Skip to main content

Outdoors

Elevation

01/06

Mahadev Omkar Heights

Outdoors · 1 of 6

Mahadev Omkar Heights — Elevation

Elevation

Mahadev Omkar Heights

Adajan, Surat

RERA RegisteredFloor Plans Available+12 Top Facilities

Construction Status

New launch

Possession will start from Mar, 2028

Price on request

Price on request

2 BHK

Carpet Area

688.57 sqft

Price on Request

3 BHK

Carpet Area

878.66 sqft

Price on Request

Project Details

Project area
1.554 acres
Towers
2
Total units
375
Unit sizes
688.57–878.66 sqft · Carpet Area
Configurations
2, 3 BHK
Property type
Apartment
Possession
Completion in Mar, 2028
Specifications
Construction
Enhanced structured safety against earthquake for relevant zone
Flooring
Living room and kitchen/dininng 32" x 32" & Bedroom 24" x 24" vitrified tiles flooring
Kitchen
Kitchen platform will be made of granite stone with SS sink Kitchen dedo fitted with designer kitchen tile cladding up to lintel level
Doors
Attractive main door with laminated sheet and wooden frame Internal door decorated with paint finish and granite frame Good quality hardware fixtures and fittings in all doors
Windows
All Windows of aluminium sections surrounded with marble or granite frame
Electrification
Concealed wiring of standard company with modular switched along with sufficient points Provision of AC point in 2 BHK (3 points) and in 3 BHK
Toilet
Decorative tiles dedo up to lintel level in all toilet block Sanitary ware and C.P. fitting of standard company
Plumbing
Concealed plumbing with standard sanitary ware & C.P. fitting

CPVC & UPVC

pipes for water supply, PVC pipes for drainage system
Colour
Building finished with standard quality paint, inside putty. out side acrylic texture paint finish.
Terrace
proper waterproofing chemical treatment
Lift
Premium quality lift Water
Supply
Underground & overhead water tank for SMC water of sufficient storage capacity with fully glazed titles dedo and auxiliary source of water from borewell
Generator
Generator backup for lift, water pump & common light connection Fire
Safety
Fire safety provision as per authority norms
Parking
Two basement,ground & first floor parking space Gas
Line
Gas points will be awarded to each flat. 1 point kitchen & 1 point geyser Railing :Small window grill.Living room balcony glass with decorative railing

As stated by the builder; shown as filed.

RERA Registration

Phase registrations, completion timelines and available documents from the state RERA record.

  • Phase 1

    PR/GJ/SURAT/SURATCITY/SuratUrbanDevelopmentAuthority/MN183AA10083/150922

    Gujarat RERA

    Registered on
    15/09/2022
    Completion by
    31/03/2028
    Registered
Registry referencePR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/150922

Registration-number match

Registration number found in GujRERA

The project registration number matched the registry snapshot. Confirm the current status and filings on the live portal before booking.

Snapshot checked
21 Jul 2026
Check the official portal
Open GujRERA portal ↗
Registry ID
PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/150922
Registry promoter
MAHADEV CORPORATION
Registry project status
New

Registry documents

Mirrored from GujRERA

18 documents

Requesting a download sends your enquiry to the seller. Once sent, other documents for this project stay unlocked for this browser session.

  • Registration certificate

    Registration: PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/150922129 KB

  • Title clearance certificate

    Registration: PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/15092217.3 MB

  • Title report

    Registration: PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/15092216.1 MB

  • Approved sanction plan

    Registration: PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/15092215.2 MB

  • Approved building plan

    Registration: PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/15092230.6 MB

  • Approved layout plan

    Registration: PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/15092230.3 MB

Plans & drawings1
  • Area development plan

    Registration: PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/150922494 KB

Land, title & agreements7
  • Encumbrance certificate

    Registration: PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/150922965 KB

  • Land & location document

    Registration: PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/15092227.0 MB

  • Declaration (Form B)

    Registration: PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/15092211.2 MB

  • Draft sale agreement

    Registration: PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/150922285 KB

  • Draft sale deed

    Registration: PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/150922203 KB

  • Draft allotment letter

    Registration: PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/150922969 KB

  • Property card (3)

    Registration: PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/15092222.3 MB

NOCs1
  • NOCs

    Registration: PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/15092213.0 MB

Other registry documents3
  • Brochure

    Registration: PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/15092288.6 MB

  • Drainage affidavit

    Registration: PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/1509229.2 MB

  • Project document

    Registration: PR/GJ/SURAT/SURATCITY/SURATURBANDEVELOPMENTAUTHORITY/MN183AA10083/1509221.4 MB

Files are shown as captured in our registry snapshot. Always confirm the latest record on the official state portal before you transact.

Floor Plans & Pricing

Available configurations, areas and recorded pricing.

2 BHK

1 layout

2 BHK Apartment

688.57 sq.ft.

Price on Request

3 BHK

1 layout

3 BHK Apartment

878.66 sq.ft.

Price on Request

Room dimensions

Room-by-room dimensions from each plan’s published schedule — shown exactly as filed, never estimated.

2 BHK Apartment · 688.57 sq.ft.8 rooms
RoomDimensions (as printed)Area
Living4.88 m × 3.19 m168 sqft
Kitchen And Dining4.26 m × 3.05 m140 sqft
Bedroom3.35 m × 3.05 m110 sqft
Bedroom3.66 m × 3.04 m120 sqft
Toilet2.28 m × 1.37 m34 sqft
Toilet1.29 m × 1.57 m22 sqft
WashService1.57 m × 1.57 m27 sqft
Store RoomService1.44 m × 1.30 m20 sqft

Itemized rooms add up to 641 sqft · super area 688.57 sqft (walls, circulation and balconies are not itemized)

3 BHK Apartment · 878.66 sq.ft.10 rooms
RoomDimensions (as printed)Area
Living3.34 m × 4.88 m175 sqft
Kitchen And Dining2.83 m × 4.43 m135 sqft
Bedroom3.04 m × 3.15 m103 sqft
Bedroom3.04 m × 3.35 m110 sqft
Bedroom2.88 m × 3.04 m94 sqft
Toilet1.20 m × 2.15 m28 sqft
Toilet1.20 m × 1.83 m24 sqft
Toilet1.20 m × 2.44 m32 sqft
Store RoomService1.52 m × 1.44 m24 sqft
WashService1.20 m × 2.10 m27 sqft

Itemized rooms add up to 752 sqft · super area 878.66 sqft (walls, circulation and balconies are not itemized)

About Mahadev Omkar Heights

For those looking to buy a residential property, here comes one of the choicest offerings in Surat, at Adajan. Brought to you by Mahadev Corporation, Mahadev Omkar Heights is among the newest addresses for homebuyers. This is an under-construction project right now, and is expected to be delivered by Mar, 2028. It has a variety of options to choose from that too in a varied budget range. Mahadev Omkar Heights Surat is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors.More ↓

For those looking to buy a residential property, here comes one of the choicest offerings in Surat, at Adajan. Brought to you by Mahadev Corporation, Mahadev Omkar Heights is among the newest addresses for homebuyers. This is an under-construction project right now, and is expected to be delivered by Mar, 2028. It has a variety of options to choose from that too in a varied budget range. Mahadev Omkar Heights Surat is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERA registration number of this project is PR/GJ/SURAT/SURATCITY/SuratUrbanDevelopmentAuthority/MN183AA10083/150922. Mahadev Corporation is one of the known real estate brands in Surat. There is 1 project of this builder, which is currently under-construction. Read on to know more about must-know features, Mahadev Omkar Heights, Photos, Floor Plans, Brochure download procedure and other exciting facts about the project.

Top Facilities

12 facilities recorded for this project

  • Swimming Pool
  • Indoor Games
  • Community Hall
  • Children's Play Area
  • 24/7 Water Supply
  • Lift(s)
  • Car Parking
  • 24/7 Security
  • Gated Community

Location Advantages

Key destinations around Mahadev Omkar Heights

The radiant international school

School · 1.8 km

Auro University

University · 8.9 km

Surat International Airport

Airport · 14.9 km

Surat Railway Station

Railway Station · 9.1 km

The Great Fun Amusement Park

Amusement Park · 1.5 km

Mirayah Multispeciality Hospital

Hospital · 2.1 km

Market Snapshot for Adajan

Computed from 72 Adajan projects in our catalogue (17 with a per-sqft price).

72 projects here, by price band

Budget
10
Affordable
8
Premium
8
Luxury
1

Society Reviews

Reviews by residents

No written reviews yet

Be the first to share a first-hand experience.

Locality overview

Explore life around Mahadev Omkar Heights

Understand daily conveniences and connectivity around the project before planning a visit.

View full locality insights
42
Projects listed
2, 3 BHK
Popular configurations
Ready to move
Most common status

Based on 42 projects listed in Adajan on PropertyBaazi — our catalog, not a market index.

Distances and travel times are approximate. Confirm routes and access conditions before making a purchase decision.
Builder

About Mahadev Corporation

View builder profile
Mahadev Corporation logo

Mahadev Corporation

2 projects on PropertyBaazi

Projects by Mahadev Corporation

FAQs

Frequently Asked Questions

When can I move into Mahadev Omkar Heights?

Mahadev Omkar Heights is still under construction, with possession expected around Mar, 2028.

Does Mahadev Omkar Heights have RERA approval?

Yes. Mahadev Omkar Heights is registered with GujRERA under number PR/GJ/SURAT/SURATCITY/SuratUrbanDevelopmentAuthority/MN183AA10083/150922, which you can verify on the official RERA portal.

What are prices and sizes like at Mahadev Omkar Heights?

Mahadev Omkar Heights offers 2, 3 BHK Apartment, sized 688.57–878.66 sq.ft carpet area. Current pricing is shared on request — download the brochure from the project page for the latest price list.

Whereabouts is Mahadev Omkar Heights, and what's the commute like?

Mahadev Omkar Heights is located in Adajan, Surat.

What's the scale of Mahadev Omkar Heights?

Mahadev Omkar Heights is spread across 1.6 acres, 2 towers and 375 homes.

What amenities does Mahadev Omkar Heights offer?

Mahadev Omkar Heights comes with 12 amenities, including Swimming Pool, Flower Garden, Community Hall, Indoor Games, Sewage Treatment Plant and 24/7 Security.

What conveniences are near Mahadev Omkar Heights?

Close to Mahadev Omkar Heights you'll find hospitals such as Maa `N` Baby Hospital and Anmol Eye Hospital, schools like L P Savani School.

Which builder is behind Mahadev Omkar Heights?

Mahadev Omkar Heights is being developed by Mahadev Corporation.

Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.