Skip to main content

Radheya Nalini Bhuvan Chs

Eksar, Mumbai

RERA RegisteredFloor Plans Available+10 Top Facilities

Construction Status

Ready to move

Completed in Dec, 2023

Price on request

Price on request

2 BHK

Carpet Area

615.74 sqft

Price on Request

3 BHK

Carpet Area

774.64 sqft

Price on Request

Project Details

Project area
0.13 acres
Towers
1
Total units
27
Floors
14
Unit sizes
615.74–774.64 sqft · Carpet Area
Configurations
2, 3 BHK
Property type
Apartment
Possession
Since Dec, 2023

RERA Registration

Phase registrations, completion timelines and available documents from the state RERA record.

  • Phase 1

    P51800023013

    Maharashtra RERA

    Registered on
    Not stated
    Completion by
    Not stated
    Registered
Registry referenceP51800023013

Registration-number match

Registration number found in MahaRERA

The project registration number matched the registry snapshot. Confirm the current status and filings on the live portal before booking.

Snapshot checked
21 Jul 2026
Check the official portal
Open MahaRERA portal ↗
Registry ID
P51800023013
Registry promoter
RADHEYA CONSTRUCTION COMPANY

Registry documents

Mirrored from MahaRERA

0 documents

No mirrored registry documents available

Document availability varies by state portal. Use the official RERA portal below for the latest filed records.

Floor Plans & Pricing

Available configurations, areas and recorded pricing.

2 BHK

1 layout

2 BHK Apartment

615.74 sq.ft.

Price on Request

3 BHK

1 layout

3 BHK Apartment

774.64 sq.ft.

Price on Request

Room dimensions

Room-by-room dimensions from each plan’s published schedule — shown exactly as filed, never estimated.

2 BHK Apartment · 615.74 sq.ft.8 rooms
RoomDimensions (as printed)Area
Living3.00 m × 4.65 m150 sqft
Kitchen2.70 m × 2.25 m65 sqft
Bedroom3.40 m × 3.25 m119 sqft
Bedroom3.00 m × 3.70 m119 sqft
Toilet1.95 m × 1.20 m25 sqft
Toilet1.20 m × 2.25 m29 sqft
Dining2.40 m × 2.25 m58 sqft
Passage0.90 m × 1.30 m13 sqft

Itemized rooms add up to 578 sqft · super area 615.74 sqft (walls, circulation and balconies are not itemized)

3 BHK Apartment · 774.64 sq.ft.11 rooms
RoomDimensions (as printed)Area
Living3.00 m × 4.65 m150 sqft
Kitchen2.70 m × 2.25 m65 sqft
Bedroom3.40 m × 3.25 m119 sqft
Bedroom2.75 m × 3.65 m108 sqft
Bedroom3.00 m × 3.70 m119 sqft
Toilet1.20 m × 2.10 m27 sqft
Toilet1.95 m × 1.20 m25 sqft
Toilet1.20 m × 2.25 m29 sqft
Passage0.90 m × 1.35 m13 sqft
Passage1.20 m × 0.90 m12 sqft
Dining2.40 m × 2.20 m57 sqft

Itemized rooms add up to 724 sqft · super area 774.64 sqft (walls, circulation and balconies are not itemized)

About Radheya Nalini Bhuvan Chs

Check out Radheya Nalini Bhuvan Chs in Eksar, one of the upcoming under-construction housing societies in Western Mumbai. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Radheya Construction, Radheya Nalini Bhuvan Chs is scheduled for possession in Dec, 2023. This housing society has multiple property options to offer, in varied price range, making it one of the most suitable address to own, that too in your budget. Being a RERA-registered society, the project details and otherMore ↓

Check out Radheya Nalini Bhuvan Chs in Eksar, one of the upcoming under-construction housing societies in Western Mumbai. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Radheya Construction, Radheya Nalini Bhuvan Chs is scheduled for possession in Dec, 2023. This housing society has multiple property options to offer, in varied price range, making it one of the most suitable address to own, that too in your budget. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The RERA registration number of this project is P51800023013. Radheya Construction is one of the known real estate brands in Western Mumbai.The builder has delivered 1 project so far. Around 1 project is upcoming. Here’s everything you need to know about the must-know features of this housing society along with Radheya Nalini Bhuvan Chs, Floor Plans, Brochure download procedure and other exciting facts about your future home:

Top Facilities

10 facilities recorded for this project

  • Gymnasium
  • Entrance Lobby
  • 24/7 Power Backup
  • 24/7 Water Supply
  • Lift(s)
  • Car Parking
  • Fire Fighting Systems
  • Sewage Treatment Plant
  • Rain Water Harvesting

Location Advantages

Key destinations around Radheya Nalini Bhuvan Chs

ST Lawrence High School

School · 0.2 km

Sushrut Hospital

Hospital · 0.3 km

Eksar

Metro / Rail · 0.4 km

Palkar Hospital

Hospital · 0.4 km

Jivanand Clinic

Hospital · 0.4 km

yogi garden

Park · 0.5 km

Market Snapshot for Eksar

Computed from 18 Eksar projects in our catalogue (7 with a per-sqft price).

18 projects here, by price band

Premium
6
Luxury
1

Society Reviews

Reviews by residents

No written reviews yet

Be the first to share a first-hand experience.

Locality overview

Explore life around Radheya Nalini Bhuvan Chs

Understand daily conveniences and connectivity around the project before planning a visit.

View full locality insights
16
Projects listed
2, 3 BHK
Popular configurations
Ready to move
Most common status

Based on 16 projects listed in Eksar on PropertyBaazi — our catalog, not a market index.

Distances and travel times are approximate. Confirm routes and access conditions before making a purchase decision.
Builder

About Radheya Construction

View builder profile
Radheya Construction logo

Radheya Construction

1 projects on PropertyBaazi

Radheya Construction is a property development company committed to developing projects that are an excellent investment for the present that is bound to bear fruits in the future. It believes in maintaining business ethics and transparency in all the dealings to create an enduring customer base. The Mumbai-based firm believes in delivering high-quality construction to the customers to help them realize their dream of owning a home. It ensures that there is no compromise on the quality of its projects.

FAQs

Frequently Asked Questions

Is Radheya Nalini Bhuvan Chs ready to move in?

Radheya Nalini Bhuvan Chs was completed in Dec, 2023 (per our records).

Does Radheya Nalini Bhuvan Chs have RERA approval?

Yes. Radheya Nalini Bhuvan Chs is registered with MahaRERA under number P51800023013, which you can verify on the official RERA portal.

What are prices and sizes like at Radheya Nalini Bhuvan Chs?

Radheya Nalini Bhuvan Chs offers 2, 3 BHK Apartment, sized 615.74–774.64 sq.ft carpet area. Current pricing is shared on request — download the brochure from the project page for the latest price list.

Whereabouts is Radheya Nalini Bhuvan Chs, and what's the commute like?

Radheya Nalini Bhuvan Chs is located in Eksar, Mumbai. The railway station is around 1.53 km away.

What's the scale of Radheya Nalini Bhuvan Chs?

Radheya Nalini Bhuvan Chs is spread across 0.1 acres, 1 tower, up to 14 floors and 27 homes.

What amenities does Radheya Nalini Bhuvan Chs offer?

Radheya Nalini Bhuvan Chs comes with 10 amenities, including Entrance Lobby, Sewage Treatment Plant, Rain Water Harvesting, 24/7 Power Backup, Gymnasium and 24/7 Water Supply.

What conveniences are near Radheya Nalini Bhuvan Chs?

Close to Radheya Nalini Bhuvan Chs you'll find hospitals such as Sushrut Hospital and Rajendra Maternity and Surgical Nursing Home, schools like Ajmera Global School and suvidyalay.

Which builder is behind Radheya Nalini Bhuvan Chs?

Radheya Nalini Bhuvan Chs is being developed by Radheya Construction.

Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.