Skip to main content

Outdoors

Aerial View

01/10

Jigar Hari Nandan Residency

Outdoors · 1 of 10

Jigar Hari Nandan Residency — Aerial View

Aerial View

Jigar Hari Nandan Residency

Bareja, Ahmedabad

RERA Registered+17 Top Facilities

Construction Status

New launch

Possession will start from Dec, 2028

Price on request

Price on request

Download Brochure

Project Details

Project area
0.38 acres
Towers
2
Total units
49
Floors
7
Open area
54%
Property type
Shop/Commercial
Possession
Completion in Dec, 2028
Specifications

Flooring High-quality vitrified tiles flooring throughout the apartment units. Bathrooms Toilets featuring high-quality color glazed tiles dado up to lintel level. Kitchen Premium granite platform with a stainless steel sink and glazed tile dado up to lintel level. Doors and Windows Decorative main entrance doors, flush doors for internal rooms, and fully glass aluminum section windows. Finishes Internal walls with smooth finished plaster and white putty, and external walls with sand-faced plaster and acrylic color. Electrical Concealed copper wiring with good quality switches and provisions for television, telephone, and washing machine points. Plumbing Concealed plumbing systems with fixtures and fittings of reputed makes. Structure High-quality R.C.C. frame structure designed for stability and safety.

As stated by the builder; shown as filed.

RERA Registration

Phase registrations, completion timelines and available documents from the state RERA record.

  • Phase 1

    MAA16847/180526/311228

    Gujarat RERA

    Registered on
    Not stated
    Completion by
    Not stated
    Registered

Not found in this snapshot

No matching registry entry was found

The registration was not found in our Maharashtra, Tamil Nadu, Karnataka, Haryana, Uttar Pradesh and Gujarat snapshot. This does not mean the project is unregistered; check the live state portal before you transact.

Snapshot checked
21 Jul 2026
Check the official portal
Open GujRERA portal ↗

Registry documents

Mirrored from the state RERA registry

0 documents

No mirrored registry documents available

Document availability varies by state portal. Use the official RERA portal below for the latest filed records.

About Jigar Hari Nandan Residency

For those looking to buy a residential property, here comes one of the choicest offerings in Ahmedabad East, at Bareja. Brought to you by Jigar Enterprise Ahmedabad, Jigar Hari Nandan Residency is among the newest addresses for homebuyers. This is a new launch project right now, and is expected to be delivered by Dec, 2028. It has a variety of options to choose from that too in a varied budget range. Jigar Hari Nandan Residency Ahmedabad East is a RERA-registered housing society, which means all projects details are also available on state RERA websiteMore ↓

For those looking to buy a residential property, here comes one of the choicest offerings in Ahmedabad East, at Bareja. Brought to you by Jigar Enterprise Ahmedabad, Jigar Hari Nandan Residency is among the newest addresses for homebuyers. This is a new launch project right now, and is expected to be delivered by Dec, 2028. It has a variety of options to choose from that too in a varied budget range. Jigar Hari Nandan Residency Ahmedabad East is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERA registration number of this project is MAA16847/180526/311228. Jigar Enterprise Ahmedabad is one of the known real estate brands in Ahmedabad East.The builder has delivered 1 project so far. Read on to know more about must-know features, Jigar Hari Nandan Residency, Photos, Brochure download procedure and other exciting facts about the project.

Top Facilities

17 facilities recorded for this project

  • Car Parking
  • DTH Television
  • Entrance Lobby
  • 24/7 Water Supply
  • Gated Community
  • Fire NOC
  • CCTV Camera Security
  • Fire Fighting Systems
  • 24/7 Security

Location Advantages

Key destinations around Jigar Hari Nandan Residency

Shriji General Hospital

Hospital · 1.1 km

View Official Brochure

Official brochure

Jigar Hari Nandan Residency

16 pages · 3.4 MB · PDF

Published by the builder; shown as filed.

Reading here is free. Downloading sends your enquiry to the seller so they can follow up.

Market Snapshot for Bareja

Computed from 7 Bareja projects in our catalogue.

7 projects here, by price band

Budget
1

Government charges

Stamp duty — 5.9 % for Male5.9 % for Male

Stamp duty — 4.9 % for Female4.9 % for Female

Stamp duty — 5.9 % for Joint (Male and Female)5.9 % for Joint (Male and Female)

Stamp duty — 4.9 % For Joint (Female and Female)4.9 % For Joint (Female and Female)

RegistrationMale Ownership: 1%

RegistrationFemale Ownership: No registration charges

RegistrationJoint (Male + Female) Ownership: 1 %

As recorded for this state — confirm current rates at registration.

Society Reviews

Reviews by residents

No written reviews yet

Be the first to share a first-hand experience.

Locality overview

Explore life around Jigar Hari Nandan Residency

Understand prices, daily conveniences and connectivity around the project before planning a visit.

View full locality insights
7
Projects listed
₹29 L
Median starting price
2, 3 BHK
Popular configurations
New launch
Most common status

Based on 7 projects listed in Bareja on PropertyBaazi — our catalog, not a market index.

Loading map…
  • Hospital

Straight-line distances, approximate. Map data © OpenStreetMap contributors; satellite imagery © Esri, Maxar, Earthstar Geographics.

Distances and travel times are approximate. Confirm routes and access conditions before making a purchase decision.
Builder

About Jigar Enterprise Ahmedabad

View builder profile
Jigar Enterprise Ahmedabad logo

Jigar Enterprise Ahmedabad

1 projects on PropertyBaazi

Jigar Enterprise Ahmedabad aims to redefine the real estate industry by developing and delivering state of the art projects. It is committed to providing quality spaces that enrich today and envisage tomorrow. It strives to make its presence felt by developing high-quality projects that provide value for money and the highest customer satisfaction. The company leaves no stone unturned in ensuring that the property-related needs and expectations of the customers are met.

FAQs

Frequently Asked Questions

When can I move into Jigar Hari Nandan Residency?

Jigar Hari Nandan Residency is still under construction, with possession expected around Dec, 2028.

Does Jigar Hari Nandan Residency have RERA approval?

Yes. Jigar Hari Nandan Residency is registered with the state RERA under number MAA16847/180526/311228, which you can verify on the official RERA portal.

Whereabouts is Jigar Hari Nandan Residency, and what's the commute like?

Jigar Hari Nandan Residency is located in Bareja, Ahmedabad.

What's the scale of Jigar Hari Nandan Residency?

Jigar Hari Nandan Residency is spread across 0.4 acres, 2 towers, up to 7 floors and 49 homes.

What amenities does Jigar Hari Nandan Residency offer?

Jigar Hari Nandan Residency comes with 17 amenities, including Landscape Garden, Shopping Centre, Car Parking, Gated Community, Paved Compound and Internal Street Lights.

What conveniences are near Jigar Hari Nandan Residency?

Close to Jigar Hari Nandan Residency you'll find hospitals such as Shriji General Hospital.

Which builder is behind Jigar Hari Nandan Residency?

Jigar Hari Nandan Residency is being developed by Jigar Enterprise Ahmedabad.

What costs should I plan beyond the price of Jigar Hari Nandan Residency?

Beyond the home price, budget for stamp duty (from about 4.9%) plus registration charges when you buy at Jigar Hari Nandan Residency.

Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.