Skip to main content

Outdoors

Villas

01/14

Linc Raghavan Green Valley Phase 3

Outdoors · 1 of 14

Linc Raghavan Green Valley Phase 3 — Villas

Villas

Linc Raghavan Green Valley Phase 3

Aradi Socorro, North Goa

RERA RegisteredFloor Plans Available+15 Top Facilities

Construction Status

Ready to move

Possession completed (Aug 2024)

₹4.5 Cr

Price range· ₹22,500/sqft

Download Brochure

4 BHK

Carpet Area

2000 sqft

₹4.5 Cr

Project Details

Project area
0.748 acres
Total units
13
Floors
3
Open area
70%
Unit sizes
2,000 sqft · Carpet Area
Price per sqft
₹22,500
Configurations
4 BHK
Property type
Villa
Possession
Ready to move
Specifications
R.C.C framed structure Vitrified floor Marble stairs Granite L shape platform with stainless steel sink Light / white colored sanitary ware / hot / cold arrangements with

ASTM

and SWR pipes A.C provision for entire units Concealed electrical conduit with necessary plug/power points Inverter provision Interior with acrylic imulsion of Asian paints and exterior with weather protective paints Anodised aluminium windows M.S designer railings for roof tiles Imported shingles M.S grills for windows Anti crack treatment in plasters

As stated by the builder; shown as filed.

RERA Registration

Phase registrations, completion timelines and available documents from the state RERA record.

  • Phase 3

    PRGO11190964

    Goa RERA

    Registered on
    Not stated
    Completion by
    Not stated
    Registered

Snapshot coverage unavailable

Goa is not covered by this registry snapshot

No registration conclusion can be drawn from this snapshot. Check the live state portal before you transact.

Snapshot checked
21 Jul 2026
Check the official portal
Open Goa RERA portal ↗

Registry documents

Mirrored from the state RERA registry

0 documents

No mirrored registry documents available

Document availability varies by state portal. Use the official RERA portal below for the latest filed records.

Floor Plans & Pricing

Available configurations, areas and recorded pricing.

3 BHK

3 layouts

3 BHK Villa

1530.09 sq.ft.

3 BHK Villa

2968.69 sq.ft.

3 BHK Villa

2968.69 sq.ft.

About Linc Raghavan Green Valley Phase 3

Check out Linc Raghavan Green Valley Phase 3 in Aradi Socorro, one of the upcoming under-construction housing societies in North Goa. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Linc Property Developers, Linc Raghavan Green Valley Phase 3 is scheduled for possession in Sep, 2024. This housing society has multiple property options to offer, in varied price range, making it one of the most suitable address to own, that too in your budget. Being a RERA-registered society, theMore ↓

Check out Linc Raghavan Green Valley Phase 3 in Aradi Socorro, one of the upcoming under-construction housing societies in North Goa. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Linc Property Developers, Linc Raghavan Green Valley Phase 3 is scheduled for possession in Sep, 2024. This housing society has multiple property options to offer, in varied price range, making it one of the most suitable address to own, that too in your budget. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The RERA registration number of this project is PRGO11190964. Linc Property Developers is one of the known real estate brands in North Goa.The builder has delivered 9 projects so far. Around 1 project is upcoming. Here’s everything you need to know about the must-know features of this housing society along with Linc Raghavan Green Valley Phase 3 Price List, Photos, Floor Plans, Payment Plans, Brochure download procedure and other exciting facts about your future home:

Top Facilities

15 facilities recorded for this project

  • Swimming Pool
  • Table Tennis
  • Indoor Games
  • Community Hall
  • Carrom
  • Water Softener Plant
  • 24/7 Water Supply
  • Car Parking
  • CCTV Camera Security

Location Advantages

Key destinations around Linc Raghavan Green Valley Phase 3

Sangath

Hospital · 0.2 km

Prabhu Hospital

Hospital · 0.3 km

Shanned Daily Mart

Mall / Market · 0.7 km

Union bank

Bank · 0.8 km

Kurias Earth Ayurveda Hospital

Hospital · 0.9 km

Chrism Medical Store

Pharmacy · 0.9 km

View Official Brochure

Official brochure

Linc Raghavan Green Valley Phase 3

17 pages · 3.6 MB · PDF

Published by the builder; shown as filed.

Reading here is free. Downloading sends your enquiry to the seller so they can follow up.

Price list

Published by the builder; shown as filed. Downloading sends the same enquiry.

Market Snapshot for Aradi Socorro

Computed from 11 Aradi Socorro projects in our catalogue (5 with a per-sqft price).

11 projects here, by price band

Premium
3
Luxury
2

Society Reviews

Reviews by residents

No written reviews yet

Be the first to share a first-hand experience.

Locality overview

Explore life around Linc Raghavan Green Valley Phase 3

Understand daily conveniences and connectivity around the project before planning a visit.

View full locality insights
11
Projects listed
2, 3 BHK
Popular configurations
Ready to move
Most common status

Based on 11 projects listed in Aradi Socorro on PropertyBaazi — our catalog, not a market index.

Distances and travel times are approximate. Confirm routes and access conditions before making a purchase decision.
Builder

About Linc Property Developers

View builder profile
Linc Property Developers logo

Linc Property Developers

8 projects on PropertyBaazi

Linc Property Developers Limited is a real estate developer in Goa, India, offering a variety of residential and commercial projects. The company focuses on quality, timely delivery, customer satisfaction, and transparency in all dealings. Under the leadership of Mr. Prakash Jalan, the company has achieved impressive growth with a focus on innovation, customer-centricity, and modern aesthetics. Their primary vision is to build relationships, dreams, and communities.

Projects by Linc Property Developers

FAQs

Frequently Asked Questions

What's the possession timeline at Linc Raghavan Green Valley Phase 3?

Linc Raghavan Green Valley Phase 3 is under construction; its earlier possession date (Aug 2024) has passed, so confirm the current handover timeline with the developer.

Is Linc Raghavan Green Valley Phase 3 a RERA-registered project?

Yes. Linc Raghavan Green Valley Phase 3 is registered with the state RERA under number PRGO11190964, which you can verify on the official RERA portal.

What does a home at Linc Raghavan Green Valley Phase 3 cost?

Homes at Linc Raghavan Green Valley Phase 3 are priced ₹4.5 Cr (about ₹22,500/sq.ft) for 4 BHK Villa, sized 2,000 sq.ft carpet area.

Where is Linc Raghavan Green Valley Phase 3 and how well-connected is it?

Linc Raghavan Green Valley Phase 3 is located in Aradi Socorro, North Goa.

How big is the Linc Raghavan Green Valley Phase 3 project?

Linc Raghavan Green Valley Phase 3 is spread across 0.7 acres, up to 3 floors and 13 homes.

What can residents enjoy at Linc Raghavan Green Valley Phase 3?

Linc Raghavan Green Valley Phase 3 comes with 15 amenities, including Swimming Pool, Solar Water Heating, Water Softener Plant, Community Hall, Table Tennis and Indoor Games.

What's around Linc Raghavan Green Valley Phase 3 for daily needs?

Close to Linc Raghavan Green Valley Phase 3 you'll find hospitals such as Sangath and Prabhu Hospital.

Who is developing Linc Raghavan Green Valley Phase 3?

Linc Raghavan Green Valley Phase 3 is being developed by Linc Property Developers.

Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.