Outdoors
Aerial View
Select a view or open the gallery
Hilltown The Overa
Koba, Gandhinagar
Construction Status
Under construction
Possession will start from Jun, 2028
₹1.24 Cr - 1.62 Cr
Price range· ₹9,281/sqft
3 BHK
Super Built-up Area
2925 sqft
₹1.24 Cr
4 BHK
Carpet Area
1336 sqft
₹1.5 - 1.62 Cr
Project Details
- Project area
- 1.17 acres
- Towers
- 2
- Total units
- 108
- Floors
- 15
- Open area
- 57%
- Unit sizes
- 1,336 sqft · Carpet Area
- Price per sqft
- ₹9,281
- Configurations
- 3, 4 BHK
- Property type
- Apartment
- Possession
- Completion in Jun, 2028
Specifications
CONSTRUCTION
- Enhanced structured safety against earthquake for relevant zone
COLOUR
- All building finished with outside standard quality paint
SECURITY SYSTEM
- Campus will be protected by compound wall from the boundaries Highly secured campus with security cabin at entry-exit &
CCTV
- at main gate, lift & building foyer. 24 hours security in campus.
LANDSCAPE
- Professionally designed & executed landscaping
ENTRANCE FOYER
- Fully furnished foyer with reception table & waiting lounge
CCTC
- camera & LCD display & name board
TERRACE
- Double Coat Water proofing in terrace with decorative flooring.
ELEVATORS CONFIGURATION
- Premium quality lift with safety devise in case of emergency
WATER SUPPLY
- Sufficient water tank will be provided with adequate water supply.
PLASTER
- Good quality plaster finishing as per design
P PARKING
- Ground and 1st level basement car parking
GENERATOR
- Generator for sufficient power backup for common area of building, basement, lift and flats.
FLOORING:
- Living room/dinning, kitchen and all bedrooms vitrified granamite tiles. Kota stone flooring in wash and glazed tiles dado up to parapet Ivl. Toilet tiles upto beam bottom level.
KITCHEN:
- Kitchen platform will be made of granite stone with SS sink Kitchen dado tiles upto beam bottom Ivl
DOORS:
- Main door will be decorative and other doors are flush door with wooden frame
WINDOWS:
- All windows of anodized aluminium sections and window framing in granite
ELECTRIFICATION:
- Concealed circuit wiring of standard
(ISI MARK)
- company with modular switches and
MCB TV
- point in all bedrooms and AC point in master bedroom
PLUMBING:
- Concealed plumbing with standard sanitary ware & C.P. fitting
UPVC
- pipes for water supply, PVC pipes for drainage
STAIRCASE:
- Staircase finished with granite / vitrified tile
HEIGHT:
- 12'Ft Per floor hight
As stated by the builder; shown as filed.
RERA Registration
Phase registrations, completion timelines and available documents from the state RERA record.
Phase 1
MAA14557/211224/300628
Gujarat RERA
- Registered on
- Not stated
- Completion by
- Not stated
Not found in this snapshot
No matching registry entry was found
The registration was not found in our Maharashtra, Tamil Nadu, Karnataka, Haryana, Uttar Pradesh and Gujarat snapshot. This does not mean the project is unregistered; check the live state portal before you transact.
- Snapshot checked
- 21 Jul 2026
- Check the official portal
- Open GujRERA portal ↗
Registry documents
Mirrored from the state RERA registry
No mirrored registry documents available
Document availability varies by state portal. Use the official RERA portal below for the latest filed records.
About Hilltown The Overa
Check out Hilltown The Overa in Koba, one of the upcoming under-construction housing societies in Gandhinagar. There are apartments for sale in Hilltown The Overa Koba, Gandhinagar. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Hilltown Group, Hilltown The Overa is scheduled for possession in Jun, 2028. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The RERA registration number of this project is…More ↓Less ↑
Check out Hilltown The Overa in Koba, one of the upcoming under-construction housing societies in Gandhinagar. There are apartments for sale in Hilltown The Overa Koba, Gandhinagar. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Hilltown Group, Hilltown The Overa is scheduled for possession in Jun, 2028. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The RERA registration number of this project is MAA14557/211224/300628. Hilltown Group is one of the known real estate brands in Gandhinagar. Around 1 project is upcoming. There are 2 projects of this builder, which are currently under-construction. Here’s everything you need to know about the must-know features of this housing society along with Hilltown The Overa Photos, Brochure download procedure and other exciting facts about your future home:
Top Facilities
11 facilities recorded for this project
- Swimming Pool
- Jogging Track
- Indoor Games
- Gazebo
- Wheelchair Accessible
- 24/7 Water Supply
- Earthquake Resistant
- CCTV Camera Security
- Security Cabin
Location Advantages
Key destinations around Hilltown The Overa
Sardar Vallabhbhai Patel Airport
Airport · 9.7 km
Aashka Multispeciality Hospital
Hospital · 10 km
School of Achiever
School · 4.9 km
Karnavati University
University · 12.2 km
Shree Balaji Agora Mall
Shopping Center/ Market/ Mall · 5.7 km
Khodiyar Station
Railway Station · 13.9 km
View Official Brochure
Official brochure
Hilltown The Overa
18 pages · 13.6 MB · PDF
Published by the builder; shown as filed.
Reading here is free. Downloading sends your enquiry to the seller so they can follow up.
Price Comparison
Current asking rates for this project, its locality and Gandhinagar.
Today’s asking rates
Project, locality and city benchmarks
Configuration rates in Koba3 configurations
- 2 BHK
- ₹11,390/sqft · 5 samples
- 3 BHK
- ₹7,526/sqft · 11 samples
- 4 BHK
- ₹6,861/sqft · 8 samples
Stamp duty and registration · Gujarat
- Stamp duty — 5.9 % for Male
- 5.9% for Male
- Stamp duty — 4.9 % for Female
- 4.9% for Female
- Stamp duty — 5.9 % for Joint (Male and Female)
- 5.9% for Joint (Male and Female)
- Stamp duty — 4.9 % For Joint (Female and Female)
- 4.9% For Joint (Female and Female)
- Registration
- Male Ownership: 1%
- Registration
- Female Ownership: No registration charges
- Registration
- Joint (Male + Female) Ownership: 1%
Recorded state rates for reference. Confirm the applicable amount at registration.
Project and locality asking-rate medians come from the PropertyBaazi project records in the sample shown. Registered rates come from government transaction records. Neither is a valuation, index or forecast.
Market Snapshot for Koba
Computed from 38 Koba projects in our catalogue (20 with a per-sqft price).
38 projects here, by price band
Society Reviews
Reviews by residents
No written reviews yet
Be the first to share a first-hand experience.
Explore life around Hilltown The Overa
Understand daily conveniences and connectivity around the project before planning a visit.
Based on 37 projects listed in Koba on PropertyBaazi — our catalog, not a market index.
Distances as recorded by the builder — approximate; please confirm on the ground.
View on mapMetro & Rail 2
- Khodiyar Station13.9 km
- Motera Stadium8.4 km
Schools 1
- School of Achiever4.9 km
Colleges & Universities 1
- Karnavati University12.2 km
Hospitals 1
- Aashka Multispeciality Hospital10 km
Shopping & Malls 1
- Shree Balaji Agora Mall5.7 km
Parks & Leisure 1
- IndrodaZoo7.9 km
Business Hubs 1
- Inspire Business Park15.3 km
Roads & Connectivity 1
- NH489.0 km
Airport 1
- Sardar Vallabhbhai Patel Airport9.7 km
Hotels 1
- Grand Mercure Ahmedabad9.3 km
Sports & Stadiums 1
- Narendra Modi Stadium8.4 km
Golf 1
- The Belvedere Golf Club16.8 km
Distances as recorded when the project was listed — approximate; please confirm on the ground.
Similar Projects
Comparable projects around Koba
About Hilltown Group

Hilltown Group
4 projects on PropertyBaazi
Projects by Hilltown Group
Frequently Asked Questions
Is Hilltown The Overa ready to move in?
Hilltown The Overa is still under construction, with possession expected around Jun, 2028.
Does Hilltown The Overa have RERA approval?
Yes. Hilltown The Overa is registered with the state RERA under number MAA14557/211224/300628, which you can verify on the official RERA portal.
What are prices and sizes like at Hilltown The Overa?
Homes at Hilltown The Overa are priced ₹1.24 Cr - 1.62 Cr (about ₹9,281/sq.ft) for 3, 4 BHK Apartment, sized 1,336 sq.ft carpet area.
Whereabouts is Hilltown The Overa, and what's the commute like?
Hilltown The Overa is located in Koba, Gandhinagar.
What's the scale of Hilltown The Overa?
Hilltown The Overa is spread across 1.2 acres, 2 towers, up to 15 floors and 108 homes.
What amenities does Hilltown The Overa offer?
Hilltown The Overa comes with 11 amenities, including Swimming Pool, Gazebo, Jogging Track, Indoor Games, Flower Garden and Earthquake Resistant.
Which builder is behind Hilltown The Overa?
Hilltown The Overa is being developed by Hilltown Group.
What costs should I plan beyond the price of Hilltown The Overa?
Beyond the home price, budget for stamp duty (from about 4.9%) plus registration charges when you buy at Hilltown The Overa.
Quick Links
Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.






