Loading project details…
Loading project details…
Alair, Yadadri Bhuvanagiri
Construction Status
Under construction
Price on request
Price on request
Designed with a blend of functionality and style, the interiors feature premium fittings, elegant finishes, and optimized layouts.
As stated by the builder; shown as filed.
Phase registrations, completion timelines and available documents from the state RERA record.
Phase 1
P02000009969
Telangana RERA
Snapshot coverage unavailable
Telangana is not covered by this registry snapshot
No registration conclusion can be drawn from this snapshot. Check the live state portal before you transact.
Registry documents
Mirrored from the state RERA registry
No mirrored registry documents available
Document availability varies by state portal. Use the official RERA portal below for the latest filed records.
Check out Sampangi The Green Ridge Project in Alair, Yadadri Bhuvanagiri, one of the upcoming under-construction housing societies in Yadadri Bhuvanagiri. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Sampangi Reality And Infrastructure, Sampangi The Green Ridge Project is scheduled for possession in May, 2026. This housing society has multiple property options to offer, in varied price range, making it one of the most suitable address to own, that too in your budget. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The RERA registration number of this project is P02000009969.
5 facilities recorded for this project
Key destinations around Sampangi The Green Ridge Project
Mamatha Nursing Home
Hospital · 0.3 km
Bhavani clinic
Clinic · 0.6 km
PACS Aler
Bank · 0.7 km
Vr College
College · 0.7 km
Balan Hospital
Hospital · 0.7 km
Aler
Metro / Rail · 0.7 km
Computed from 4 Alair projects in our catalogue.
Government charges
Stamp duty5 % of the value, applicable to both Male and Female.
Registration2 % of Value
As recorded for this state — confirm current rates at registration.
Reviews by residents
No written reviews yet
Be the first to share a first-hand experience.
Understand prices, daily conveniences and connectivity around the project before planning a visit.
Based on 4 projects listed in Alair on PropertyBaazi — our catalog, not a market index.
Aerial distances measured on the map from the project’s recorded location — straight lines, not routes. Map data © OpenStreetMap contributors.
View on mapMetro & Rail 1
Colleges 1
Hospitals 3
Banks 4
Clinic 1
Straight-line distances, approximate, measured from the project’s recorded location. Data © OpenStreetMap contributors.
Comparable projects around Alair

Sampangi Reality And Infrastructure
1 projects on PropertyBaazi
Sampangi The Green Ridge Project has only recently launched, so possession is still some way off.
Yes. Sampangi The Green Ridge Project is registered with the state RERA under number P02000009969, which you can verify on the official RERA portal.
Sampangi The Green Ridge Project is located in Alair, Yadadri Bhuvanagiri.
Sampangi The Green Ridge Project comes with 5 amenities, including Landscape Garden, Internal Street Lights, Sewage Treatment Plant, 24/7 Water Supply and Rain Water Harvesting.
Close to Sampangi The Green Ridge Project you'll find hospitals such as Mamatha Nursing Home and Balan Hospital and banks.
Sampangi The Green Ridge Project is being developed by Sampangi Reality And Infrastructure.
Beyond the home price, budget for stamp duty (from about 5%) plus registration charges when you buy at Sampangi The Green Ridge Project.
Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.