Bose Ashirbaad Apartment
Kalighat, Kolkata
Construction Status
Under construction
Possession will start from Aug, 2029
Price on request
Price on request
Project Details
- Project area
- 0.06 acres
- Towers
- 1
- Total units
- 8
- Floors
- 3
- Property type
- Apartment
- Possession
- Completion in Aug, 2029
Specifications
Structure or Foundation Building designed with R.C.C. Framework which rest on individual column design approved by KMC. Walls All the external walls shall be 8" thick brick wall with cement plaster 1:4 cement sand mortar. All internal partition walls shall be 3" thick brick with cement plaster 1:4 cement sand mortar. Window All windows shall be sliding aluminum window with 4 mm thick glass in M.S. Section integrated Grill and handles with two coat of synthetic enamel paint over a coat of RED oxide paint. Door All doors frame shall be 100/62 mm main Door and 75/62 mm internal doors one coat wood primer with synthetic enamel paint all shutter shall be 32 mm thick flash type doors would be out of flash type Door fitted with Ply Balcony doors will be fitted with one side commercial water proof. M.S. Hinges, handle aluminum Tower Bolt, shall be provided to main door. Kitchen Floor tiles and Black stone kitchen platform with a cylinder space, sink, tap water connection and 3' ft. height glazed tiles above the platform. Toilet All toilets of western type of standard brand with standard PVC cistern. All fittings are of standard type. One hand basin (of standard type) in the dinning space along with one wash basin in one toilet of each flat. Flooring All the flooring shall be done by Vitrified Floor Tiles with 6" skirting (all bedrooms, drawing, dinning space, verandah, bath room and kitchen space). Internal Finish of Walls All internal walls and ceiling of living room bedrooms kitchen, toilet or verandah shall be finished in Putty. External Walls Painting of all external Walls will be painted with 1 coat snowcem followed by 2 coats of Berger or Asian or equivalent weathercoat paint. Sanitary or Plumbing All the internal horizontal solid and wastewater line pipe shall be 50 mm or 100 mm dia polythene pipes joint with cement mortar and exposed to wall. All the Rain Water pipes shall be 100 mm dia in good quality polythene. All the water supply pipes line shall be exposed to w
As stated by the builder; shown as filed.
RERA Registration
Phase registrations, completion timelines and available documents from the state RERA record.
Phase 1
WBRERA/P/KOL/2025/002848
West Bengal RERA
- Registered on
- Not stated
- Completion by
- Not stated
Snapshot coverage unavailable
West Bengal is not covered by this registry snapshot
No registration conclusion can be drawn from this snapshot. Check the live state portal before you transact.
- Snapshot checked
- 21 Jul 2026
- Check the official portal
- Open WB RERA portal ↗
Registry documents
Mirrored from the state RERA registry
No mirrored registry documents available
Document availability varies by state portal. Use the official RERA portal below for the latest filed records.
About Bose Ashirbaad Apartment
Check out Bose Ashirbaad Apartment in Kalighat, Sarat Bose Road, one of the upcoming under-construction housing societies in Kolkata South. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Bose Developer, Bose Ashirbaad Apartment is scheduled for possession in Aug, 2029. This housing society has multiple property options to offer, in varied price range, making it one of the most suitable address to own, that too in your budget. Being a RERA-registered society, the project details and…More ↓Less ↑
Check out Bose Ashirbaad Apartment in Kalighat, Sarat Bose Road, one of the upcoming under-construction housing societies in Kolkata South. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Bose Developer, Bose Ashirbaad Apartment is scheduled for possession in Aug, 2029. This housing society has multiple property options to offer, in varied price range, making it one of the most suitable address to own, that too in your budget. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The RERA registration number of this project is WBRERA/P/KOL/2025/002848. Bose Developer is one of the known real estate brands in Kolkata South. There is 1 project of this builder, which is currently under-construction. Here’s everything you need to know about the must-know features of this housing society along with Bose Ashirbaad Apartment, Payment Plans and other exciting facts about your future home:
Location Advantages
Key destinations around Bose Ashirbaad Apartment
Ashutosh Nursing Home
Hospital · 0.1 km
Probal Eye Institute
Hospital · 0.1 km
Kalighat Gate 2
Metro / Rail · 0.1 km
Jatin Das Park Gate 6
Metro / Rail · 0.2 km
Palm Springs
Hospital · 0.2 km
Kalighat Park
Park · 0.2 km
Price Comparison
Current asking rates for this project, its locality and Kolkata.
Today’s asking rates
Project, locality and city benchmarks
Stamp duty and registration · West Bengal
- Stamp duty — 5 % of value up to Rs 1 crore in Rural areas
- 5% of value up to ₹1 crore in Rural areas
- Stamp duty — 6 % of value up to Rs 1 crore in Urban areas
- 6% of value up to ₹1 crore in Urban areas
- Stamp duty — 6 % above Rs 1 crore in Rural and Urban areas(Rates applicable to both Male and Female).
- 6% above ₹1 crore in Rural and Urban areas(Rates applicable to both Male and Female).
- Registration
- 1% of Value
Recorded state rates for reference. Confirm the applicable amount at registration.
Project and locality asking-rate medians come from the PropertyBaazi project records in the sample shown. Registered rates come from government transaction records. Neither is a valuation, index or forecast.
Market Snapshot for Kalighat
Computed from 5 Kalighat projects in our catalogue (1 with a per-sqft price).
5 projects here, by price band
Society Reviews
Reviews by residents
No written reviews yet
Be the first to share a first-hand experience.
Explore life around Bose Ashirbaad Apartment
Understand daily conveniences and connectivity around the project before planning a visit.
Based on 5 projects listed in Kalighat on PropertyBaazi — our catalog, not a market index.
Aerial distances measured on the map from the project’s recorded location — straight lines, not routes. Map data © OpenStreetMap contributors.
View on mapMetro & Rail 6
- Kalighat Gate 2150 m
- Jatin Das Park Gate 6160 m
- Jatin Das Park Gate 5190 m
- Jatin Das Park380 m
- Kalighat430 m
+1 more
Schools 5
- The New Horizon High School540 m
- Tirthapati Institution840 m
- Mitra Institution Bhowanipore Branch980 m
- Nava Nalanda High School1.9 km
- M G Rungta Academy2.1 km
Colleges 3
- Shyama Prasad College500 m
- Jogomaya Devi College510 m
- Asutosh College520 m
Hospitals 4
- Ashutosh Nursing Home90 m
- Probal Eye Institute150 m
- Palm Springs190 m
- Paramount Nursing Home430 m
Shopping & Markets 2
- Lake Mall540 m
- Shatadip shopping1.9 km
Parks 4
- Kalighat Park190 m
- Beltala Sishu Uddyan700 m
- রবীন্দ্র সরোবর1.8 km
- Chirantani math1.9 km
Banks 3
- Axis Bank390 m
- State Bank of India1 km
- Indian Bank1.3 km
Clinic 1
- CGHS Dispensary, Bhownipur-Kalighat200 m
Pharmacy 2
- Get Well500 m
- Sri Ramakrishna Pharmacy950 m
Railway 2
- Tollygunge1.5 km
- Lake Gardens1.6 km
Supermarket 1
- Food Bazaar1.6 km
Straight-line distances, approximate, measured from the project’s recorded location. Data © OpenStreetMap contributors.
Similar Projects
Comparable projects around Kalighat
About Bose Developer

Bose Developer
1 projects on PropertyBaazi
Frequently Asked Questions
When can I move into Bose Ashirbaad Apartment?
Bose Ashirbaad Apartment is still under construction, with possession expected around Aug, 2029.
Is Bose Ashirbaad Apartment a RERA-registered project?
Yes. Bose Ashirbaad Apartment is registered with the state RERA under number WBRERA/P/KOL/2025/002848, which you can verify on the official RERA portal.
Where is Bose Ashirbaad Apartment and how well-connected is it?
Bose Ashirbaad Apartment is located in Kalighat, Kolkata. The nearest metro is about 0.38 km away.
How big is the Bose Ashirbaad Apartment project?
Bose Ashirbaad Apartment is spread across 0.1 acres, 1 tower, up to 3 floors and 8 homes.
What's around Bose Ashirbaad Apartment for daily needs?
Close to Bose Ashirbaad Apartment you'll find hospitals such as Probal Eye Institute and Palm Springs, schools like The New Horizon High School and Nava Nalanda High School.
Who is developing Bose Ashirbaad Apartment?
Bose Ashirbaad Apartment is being developed by Bose Developer.
What stamp duty and registration charges apply at Bose Ashirbaad Apartment?
Beyond the home price, budget for stamp duty (from about 5%) plus registration charges when you buy at Bose Ashirbaad Apartment.
Quick Links
Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.


