Outdoors
Elevation
Select a view or open the gallery
Saraswati Rose Avenue Building A1
Pundag, Ranchi
Construction Status
Under construction
Possession will start from Oct, 2028
Price on request
Price on request
Project Details
- Towers
- 1
- Total units
- 91
- Floors
- 14
- Property type
- Apartment
- Possession
- Completion in Oct, 2028
Specifications
STRUCTURE RCC
- framed structure designed with earthquake resistance and RCC columns.
WALLS
- 9" thick external brick walls and 4" thick internal brick walls. All internal and ceiling will have plaster and plaster of pairs finish
DOORS
- Wooden flush door with modern heavy duty locking for main door and cylindrical locks in all bedroom doors and toilet
WINDOWS
- Three track sliding aluminium windows with two glazed and one track mosquito net provision.
KITCHEN
- Granite top in kitchen platform. ISI marked stainless steel sink.Pipeline for hot and cold water provision
FLOORS
- Vitrified Ceramic floor tiles in entire flat. (Make size and quality as per discretion of the builder)
TOILETS
- Flooring in ceramic tiles and dado in theme based ceramic tiles upto 7'0" height. Corner / Full basin will be provided in all toilets. Pipes for hot and cold water provided in all toilets. (Geysers not provided)
ELECTRIFICATION
- Concealed wiring with standard makes modular fitting and fixtures. Fan regulators, provision for AC points in all bedrooms, living and dining room and (Television) point in drawing room and Master bedroom shall be provided.
SANITARY FITTINGS
- All C.P. or brass fitting of standard ISI mark. White glazed vitreous sanitary ware.
As stated by the builder; shown as filed.
RERA Registration
Phase registrations, completion timelines and available documents from the state RERA record.
Phase 1
JHARERA/PROJECT/49/2024
Jharkhand RERA
- Registered on
- Not stated
- Completion by
- Not stated
Snapshot coverage unavailable
Jharkhand is not covered by this registry snapshot
No registration conclusion can be drawn from this snapshot. Check the live state portal before you transact.
- Snapshot checked
- 21 Jul 2026
- Check the official portal
- Open Jharkhand RERA portal ↗
Registry documents
Mirrored from the state RERA registry
No mirrored registry documents available
Document availability varies by state portal. Use the official RERA portal below for the latest filed records.
About Saraswati Rose Avenue Building A1
Check out Saraswati Rose Avenue Building A1 in Pundag, Ranchi, one of the upcoming under-construction housing societies in Ranchi. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Sarswati Consultancy And Construction, Saraswati Rose Avenue Building A1 is scheduled for possession in Oct, 2028. This housing society has multiple property options to offer, in varied price range, making it one of the most suitable address to own, that too in your budget. Being a RERA-registered society,…More ↓Less ↑
Check out Saraswati Rose Avenue Building A1 in Pundag, Ranchi, one of the upcoming under-construction housing societies in Ranchi. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Sarswati Consultancy And Construction, Saraswati Rose Avenue Building A1 is scheduled for possession in Oct, 2028. This housing society has multiple property options to offer, in varied price range, making it one of the most suitable address to own, that too in your budget. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The RERA registration number of this project is JHARERA/PROJECT/49/2024. Here’s everything you need to know about the must-know features of this housing society along with Saraswati Rose Avenue Building A1, Photos, Brochure download procedure and other exciting facts about your future home:
Top Facilities
8 facilities recorded for this project
- Gymnasium
- Yoga / Meditation Area
- Club House
- Children's Play Area
- Car Parking
- Power Back up Lift
- 24/7 Security
- Rain Water Harvesting
Location Advantages
Key destinations around Saraswati Rose Avenue Building A1
Agra Chowk
Connectivity · 3.3 km
Hatia Station
Railway Station · 8.5 km
Birsa Munda Airport
Airport · 10 km
Ranchi Railway Station
Railway Station · 7.6 km
Ring Road
Connectivity · 3.7 km
View Official Brochure
Official brochure
Saraswati Rose Avenue Building A1
14 pages · 8.9 MB · PDF
Published by the builder; shown as filed.
Reading here is free. Downloading sends your enquiry to the seller so they can follow up.
Price Comparison
Current asking rates for this project, its locality and Ranchi.
Today’s asking rates
Project, locality and city benchmarks
Stamp duty and registration · Jharkhand
- Stamp duty — Urban Areas - 4 % of Value
- Urban Areas - 4% of Value
- Stamp duty — Rural Areas - 3 % of Value(Rates applicable to both Male and Female).
- Rural Areas - 3% of Value(Rates applicable to both Male and Female).
- Registration
- 3% of Value
Recorded state rates for reference. Confirm the applicable amount at registration.
Project and locality asking-rate medians come from the PropertyBaazi project records in the sample shown. Registered rates come from government transaction records. Neither is a valuation, index or forecast.
Market Snapshot for Pundag
Computed from 17 Pundag projects in our catalogue (4 with a per-sqft price).
17 projects here, by price band
Society Reviews
Reviews by residents
No written reviews yet
Be the first to share a first-hand experience.
Explore life around Saraswati Rose Avenue Building A1
Understand daily conveniences and connectivity around the project before planning a visit.
Based on 16 projects listed in Pundag on PropertyBaazi — our catalog, not a market index.
Distances as recorded by the builder; others measured aerially on the map — straight lines, not routes. Map data © OpenStreetMap contributors.
View on mapMetro & Rail 2
- Hatia Station8.5 km
- Ranchi Railway Station7.6 km
Roads & Connectivity 2
- Agra Chowk3.3 km
- Ring Road3.7 km
Airport 1
- Birsa Munda Airport10 km
Distances as recorded when the project was listed — approximate; please confirm on the ground.
Similar Projects
Comparable projects around Pundag
About Sarswati Consultancy And Construction

Sarswati Consultancy And Construction
1 projects on PropertyBaazi
Frequently Asked Questions
Is Saraswati Rose Avenue Building A1 ready to move in?
Saraswati Rose Avenue Building A1 is still under construction, with possession expected around Oct, 2028.
Does Saraswati Rose Avenue Building A1 have RERA approval?
Yes. Saraswati Rose Avenue Building A1 is registered with the state RERA under number JHARERA/PROJECT/49/2024, which you can verify on the official RERA portal.
Whereabouts is Saraswati Rose Avenue Building A1, and what's the commute like?
Saraswati Rose Avenue Building A1 is located in Pundag, Ranchi.
What's the scale of Saraswati Rose Avenue Building A1?
Saraswati Rose Avenue Building A1 is 1 tower, up to 14 floors and 91 homes.
What amenities does Saraswati Rose Avenue Building A1 offer?
Saraswati Rose Avenue Building A1 comes with 8 amenities, including Gymnasium, Club House, Children's Play Area, Yoga / Meditation Area, Car Parking and 24/7 Security.
What conveniences are near Saraswati Rose Avenue Building A1?
Close to Saraswati Rose Avenue Building A1 you'll find hospitals such as Mannat Hospital and RJS Pandey Cancer Hospital & Research.
Which builder is behind Saraswati Rose Avenue Building A1?
Saraswati Rose Avenue Building A1 is being developed by Sarswati Consultancy And Construction.
What costs should I plan beyond the price of Saraswati Rose Avenue Building A1?
Beyond the home price, budget for stamp duty (from about 3%) plus registration charges when you buy at Saraswati Rose Avenue Building A1.
Quick Links
Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.




