SKD Surya Nivaas
Ghatlodia, Ahmedabad
Construction Status
New launch
Possession will start from Aug, 2029
Price on request
Price on request
Project Details
- Project area
- 0.94 acres
- Towers
- 1
- Total units
- 48
- Property type
- Apartment
- Possession
- Completion in Aug, 2029
Specifications
FLOORING
- Italian marble flooring in the drawing, living, dining & kitchen Anti skid rustic tile flooring for deck
BATHROOMS
- Vitrified / ceramic / glazed tiles dado up to the lintel level Granite / composite marble basin counters and wash basins Door frame polished stone or granite Jaguar or equivalent bathroom fittings Hindware / Cera / Kohler or equivalent sanitary ware
KITCHEN
- Platform-mirror polished granite or granamite with S.S. sink ceramic tile or glass work, dado up to the lintel level Kota stone shelves in the store room
DOORS AND WINDOWS
- Main door with veneer finish along with wooden frame and video door phone All other doors are flush door with wooden frame Windows aluminum sections & domain series
FINISHES
- External double coat mala plaster with texture & 100% acrylic waterproof paint Internal single coat mala plaster with putty finish
ELECTRICAL
- 3 phase concealed wiring with adequate numbers of points in all rooms Branded modular switches Provision for DTH and internet points Provision for ELCB.MCB distribution box
PLUMBING
- C.P.V.C. / U.P.V.C. water supply pipes & PVC pipes for soil waste & drainage systems
STRUCTURE
- Earthquake resistant R.C.C frame structure BALCONIES/TERRACES S.S / M.S railing / glass railing
As stated by the builder; shown as filed.
RERA Registration
Phase registrations, completion timelines and available documents from the state RERA record.
Phase 1
RAA14390/061124/300829
Gujarat RERA
- Registered on
- Not stated
- Completion by
- Not stated
Indicative project-name match
A similarly named project was found in GujRERA
This match used project name and state, not the registration number. Treat it as indicative and verify the number on the live portal.
- Snapshot checked
- 21 Jul 2026
- Check the official portal
- Open GujRERA portal ↗
- Registry ID
- PR/GJ/AHMEDABAD/AHMEDABADCITY/AHMEDABADMUNICIPALCORPORATION/RAA14390/061124/300829
- Registry promoter
- SKD DEVELOPER PRIVATE LIMITED
- Registry project status
- New
Registry documents
Mirrored from GujRERA
Requesting a download sends your enquiry to the seller. Once sent, other documents for this project stay unlocked for this browser session.
Registration certificate
Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AHMEDABADMUNICIPALCORPORATION/RAA14390/061124/300829144 KB
Files are shown as captured in our registry snapshot. Always confirm the latest record on the official state portal before you transact.
About SKD Surya Nivaas
For those looking to buy a residential property, here comes one of the choicest offerings in Ahmedabad West, at Ghatlodia. Brought to you by SKD Developer, SKD Surya Nivaas is among the newest addresses for homebuyers. This is a new launch project right now, and is expected to be delivered by Aug, 2029. It has a variety of options to choose from that too in a varied budget range. SKD Surya Nivaas Ahmedabad West is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The…More ↓Less ↑
For those looking to buy a residential property, here comes one of the choicest offerings in Ahmedabad West, at Ghatlodia. Brought to you by SKD Developer, SKD Surya Nivaas is among the newest addresses for homebuyers. This is a new launch project right now, and is expected to be delivered by Aug, 2029. It has a variety of options to choose from that too in a varied budget range. SKD Surya Nivaas Ahmedabad West is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERA registration number of this project is RAA14390/061124/300829. Read on to know more about must-know features, SKD Surya Nivaas, Brochure download procedure and other exciting facts about the project.
Top Facilities
10 facilities recorded for this project
- Community Hall
- Car Parking
- 24/7 Water Supply
- CCTV Camera Security
- Fire Fighting Systems
- Internal Street Lights
- Waste Management
- Landscape Garden
- Sewage Treatment Plant
Location Advantages
Key destinations around SKD Surya Nivaas
AMC Garden
Park · 0.35 Km
IIMA
University · 1.5 Km
View Official Brochure
Official brochure
SKD Surya Nivaas
12 pages · 5.3 MB · PDF
Published by the builder; shown as filed.
Reading here is free. Downloading sends your enquiry to the seller so they can follow up.
Price Comparison
Current asking rates for this project, its locality and Ahmedabad.
Today’s asking rates
Project, locality and city benchmarks
Configuration rates in Ghatlodia2 configurations
- 2 BHK
- ₹7,445/sqft · 9 samples
- 3 BHK
- ₹6,109/sqft · 10 samples
Stamp duty and registration · Gujarat
- Stamp duty — 5.9 % for Male
- 5.9% for Male
- Stamp duty — 4.9 % for Female
- 4.9% for Female
- Stamp duty — 5.9 % for Joint (Male and Female)
- 5.9% for Joint (Male and Female)
- Stamp duty — 4.9 % For Joint (Female and Female)
- 4.9% For Joint (Female and Female)
- Registration
- Male Ownership: 1%
- Registration
- Female Ownership: No registration charges
- Registration
- Joint (Male + Female) Ownership: 1%
Recorded state rates for reference. Confirm the applicable amount at registration.
Project and locality asking-rate medians come from the PropertyBaazi project records in the sample shown. Registered rates come from government transaction records. Neither is a valuation, index or forecast.
Market Snapshot for Ghatlodia
Computed from 38 Ghatlodia projects in our catalogue (20 with a per-sqft price).
38 projects here, by price band
Society Reviews
Reviews by residents
No written reviews yet
Be the first to share a first-hand experience.
Explore life around SKD Surya Nivaas
Understand daily conveniences and connectivity around the project before planning a visit.
Based on 34 projects listed in Ghatlodia on PropertyBaazi — our catalog, not a market index.
Distances as recorded by the builder; others measured aerially on the map — straight lines, not routes. Map data © OpenStreetMap contributors.
View on mapColleges & Universities 1
- IIMA1.5 Km
Parks 1
- AMC Garden0.35 Km
Distances as recorded when the project was listed — approximate; please confirm on the ground.
Similar Projects
Comparable projects around Ghatlodia
About SKD Developer

SKD Developer
1 projects on PropertyBaazi
Frequently Asked Questions
What's the possession timeline at SKD Surya Nivaas?
SKD Surya Nivaas is still under construction, with possession expected around Aug, 2029.
Is SKD Surya Nivaas a RERA-registered project?
Yes. SKD Surya Nivaas is registered with GujRERA under number RAA14390/061124/300829, which you can verify on the official RERA portal.
Where is SKD Surya Nivaas and how well-connected is it?
SKD Surya Nivaas is located in Ghatlodia, Ahmedabad.
How big is the SKD Surya Nivaas project?
SKD Surya Nivaas is spread across 0.9 acres, 1 tower and 48 homes.
What can residents enjoy at SKD Surya Nivaas?
SKD Surya Nivaas comes with 10 amenities, including Landscape Garden, Car Parking, Internal Street Lights, Community Hall, CCTV Camera Security and Fire Fighting Systems.
What's around SKD Surya Nivaas for daily needs?
Close to SKD Surya Nivaas you'll find hospitals such as J J Hospital, Ahmedabad and Shri Rang Hospitaland Research Centre, schools like Nalanda School and Amrita Vidyalayam.
Who is developing SKD Surya Nivaas?
SKD Surya Nivaas is being developed by SKD Developer.
What stamp duty and registration charges apply at SKD Surya Nivaas?
Beyond the home price, budget for stamp duty (from about 4.9%) plus registration charges when you buy at SKD Surya Nivaas.
Quick Links
Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.





