Outdoors
Aerial View
Select a view or open the gallery
Madhuban Kadamb
Sarkhej, Ahmedabad
Construction Status
Under construction
Possession will start from Mar, 2028
₹44 L - 57 L
Price range· ₹3,806/sqft
2 BHK
Super Built-up Area
1156 sqft
₹44 L
3 BHK
Super Built-up Area
1500 sqft
₹57 L
Project Details
- Project area
- 1.07 acres
- Towers
- 2
- Total units
- 189
- Floors
- 14
- Open area
- 21%
- Unit sizes
- 1,156–1,500 sqft · Super Built-up Area
- Price per sqft
- ₹3,806
- Configurations
- 2, 3 BHK
- Property type
- Apartment
- Possession
- Completion in Mar, 2028
Specifications
Flooring - 600 mm X 600 mm vitrified Tiles in Living, Dinning and kitchen area. - 600 mm X 600 mm vitrified Tiles in all the three bedrooms. Kitchen - Granite platform with S.S. Sink base and vitrified tiles up to lintel level. Balcony - Balcony with Anti skid or Rustic tiles. Bathroom - 300 mm X 600 mm Glazed vitrified tiles till lintel level. - 600 mm X 600 mm Anti skid flooring tiles. - Sanitary fittings (jaguar or similar make) - Inlet and outlet pipes (Astral or similar make) - Waterproofing and damp systems in all bathroom and balcony areas. Doors - Main Flush door with Wooden frame and laminated on both side - All internal wooden flush door and granite frame Windows - Alluminium anodized sections with granite jambs. Electrification - 3 phased Concealed ISI cable copper wiring with modular switches. - Tv points to be placed in drawing room and bedrooms, telephone point in living room and Air conditioner points in all bedrooms and Living room. - Geyser points in all bathrooms. - All other necessary points will be provided. Services - Bore well and municipal water connection with sensory pumps attached to pressure pump. - Adani gas pipelines in all apartments with meters Amenities / Facilities - Borewell Water Supply - Municipal Water Supply - Piped Gas
As stated by the builder; shown as filed.
RERA Registration
Phase registrations, completion timelines and available documents from the state RERA record.
Phase 1
MAA14399/121124/310328
Gujarat RERA
- Registered on
- Not stated
- Completion by
- Not stated
Indicative project-name match
A similarly named project was found in GujRERA
This match used project name and state, not the registration number. Treat it as indicative and verify the number on the live portal.
- Snapshot checked
- 21 Jul 2026
- Check the official portal
- Open GujRERA portal ↗
- Registry ID
- PR/GJ/AHMEDABAD/DASKROI/AHMEDABADMUNICIPALCORPORATION/MAA14399/121124/310328
- Registry promoter
- R J PARIKH DEVELOPERS LLP
- Registry project status
- New
Registry documents
Mirrored from GujRERA
Requesting a download sends your enquiry to the seller. Once sent, other documents for this project stay unlocked for this browser session.
Registration certificate
Registration: PR/GJ/AHMEDABAD/DASKROI/AHMEDABADMUNICIPALCORPORATION/MAA14399/121124/310328143 KB
Files are shown as captured in our registry snapshot. Always confirm the latest record on the official state portal before you transact.
About Madhuban Kadamb
Check out Madhuban Kadamb in Sarkhej, one of the upcoming under-construction housing societies in Ahmedabad West. There are apartments for sale in Madhuban Kadamb Sarkhej, Sarkhej Okaf, Ahmedabad. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by R J Parikh Developers, Madhuban Kadamb is scheduled for possession in Mar, 2028. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The RERA registration number of this…More ↓Less ↑
Check out Madhuban Kadamb in Sarkhej, one of the upcoming under-construction housing societies in Ahmedabad West. There are apartments for sale in Madhuban Kadamb Sarkhej, Sarkhej Okaf, Ahmedabad. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by R J Parikh Developers, Madhuban Kadamb is scheduled for possession in Mar, 2028. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The RERA registration number of this project is MAA14399/121124/310328. Here’s everything you need to know about the must-know features of this housing society along with Madhuban Kadamb Photos, Floor Plans, Payment Plans, Brochure download procedure and other exciting facts about your future home:
Top Facilities
28 facilities recorded for this project
- Swimming Pool
- Gymnasium
- Jogging Track
- Badminton Court
- Yoga / Meditation Area
- Cricket Pitch
- Indoor Games
- Club House
- Children's Play Area
Location Advantages
Key destinations around Madhuban Kadamb
Sarvajanik High School
School · 2.1 Km
Satyam Hospital
Hospital · 2.4 Km
LJ University
University · 3.1 Km
Sarkhej Station
Railway Station · 2 Km
SVP Intl Airport
Airport · 22.9 Km
NH 147
Highway · 750 m
View Official Brochure
Official brochure
Madhuban Kadamb
29 pages · 13.1 MB · PDF
Published by the builder; shown as filed.
Reading here is free. Downloading sends your enquiry to the seller so they can follow up.
Price list
Published by the builder; shown as filed. Downloading sends the same enquiry.
Price Comparison
Current asking rates for this project, its locality and Ahmedabad.
Today’s asking rates
Project, locality and city benchmarks
Configuration rates in Sarkhej3 configurations
- 1 BHK
- ₹4,970/sqft · 5 samples
- 2 BHK
- ₹5,464/sqft · 15 samples
- 3 BHK
- ₹8,392/sqft · 7 samples
Stamp duty and registration · Gujarat
- Stamp duty — 5.9 % for Male
- 5.9% for Male
- Stamp duty — 4.9 % for Female
- 4.9% for Female
- Stamp duty — 5.9 % for Joint (Male and Female)
- 5.9% for Joint (Male and Female)
- Stamp duty — 4.9 % For Joint (Female and Female)
- 4.9% For Joint (Female and Female)
- Registration
- Male Ownership: 1%
- Registration
- Female Ownership: No registration charges
- Registration
- Joint (Male + Female) Ownership: 1%
Recorded state rates for reference. Confirm the applicable amount at registration.
Project and locality asking-rate medians come from the PropertyBaazi project records in the sample shown. Registered rates come from government transaction records. Neither is a valuation, index or forecast.
Market Snapshot for Sarkhej
Computed from 37 Sarkhej projects in our catalogue (22 with a per-sqft price).
37 projects here, by price band
Society Reviews
Reviews by residents
No written reviews yet
Be the first to share a first-hand experience.
Explore life around Madhuban Kadamb
Understand daily conveniences and connectivity around the project before planning a visit.
Based on 32 projects listed in Sarkhej on PropertyBaazi — our catalog, not a market index.
Distances as recorded by the builder — approximate; please confirm on the ground.
View on mapMetro & Rail 2
- Sarkhej Station2 Km
- APMC Metro Station7 Km
Schools 2
- Sarvajanik High School2.1 Km
- DAV International School3.7 Km
Colleges & Universities 1
- LJ University3.1 Km
Hospitals 1
- Satyam Hospital2.4 Km
Shopping & Malls 1
- Pushti Plaza700 m
Roads & Connectivity 4
- NH 147750 m
- Ujala Circle950 m
- SP Ring Road2.6 Km
- Vishala Circle5.9 Km
Airport 1
- SVP Intl Airport22.9 Km
Sports & Stadiums 1
- Sardar Patel Stadium14 Km
Others 2
- Ujala Chokdi Overbridge1 Km
- YMCA4.6 Km
Distances as recorded when the project was listed — approximate; please confirm on the ground.
Similar Projects
Comparable projects around Sarkhej
About R J PARIKH DEVELOPERS LLP

R J PARIKH DEVELOPERS LLP
1 projects on PropertyBaazi
R J Parikh Developers LLP, incorporated on December 14, 2023, is a Limited Liability Partnership registered with the Registrar of Companies in Ahmedabad. The firm's registered office is located at Floor No. 501, Survey No. 1247, Plot No. 1, R.J.P House, Mrugyanagar, Vejalpur, Ahmedabad, Gujarat, 380015.
Frequently Asked Questions
What's the possession timeline at Madhuban Kadamb?
Madhuban Kadamb is still under construction, with possession expected around Mar, 2028.
Does Madhuban Kadamb have RERA approval?
Yes. Madhuban Kadamb is registered with GujRERA under number MAA14399/121124/310328, which you can verify on the official RERA portal.
What does a home at Madhuban Kadamb cost?
Homes at Madhuban Kadamb are priced ₹44 L - 57 L (about ₹3,806/sq.ft) for 2, 3 BHK Apartment, sized 1,156–1,500 sq.ft super built-up area.
Whereabouts is Madhuban Kadamb, and what's the commute like?
Madhuban Kadamb is located in Sarkhej, Ahmedabad. The nearest metro (APMC) is close by.
What's the scale of Madhuban Kadamb?
Madhuban Kadamb is spread across 1.1 acres, 2 towers, up to 14 floors and 189 homes.
What amenities does Madhuban Kadamb offer?
Madhuban Kadamb comes with 28 amenities, including Swimming Pool, Gymnasium, Club House, Children's Play Area, Landscape Garden and Amphitheatre.
What conveniences are near Madhuban Kadamb?
Close to Madhuban Kadamb you'll find hospitals such as Mamta Hospital and SHREY HOSPITAL, schools like Anand Niketan School Sarkhej.
Which builder is behind Madhuban Kadamb?
Madhuban Kadamb is being developed by R J PARIKH DEVELOPERS LLP.
Quick Links
Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.





