Skip to main content

Mirgo Enclave

Bardez, North Goa

RERA Registered+14 Top Facilities

Construction Status

Under construction

Price on request

Price on request

Download Brochure

2 BHK

Super Built-up Area

1201.25 sqft

Price on Request

3 BHK

Super Built-up Area

1460.45 sqft

Price on Request

Project Details

Project area
0.67 acres
Towers
1
Total units
27
Floors
4
Unit sizes
1,201.25–1,460.45 sqft · Super Built-up Area
Configurations
2, 3 BHK
Property type
Apartment
Possession
Completion in May, 2022
Specifications

STRUCTURE:

The skeleton of beams, columns & slabs shall be Reinforced Cement Concrete, which consists of high-quality steel rods, cast along with M20 grade concrete.

WALLS:

The external walls are made up of Laterite stone block / concrete blocks/clay/brick blocks coated with a double layer of sand-faced cement plaster & rainproof paint. The internal walls are also made up of fly ash bricks or Mud Bricks, coated with a single layer of sand-faced plaster & rendered with waterproof putty, primer & paint.

ROOF SLAB:

The roof slab shall be waterproofed by waterproofing compounds & then covered with Mangalore tiles or Sheets.

FLOORING:

Vitrified Tiles / VC Series shall be used for flooring.

WASHROOMS:

Tiles for walls and flooring. Flooring shall be on non-skid ceramic tiles & Walls will have Glazed tiles up to ceiling height.

DOORS

The Main Door shall be of Teak Wood & Waterproof Doors for Washrooms fitted with Brass Hinges.

WINDOWS:

All Windows shall be made of Powder Coated Aluminum.

UPVC

doors for Balcony.

ELECTRICAL FITTINGS:

All wiring will be multi-strand, fire-resistant, double insulated & concealed. 3-phase power will be provided along with an adequate number of light points, fan points, power points with provision for Inverter. Switches & Sockets of Anchor Brand in each room.

SANITARY FITTINGS:

The entire plumbing system will be completely concealed. All sanitary fittings such as cisterns, faucets, and washbasins will be of ceramic with white as the base color. Washroom Showers will be provided with hot & cold mixer taps.

PAINT:

Exterior surfaces shall be painted with weatherproof paint & the interior surfaces with acrylic emulsion.

WATER SUPPLY:

Water supply through G.I. pipes down taken from an overhead storage tank & ground level suction tank of adequate capacity fed by Government water department. Well water back-up.

SWIMMING POOL:

It shall be of Reinforced cement concrete & having high rate filter systems.

GARDENS:

Gardens will be landscaped & tended.

As stated by the builder; shown as filed.

RERA Registration

Phase registrations, completion timelines and available documents from the state RERA record.

  • Phase 1

    PRGO12191027

    Goa RERA

    Registered on
    Not stated
    Completion by
    Not stated
    Registered

Snapshot coverage unavailable

Goa is not covered by this registry snapshot

No registration conclusion can be drawn from this snapshot. Check the live state portal before you transact.

Snapshot checked
21 Jul 2026
Check the official portal
Open Goa RERA portal ↗

Registry documents

Mirrored from the state RERA registry

0 documents

No mirrored registry documents available

Document availability varies by state portal. Use the official RERA portal below for the latest filed records.

About Mirgo Enclave

Check out Mirgo Enclave in Bardez, one of the upcoming under-construction housing societies in North Goa. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Mirgo Enclave is scheduled for possession in May, 2022. This housing society has multiple property options to offer, in varied price range, making it one of the most suitable address to own, that too in your budget. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The RERAMore ↓

Check out Mirgo Enclave in Bardez, one of the upcoming under-construction housing societies in North Goa. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Mirgo Enclave is scheduled for possession in May, 2022. This housing society has multiple property options to offer, in varied price range, making it one of the most suitable address to own, that too in your budget. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The RERA registration number of this project is PRGO12191027. Here’s everything you need to know about the must-know features of this housing society along with Mirgo Enclave, Photos, Floor Plans, Payment Plans, Brochure download procedure and other exciting facts about your future home:

Top Facilities

14 facilities recorded for this project

  • Swimming Pool
  • Club House
  • Children's Play Area
  • 24/7 Power Backup
  • 24/7 Water Supply
  • Lift(s)
  • Car Parking
  • CCTV Camera Security
  • 24/7 Security

Location Advantages

Key destinations around Mirgo Enclave

Our Lady of Lourdes Chapel

Religious Place · 350m away

Mapusa - Bicholim Road

Connectivity · 550m away

State Bank Of India

Bank · 850m away

Petrol pump

Petrol Pump · 900m away

Dhumaskar Hospital

Hospital · 1.6km away

Thivim Railway station

Railway Station · 1.7km away

View Official Brochure

Official brochure

Mirgo Enclave

6 pages · 7.9 MB · PDF

Published by the builder; shown as filed.

Reading here is free. Downloading sends your enquiry to the seller so they can follow up.

Price list

Published by the builder; shown as filed. Downloading sends the same enquiry.

Market Snapshot for Bardez

Computed from 8 Bardez projects in our catalogue (1 with a per-sqft price).

8 projects here, by price band

Premium
1

Society Reviews

Reviews by residents

No written reviews yet

Be the first to share a first-hand experience.

Locality overview

Explore life around Mirgo Enclave

Understand daily conveniences and connectivity around the project before planning a visit.

View full locality insights
8
Projects listed
1, 2 BHK
Popular configurations
New launch
Most common status

Based on 8 projects listed in Bardez on PropertyBaazi — our catalog, not a market index.

Distances and travel times are approximate. Confirm routes and access conditions before making a purchase decision.
FAQs

Frequently Asked Questions

When can I move into Mirgo Enclave?

Mirgo Enclave has only recently launched, so possession is still some way off.

Is Mirgo Enclave a RERA-registered project?

Yes. Mirgo Enclave is registered with the state RERA under number PRGO12191027, which you can verify on the official RERA portal.

How much should I budget for Mirgo Enclave?

Mirgo Enclave offers 2, 3 BHK Apartment, sized 1,201.25–1,460.45 sq.ft super built-up area. Current pricing is shared on request — download the brochure from the project page for the latest price list.

Where is Mirgo Enclave and how well-connected is it?

Mirgo Enclave is located in Bardez, North Goa. The railway station is around 4.30 km away.

How big is the Mirgo Enclave project?

Mirgo Enclave is spread across 0.7 acres, 1 tower, up to 4 floors and 27 homes.

What can residents enjoy at Mirgo Enclave?

Mirgo Enclave comes with 14 amenities, including Swimming Pool, CCTV Camera Security, 24/7 Security, Club House, 24/7 Power Backup and Gated Community.

What's around Mirgo Enclave for daily needs?

Close to Mirgo Enclave you'll find hospitals such as Elshaddai House and Chaitanya Mental Health Care Centre, schools like Tarwada and banks.

What stamp duty and registration charges apply at Mirgo Enclave?

Beyond the home price, budget for stamp duty (from about 3%) plus registration charges when you buy at Mirgo Enclave.

Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.