Skip to main content

Outdoors

Elevation

01/10

DTG Avenue 68

Outdoors · 1 of 10

DTG Avenue 68 — Elevation

Elevation

DTG Avenue 68

Dahisar, Mumbai

RERA Registered+8 Top Facilities

Construction Status

New launch

Possession will start from Jun, 2028

Price on request

Price on request

Download Brochure

1 BHK

Carpet Area

401–450 sqft

Price on Request

2 BHK

Carpet Area

550–652 sqft

Price on Request

Project Details

Project area
0.32 acres
Towers
1
Total units
162
Floors
19
Open area
10%
Unit sizes
401–652 sqft · Carpet Area
Configurations
1, 2 BHK
Property type
Apartment
Possession
Completion in Jun, 2028
Specifications
Flooring Designer flooring tiles (Varmora / Kajaria) Bathrooms Sanitary & CP
Fittings
Kohler fittings Exhaust
Fan
Provision Kitchen Granite kitchen platform Stainless steel sink Exhaust fans Doors and Windows Laminated flush doors in all rooms Anodized aluminum sliding windows Locks (Godrej) Finishes Gypsum finished walls with paint Texture paint for external walls Electrical LED lights in all rooms Branded electrical switches Plumbing Pipes and fittings (Tata Pipes / Finolex) Structure Cement (UltraTech) Steel (Tata Steel / JSW Steel) Brick bat waterproofing Facilities High speed elevators with ARD of reputed brand

(OTIS)

Security 24/7

CCTV

camera surveillance of common areas Fire fighting & fire alarm system

As stated by the builder; shown as filed.

RERA Registration

Phase registrations, completion timelines and available documents from the state RERA record.

  • Phase 1

    P51800077508

    Maharashtra RERA

    Registered on
    Not stated
    Completion by
    Not stated
    Registered

Not found in this snapshot

No matching registry entry was found

The registration was not found in our Maharashtra, Tamil Nadu, Karnataka, Haryana, Uttar Pradesh and Gujarat snapshot. This does not mean the project is unregistered; check the live state portal before you transact.

Snapshot checked
21 Jul 2026
Check the official portal
Open MahaRERA portal ↗

Registry documents

Mirrored from the state RERA registry

0 documents

No mirrored registry documents available

Document availability varies by state portal. Use the official RERA portal below for the latest filed records.

About DTG Avenue 68

Dhariwal DTG Avenue 68 is a residential development in Dahisar, Western Mumbai. The project is built by Dhariwal Thirani Constructions . They provide 1BHK, 2BHK apartments with all necessities.

Top Facilities

8 facilities recorded for this project

  • Gymnasium
  • Children's Play Area
  • Gazebo
  • Car Parking
  • 24/7 Water Supply
  • Fire Fighting Systems
  • Terrace Garden
  • Rain Water Harvesting

Location Advantages

Key destinations around DTG Avenue 68

National Highway 48

Highway · 0.5 Km

Dahisar Railway Station

Railway Station · 0.65 Km

Dahisar East metro station

Metro Station · 1.2 Km

The Orion Business Park

Office complex · 3.6 Km

Raghuleela Mega Mall

Shopping Center/ Market/ Mall · 5.2 Km

Podar International School

School · 5.8 Km

View Official Brochure

Official brochure

DTG Avenue 68

22 pages · 10.9 MB · PDF

Published by the builder; shown as filed.

Reading here is free. Downloading sends your enquiry to the seller so they can follow up.

Price list

Published by the builder; shown as filed. Downloading sends the same enquiry.

Market Snapshot for Dahisar

Computed from 13 Dahisar projects in our catalogue (3 with a per-sqft price).

13 projects here, by price band

Affordable
2
Premium
1

Society Reviews

Reviews by residents

No written reviews yet

Be the first to share a first-hand experience.

Locality overview

Explore life around DTG Avenue 68

Understand daily conveniences and connectivity around the project before planning a visit.

View full locality insights
12
Projects listed
1, 2 BHK
Popular configurations
New launch
Most common status

Based on 12 projects listed in Dahisar on PropertyBaazi — our catalog, not a market index.

Distances and travel times are approximate. Confirm routes and access conditions before making a purchase decision.
Builder

About Dhariwal Thirani Group

View builder profile
Dhariwal Thirani Group logo

Dhariwal Thirani Group

3 projects on PropertyBaazi

Dhariwal Thirani Group is a real estate developer focused on creating quality homes and commercial spaces. They aim to provide value and build lasting relationships with their customers.

Projects by Dhariwal Thirani Group

FAQs

Frequently Asked Questions

Is DTG Avenue 68 ready to move in?

DTG Avenue 68 is still under construction, with possession expected around Jun, 2028.

Is DTG Avenue 68 a RERA-registered project?

Yes. DTG Avenue 68 is registered with the state RERA under number P51800077508, which you can verify on the official RERA portal.

How much should I budget for DTG Avenue 68?

DTG Avenue 68 offers 1, 2 BHK Apartment, sized 401–652 sq.ft carpet area. Current pricing is shared on request — download the brochure from the project page for the latest price list.

Where is DTG Avenue 68 and how well-connected is it?

DTG Avenue 68 is located in Dahisar, Mumbai.

How big is the DTG Avenue 68 project?

DTG Avenue 68 is spread across 0.3 acres, 1 tower, up to 19 floors and 162 homes.

What can residents enjoy at DTG Avenue 68?

DTG Avenue 68 comes with 8 amenities, including Gymnasium, Children's Play Area, Terrace Garden, Gazebo, Car Parking and Fire Fighting Systems.

What's around DTG Avenue 68 for daily needs?

Close to DTG Avenue 68 you'll find hospitals such as Kk Maternity and General Hospital and Navneet Hi-Tech Hospital, schools like Rustomjee Cambridge International school and Vidhyamandir School.

Who is developing DTG Avenue 68?

DTG Avenue 68 is being developed by Dhariwal Thirani Group.

Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.