Skip to main content

Construction

Status as on : 16 Dec 2025

01/04

Madehomes Roys Heights

Construction · 1 of 4

Madehomes Roys Heights — Status as on : 16 Dec 2025

Status as on : 16 Dec 2025

Madehomes Roys Heights

Murarpur, Gaya

RERA Registered+7 Top Facilities

Construction Status

New launch

Possession will start from Jul, 2030

Price on request

Price on request

Download Brochure

Project Details

Project area
0.1 acres
Total units
13
Floors
4
Property type
Plot/Land
Possession
Completion in Jul, 2030
Specifications
Structure Earth Quake Resistant RCC Frame structure Flooring
In stair cases
Granite/marble/Kota Stone. In
Flats
Vitrified Tiles Bathrooms Dado up to 7'0" with colored tiles Kitchen Cooking slab of granite, colored tiles up to 2' above cooking slab, sink of stainless steel Doors and Windows Door choukhat of Malaysian salwood/ equivalent hard wood. Door shutters of 30mm thick bwp grade, factory made commercial flush door (I.S.1) marked. Window choukhat of aluminium. Window shutters to be fully glazed and frames to be made of aluminium two trace section & glass Finishes Outer
Walls
Exterior Acrylic Emulsion Paint over Wall putty.
Inner walls
Plaster of Paris / Wall Putty over plastered wall. Ceiling (flat): Plaster of Paris over plastered ceiling. Ceiling (common areas): Plaster of Paris + Paint Electrical All electrical wiring pipes, conduit from I.S.I. marked materials, concealed wiring to be provided. One point for air conditioner to be provided in all bedrooms. One point for geyser in each toilet and kitchen. Good quality switches. One TV point to be provided in the drawing room, and master bedroom. One telephone point to be provided in the drawing dining room (without connection) Plumbing Internal water supply from concealed G.I/PVC pipes. Sewage and waste disposal through

UPVC

pipes, 2 nos. of deep tubewell boring to be done Security Advanced model of intercom for security purposes, with reception to flat, and flat to flat connection to be provided

As stated by the builder; shown as filed.

RERA Registration

Phase registrations, completion timelines and available documents from the state RERA record.

  • Phase 1

    BRERAP192435031025040730E00

    Bihar RERA

    Registered on
    Not stated
    Completion by
    Not stated
    Registered

Snapshot coverage unavailable

Bihar is not covered by this registry snapshot

No registration conclusion can be drawn from this snapshot. Check the live state portal before you transact.

Snapshot checked
21 Jul 2026
Check the official portal
Open Bihar RERA portal ↗

Registry documents

Mirrored from the state RERA registry

0 documents

No mirrored registry documents available

Document availability varies by state portal. Use the official RERA portal below for the latest filed records.

About Madehomes Roys Heights

For those looking to buy a residential property, here comes one of the choicest offerings in Gaya, at Murarpur. Brought to you by Madehomes Developers, Madehomes Roys Heights is among the newest addresses for homebuyers. This is a new launch project right now, and is expected to be delivered by Jul, 2030. It has a variety of options to choose from that too in a varied budget range. Madehomes Roys Heights Gaya is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. TheMore ↓

For those looking to buy a residential property, here comes one of the choicest offerings in Gaya, at Murarpur. Brought to you by Madehomes Developers, Madehomes Roys Heights is among the newest addresses for homebuyers. This is a new launch project right now, and is expected to be delivered by Jul, 2030. It has a variety of options to choose from that too in a varied budget range. Madehomes Roys Heights Gaya is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERA registration number of this project is BRERAP192435031025040730E00. Madehomes Developers is one of the known real estate brands in Gaya. Around 1 project is upcoming. Read on to know more about must-know features, Madehomes Roys Heights, Photos, Brochure download procedure and other exciting facts about the project.

Top Facilities

7 facilities recorded for this project

  • DG Availability
  • 24/7 Water Supply
  • Earthquake Resistant
  • Waste Management
  • Paved Compound
  • Garbage Disposal
  • Sewage Treatment Plant

Location Advantages

Key destinations around Madehomes Roys Heights

Jeevan Rekha Dia and Nursing Home

Hospital · 0.1 km

Nav Jeewan Nursing Home

Hospital · 0.2 km

Agrawal Surgical clinic and Hospital

Hospital · 0.2 km

Jai Prakash Narayan Hospital

Hospital · 0.3 km

Azad Park

Park · 0.4 km

Union Bank of India

Bank · 0.7 km

View Official Brochure

Official brochure

Madehomes Roys Heights

5 pages · 1.8 MB · PDF

Published by the builder; shown as filed.

Reading here is free. Downloading sends your enquiry to the seller so they can follow up.

Market Snapshot for Murarpur

Computed from 1 Murarpur project in our catalogue.

Government charges

Stamp duty — 5.7 % for Female5.7 % for Female

Stamp duty — 6.3 % for Male6.3 % for Male

Stamp duty — 6 % for Joint Ownership6 % for Joint Ownership

Registration2 % of Value

As recorded for this state — confirm current rates at registration.

Society Reviews

Reviews by residents

No written reviews yet

Be the first to share a first-hand experience.

Locality overview

Explore life around Madehomes Roys Heights

Understand prices, daily conveniences and connectivity around the project before planning a visit.

View full locality insights
Distances and travel times are approximate. Confirm routes and access conditions before making a purchase decision.
Builder

About Madehomes Developers

View builder profile
Madehomes Developers logo

Madehomes Developers

1 projects on PropertyBaazi

Madehomes Developers is a real estate development company. It is committed to providing spectacular projects that deliver the best value for customer’s money. The developer aims to transform the property dreams of the customers into reality. It ensures that its projects emanate meticulous planning, quality material, and excellent workmanship. The company strives to be a front runner in the realm of real estate development by providing feature-rich projects that offer comfortable living.

FAQs

Frequently Asked Questions

What's the possession timeline at Madehomes Roys Heights?

Madehomes Roys Heights is still under construction, with possession expected around Jul, 2030.

Is Madehomes Roys Heights a RERA-registered project?

Yes. Madehomes Roys Heights is registered with the state RERA under number BRERAP192435031025040730E00, which you can verify on the official RERA portal.

Where is Madehomes Roys Heights and how well-connected is it?

Madehomes Roys Heights is located in Murarpur, Gaya.

How big is the Madehomes Roys Heights project?

Madehomes Roys Heights is spread across 0.1 acres, up to 4 floors and 13 homes.

What can residents enjoy at Madehomes Roys Heights?

Madehomes Roys Heights comes with 7 amenities, including Paved Compound, Earthquake Resistant, DG Availability, Waste Management, Garbage Disposal and Sewage Treatment Plant.

What's around Madehomes Roys Heights for daily needs?

Close to Madehomes Roys Heights you'll find hospitals such as Agrawal Surgical clinic and Hospital and Jai Prakash Narayan Hospital, schools like Manpur Mallah Toli and UES(closed).

Who is developing Madehomes Roys Heights?

Madehomes Roys Heights is being developed by Madehomes Developers.

What stamp duty and registration charges apply at Madehomes Roys Heights?

Beyond the home price, budget for stamp duty (from about 5.7%) plus registration charges when you buy at Madehomes Roys Heights.

Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.