Construction
Status as on : 11 Dec 2025
Select a view or open the gallery
Neelkanth Akshar Villa
Daskroi, Ahmedabad
Construction Status
New launch
Possession will start from Dec, 2028
Price on request
Price on request
Project Details
- Project area
- 1.43 acres
- Total units
- 55
- Open area
- 50%
- Property type
- Villa
- Possession
- Completion in Dec, 2028
Specifications
- Flooring Good quality vitrified tiles flooring and granite on stairs. Bathrooms Glazed tiles up to lintel level, good brand sanitary fittings, English W.C. with flush valve, and high-quality C.P. fittings. Kitchen Sandwich granite platform, sink, and good quality glazed tiles up to lintel level. Doors and Windows Designed main doors and interior colored doors. Finishes Single coat mala plaster inside, double coat mala plaster outside, double coat putty on interior walls and ceiling, and high-quality acrylic color on exterior walls. Electrical Concealed I.S.I. copper wiring and necessary electric points as per architect's design. Plumbing Good brand
CPVC
- and
UPVC
- pipes. Structure Earthquake resistant R.C.C. frame structure and masonry work with blocks. Balconies/Terraces Glazed tiles or china mosaic on the terrace slab. Facilities Borewell and overhead water tank.
As stated by the builder; shown as filed.
RERA Registration
Phase registrations, completion timelines and available documents from the state RERA record.
Phase 1
RAA16196/091225/311228
Gujarat RERA
- Registered on
- Not stated
- Completion by
- Not stated
Not found in this snapshot
No matching registry entry was found
The registration was not found in our Maharashtra, Tamil Nadu, Karnataka, Haryana, Uttar Pradesh and Gujarat snapshot. This does not mean the project is unregistered; check the live state portal before you transact.
- Snapshot checked
- 21 Jul 2026
- Check the official portal
- Open GujRERA portal ↗
Registry documents
Mirrored from the state RERA registry
No mirrored registry documents available
Document availability varies by state portal. Use the official RERA portal below for the latest filed records.
About Neelkanth Akshar Villa
For those looking to buy a residential property, here comes one of the choicest offerings in Ahmedabad East, at Daskroi. Brought to you by Neelkanth Group Ahmedabad, Neelkanth Akshar Villa is among the newest addresses for homebuyers. This is a new launch project right now, and is expected to be delivered by Dec, 2028. It has a variety of options to choose from that too in a varied budget range. Neelkanth Akshar Villa Ahmedabad East is a RERA-registered housing society, which means all projects details are also available on state RERA website for…More ↓Less ↑
For those looking to buy a residential property, here comes one of the choicest offerings in Ahmedabad East, at Daskroi. Brought to you by Neelkanth Group Ahmedabad, Neelkanth Akshar Villa is among the newest addresses for homebuyers. This is a new launch project right now, and is expected to be delivered by Dec, 2028. It has a variety of options to choose from that too in a varied budget range. Neelkanth Akshar Villa Ahmedabad East is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERA registration number of this project is RAA16196/091225/311228. Read on to know more about must-know features, Neelkanth Akshar Villa, Photos, Brochure download procedure and other exciting facts about the project.
Top Facilities
4 facilities recorded for this project
- Earthquake Resistant
- Landscape Garden
- Open Space
- Solar Water Heating
Location Advantages
Key destinations around Neelkanth Akshar Villa
Ratanpura garden
Park · 1.2 km
Shukan Maternity Home
Hospital · 1.4 km
krupa
Park · 1.5 km
Rajni Women's Hospital and Research Centre
Hospital · 1.7 km
Hariom Multispeciality Hospital
Hospital · 1.8 km
Nirant Cross Roads
Metro / Rail · 1.9 km
View Official Brochure
Official brochure
Neelkanth Akshar Villa
11 pages · 23.6 MB · PDF
Published by the builder; shown as filed.
Reading here is free. Downloading sends your enquiry to the seller so they can follow up.
Price Comparison
Current asking rates for this project, its locality and Ahmedabad.
Today’s asking rates
Project, locality and city benchmarks
Stamp duty and registration · Gujarat
- Stamp duty — 5.9 % for Male
- 5.9% for Male
- Stamp duty — 4.9 % for Female
- 4.9% for Female
- Stamp duty — 5.9 % for Joint (Male and Female)
- 5.9% for Joint (Male and Female)
- Stamp duty — 4.9 % For Joint (Female and Female)
- 4.9% For Joint (Female and Female)
- Registration
- Male Ownership: 1%
- Registration
- Female Ownership: No registration charges
- Registration
- Joint (Male + Female) Ownership: 1%
Recorded state rates for reference. Confirm the applicable amount at registration.
Project and locality asking-rate medians come from the PropertyBaazi project records in the sample shown. Registered rates come from government transaction records. Neither is a valuation, index or forecast.
Market Snapshot for Daskroi
Computed from 26 Daskroi projects in our catalogue (4 with a per-sqft price).
26 projects here, by price band
Society Reviews
Reviews by residents
No written reviews yet
Be the first to share a first-hand experience.
Explore life around Neelkanth Akshar Villa
Understand daily conveniences and connectivity around the project before planning a visit.
Based on 18 projects listed in Daskroi on PropertyBaazi — our catalog, not a market index.
Aerial distances measured on the map from the project’s recorded location — straight lines, not routes. Map data © OpenStreetMap contributors.
View on mapMetro & Rail 3
- Nirant Cross Roads1.9 km
- Vastral2 km
- Vastral Gam2.3 km
Schools 1
- VIVEKANAND VIDYALAYA3 km
Hospitals 3
- Shukan Maternity Home1.5 km
- Rajni Women's Hospital and Research Centre1.7 km
- Hariom Multispeciality Hospital1.8 km
Parks 3
- Ratanpura garden1.2 km
- krupa1.5 km
- Oxygen Park2 km
Banks 1
- Dena Bank2.7 km
Clinic 1
- Dhruv Health Care1.9 km
Railway 2
- Vatva3.6 km
- Maninagar4.1 km
Straight-line distances, approximate, measured from the project’s recorded location. Data © OpenStreetMap contributors.
Similar Projects
Comparable projects around Daskroi
About Neelkanth Group Ahmedabad

Neelkanth Group Ahmedabad
1 projects on PropertyBaazi
Frequently Asked Questions
What's the possession timeline at Neelkanth Akshar Villa?
Neelkanth Akshar Villa is still under construction, with possession expected around Dec, 2028.
Does Neelkanth Akshar Villa have RERA approval?
Yes. Neelkanth Akshar Villa is registered with the state RERA under number RAA16196/091225/311228, which you can verify on the official RERA portal.
Whereabouts is Neelkanth Akshar Villa, and what's the commute like?
Neelkanth Akshar Villa is located in Daskroi, Ahmedabad.
What's the scale of Neelkanth Akshar Villa?
Neelkanth Akshar Villa is spread across 1.4 acres and 55 homes.
What amenities does Neelkanth Akshar Villa offer?
Neelkanth Akshar Villa comes with 4 amenities, including Landscape Garden, Open Space, Earthquake Resistant and Solar Water Heating.
What conveniences are near Neelkanth Akshar Villa?
Close to Neelkanth Akshar Villa you'll find hospitals such as Shukan Maternity Home and Rajni Women's Hospital and Research Centre.
Which builder is behind Neelkanth Akshar Villa?
Neelkanth Akshar Villa is being developed by Neelkanth Group Ahmedabad.
What costs should I plan beyond the price of Neelkanth Akshar Villa?
Beyond the home price, budget for stamp duty (from about 4.9%) plus registration charges when you buy at Neelkanth Akshar Villa.
Quick Links
Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.





