Skip to main content

Outdoors

Elevation

01/18

Happy The Impressia

Outdoors · 1 of 18

Happy The Impressia — Elevation

Elevation

Happy The Impressia

New City Light, Surat

RERA Registered+15 Top Facilities

Construction Status

Under construction

Possession will start from Aug, 2029

₹3.17 Cr

Price range· ₹11,450/sqft

Download Brochure

4 BHK

Carpet Area

2769–3145 sqft

₹3.17 Cr

5 BHK

Carpet Area

3710–3729 sqft

Price on Request

6 BHK

Carpet Area

6363 sqft

Price on Request

Project Details

Project area
1.51 acres
Towers
2
Total units
68
Floors
18
Open area
76%
Unit sizes
2,769–6,363 sqft · Carpet Area
Price per sqft
₹11,450
Configurations
4, 5, 6 BHK
Property type
Apartment
Possession
Completion in Aug, 2029
Specifications

Flooring - Italian figure vitrified 8'x4' slab in full flat Deck - Wooden figure vitrified Platform - Granite kitchen platform & vitrified dedo Store Rack - Granite rack & granamite dedo Toilet - Italian figure vitrified dedo & floor Plumbing - As specified by reputed plumbing consultant Pressure pump for better water supply - Centrally plumbing pattern in individual flat for hot water supply - ISI standard C.P. piping Door - Granite framing - Main door decorative & other flush doors Window - Powder coated aluminium window with granite frame - D.G.U. clear glass Electrification - M.C.B. in individual flat - Modular switches - Concealed copper wiring as per ISI std. - A.C. & T.V. point in all bedrooms, oven, purifiers & mixer point at the kitchen - washing machine & gas geyser point at wash area Hardware - Stainless steel fitting External Wall - Two coat plaster and exterior dry wall cladding External Finish - Tiles cladding & texture colour Inner Finish - Gypsum plaster Parking Flooring - Trimix in basement & ground level paver block flooring Water Tank - Underground water tank for campus - Over head water tank per tower plus underground fire tank separately Stair Case Flooring - Granite tappa & vitrified riser Railing - Aluminium glass railing in balcony & R.C.C. pardi in stair & terrace floor Terrace - Double coat waterproof with chemical plaster china mosaic flooring Lounge Flooring - Italian marble flooring Amenities / Facilities - projectAmenities - matchedAmenities

As stated by the builder; shown as filed.

RERA Registration

Phase registrations, completion timelines and available documents from the state RERA record.

  • Phase 1

    RAA14208/300924/150829

    Gujarat RERA

    Registered on
    Not stated
    Completion by
    Not stated
    Registered

Not found in this snapshot

No matching registry entry was found

The registration was not found in our Maharashtra, Tamil Nadu, Karnataka, Haryana, Uttar Pradesh and Gujarat snapshot. This does not mean the project is unregistered; check the live state portal before you transact.

Snapshot checked
21 Jul 2026
Check the official portal
Open GujRERA portal ↗

Registry documents

Mirrored from the state RERA registry

0 documents

No mirrored registry documents available

Document availability varies by state portal. Use the official RERA portal below for the latest filed records.

About Happy The Impressia

Check out Happy The Impressia in New City Light, one of the upcoming under-construction housing societies in Surat. There are apartments for sale in Happy The Impressia New City Light, Surat. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Happy Home Buildcon, Happy The Impressia is scheduled for possession in Aug, 2029. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The RERA registration number of thisMore ↓

Check out Happy The Impressia in New City Light, one of the upcoming under-construction housing societies in Surat. There are apartments for sale in Happy The Impressia New City Light, Surat. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Happy Home Buildcon, Happy The Impressia is scheduled for possession in Aug, 2029. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The RERA registration number of this project is RAA14208/300924/150829. Here’s everything you need to know about the must-know features of this housing society along with Happy The Impressia Photos, Floor Plans, Payment Plans, Brochure download procedure and other exciting facts about your future home:

Top Facilities

15 facilities recorded for this project

  • Swimming Pool
  • Gymnasium
  • Jogging Track
  • Yoga / Meditation Area
  • Cricket Pitch
  • Indoor Games
  • Club House
  • Children's Play Area
  • Banquet Hall

Location Advantages

Key destinations around Happy The Impressia

Nanduba CBSE English Academy

School · 650m

Niyati Hospital

Hospital · 3.2km

Central Plaza

Shopping Center/ Market/ Mall · 250m

Bhagwan Mahavir University

University · 2.1km

Udhna Junction

Railway Station · 7.8km

Surat International Airport

Airport · 9.1km

View Official Brochure

Official brochure

Happy The Impressia

46 pages · 11.4 MB · PDF

Published by the builder; shown as filed.

Reading here is free. Downloading sends your enquiry to the seller so they can follow up.

Price list

Published by the builder; shown as filed. Downloading sends the same enquiry.

Market Snapshot for New City Light

Computed from 9 New City Light projects in our catalogue (5 with a per-sqft price).

9 projects here, by price band

Affordable
2
Premium
2
Luxury
1

Society Reviews

Reviews by residents

No written reviews yet

Be the first to share a first-hand experience.

Locality overview

Explore life around Happy The Impressia

Understand daily conveniences and connectivity around the project before planning a visit.

View full locality insights
6
Projects listed
3, 4 BHK
Popular configurations
Ready to move
Most common status

Based on 6 projects listed in New City Light on PropertyBaazi — our catalog, not a market index.

Distances and travel times are approximate. Confirm routes and access conditions before making a purchase decision.
Builder

About Happy Home Buildcon

View builder profile
Happy Home Buildcon logo

Happy Home Buildcon

1 projects on PropertyBaazi

Happy Home Buildcon is a real estate developer based in Ahmedabad, committed to providing quality homes and customer satisfaction. They focus on innovation and timely delivery in their projects.

FAQs

Frequently Asked Questions

Is Happy The Impressia ready to move in?

Happy The Impressia is still under construction, with possession expected around Aug, 2029.

Is Happy The Impressia a RERA-registered project?

Yes. Happy The Impressia is registered with the state RERA under number RAA14208/300924/150829, which you can verify on the official RERA portal.

What does a home at Happy The Impressia cost?

Homes at Happy The Impressia are priced ₹3.17 Cr (about ₹11,450/sq.ft) for 4, 5, 6 BHK Apartment, sized 2,769–6,363 sq.ft carpet area.

Where is Happy The Impressia and how well-connected is it?

Happy The Impressia is located in New City Light, Surat.

How big is the Happy The Impressia project?

Happy The Impressia is spread across 1.5 acres, 2 towers, up to 18 floors and 68 homes.

What can residents enjoy at Happy The Impressia?

Happy The Impressia comes with 15 amenities, including Swimming Pool, Gymnasium, Club House, Children's Play Area, Landscape Garden and Banquet Hall.

What's around Happy The Impressia for daily needs?

Close to Happy The Impressia you'll find hospitals such as Jinwala Hospital and Prathna Multispeciality Hospital.

Who is developing Happy The Impressia?

Happy The Impressia is being developed by Happy Home Buildcon.

Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.