor Arise comes with 2 amenities, including Car Parking and Fire Fighting Systems.
What conveniences are near Addor Arise?
Close to Addor Arise you'll find hospitals such as Amdawad Eye Laser Hospitals Pvt Ltd and Dr. Trivedis Arthroscopy Clinic And Hospital, schools like Sahajanand College and A. G. Teachers High School.
Which builder is behind Addor Arise?
Addor Arise is being developed by Addor.
Quick Links
Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.



