Skip to main content

Outdoors

Elevation

01/03

Status

Outdoors · 1 of 3

Status — Elevation

Elevation

Status

Tupudana, Ranchi

RERA Registered+12 Top Facilities

Construction Status

New launch

Possession will start from Oct, 2027

Price on request

Price on request

Download Brochure

4 BHK

Area

Price on Request

Project Details

Project area
0.5 acres
Towers
1
Total units
23
Floors
8
Configurations
4 BHK
Property type
Villa
Possession
Completion in Oct, 2027
Specifications
Structure RCC Framed structure made by using Ultratech / Lafarge / ACC or equivalent cement and reinforced steel of Tata / Jindal / Sail or equivalent with anti fungus treatment.

DOORS

Premium quality Flush Doors with Sal Wood Frame with Mortise lock - Main Door & Cylindrical lock in all other doors.

ELECTRICALS

Wiring by Havells/Finolex/Polycab/KEI or equivalent, modular switches by Havells/Anchor/Greatwhite, with

TV, AC,

and geyser points in rooms.

PAINTING

Exterior
Silicon-based weather coat Over JK/Birla wall putty with Asian/Nerolac/Dulux texture paint.
Interior
Two coats of JK/Birla wall putty with primer finish.

FLOORING

Vitrified tiles of make Kajaria / Simpolo / Somany / RAK or equivalent. Granite / Marble in Staircase with finish railing.

PARKING

Parking Tiles in the Car
Parking area & Driveway
Paver Block. Parking Space for Residents. Electric Car charging points.

SANITARY

Fittings of Jaguar / Kohler or equivalent. Pipe fittings of Prince / Supreme / Astral / Flowguard or equivalent.

LIFTS

Automatic lifts of

KONE / OTIS / SCHINDLER / JOHNSON

or equivalent.

WALLS

External and
Internal
Autoclave Aerated Concrete

(ACC BLOCK)

in superstructure.

WINDOWS UPVC

Sliding windows (3 Track) of repute make.

KITCHEN

Granite Platform with S.S Sink with 2 Feet height dado tiles.

TOILET

Anti Skid floor tiles & Designer wall tiles upto 7 Feet height.
Make
Kajaria / Simpolo /

MOTTO / RAK

or equivalent

As stated by the builder; shown as filed.

RERA Registration

Phase registrations, completion timelines and available documents from the state RERA record.

  • Phase 1

    JHARERA/PROJECT/66/2025

    Jharkhand RERA

    Registered on
    Not stated
    Completion by
    Not stated
    Registered

Snapshot coverage unavailable

Jharkhand is not covered by this registry snapshot

No registration conclusion can be drawn from this snapshot. Check the live state portal before you transact.

Snapshot checked
21 Jul 2026
Check the official portal
Open Jharkhand RERA portal ↗

Registry documents

Mirrored from the state RERA registry

0 documents

No mirrored registry documents available

Document availability varies by state portal. Use the official RERA portal below for the latest filed records.

About Status

For those looking to buy a residential property, here comes one of the choicest offerings in Ranchi, at Tupudana. Brought to you by Anandi Estates, Status is among the newest addresses for homebuyers. This is a new launch project right now, and is expected to be delivered by Oct, 2027. It has a variety of options to choose from that too in a varied budget range. Status Ranchi is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERA registration number of thisMore ↓

For those looking to buy a residential property, here comes one of the choicest offerings in Ranchi, at Tupudana. Brought to you by Anandi Estates, Status is among the newest addresses for homebuyers. This is a new launch project right now, and is expected to be delivered by Oct, 2027. It has a variety of options to choose from that too in a varied budget range. Status Ranchi is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERA registration number of this project is JHARERA/PROJECT/66/2025. Read on to know more about must-know features, Status, Photos, Floor Plans, Brochure download procedure and other exciting facts about the project.

Top Facilities

12 facilities recorded for this project

  • Yoga / Meditation Area
  • Children's Play Area
  • Community Hall
  • Car Parking
  • Entrance Lobby
  • Gated Community
  • Fire Fighting Systems
  • 24/7 Security
  • Terrace Garden

Location Advantages

Key destinations around Status

Tupudana Chawk

Connectivity · 200 Mtrs

Tender Heart School

School · 500 Mtrs

Birsa Chowk

Connectivity · 2 Km

Smart City

Others · 6 Km

Hatia Railway Station

Railway Station · 8 Km

Ranchi Airport

Airport · 10 Km

View Official Brochure

Official brochure

Status

13 pages · 4.6 MB · PDF

Published by the builder; shown as filed.

Reading here is free. Downloading sends your enquiry to the seller so they can follow up.

Market Snapshot for Tupudana

Computed from 9 Tupudana projects in our catalogue (3 with a per-sqft price).

9 projects here, by price band

Budget
1
Affordable
2

Society Reviews

Reviews by residents

No written reviews yet

Be the first to share a first-hand experience.

Locality overview

Explore life around Status

Understand daily conveniences and connectivity around the project before planning a visit.

View full locality insights
9
Projects listed
2, 3 BHK
Popular configurations
New launch
Most common status

Based on 9 projects listed in Tupudana on PropertyBaazi — our catalog, not a market index.

Distances and travel times are approximate. Confirm routes and access conditions before making a purchase decision.
Builder

About Anandi Estates

View builder profile
Anandi Estates logo

Anandi Estates

1 projects on PropertyBaazi

Anandi Estates is a real estate company based in Ranchi, dedicated to providing quality homes and plots with a focus on customer satisfaction and timely delivery. They aim to create lasting relationships with their customers by offering transparent and reliable services.

FAQs

Frequently Asked Questions

What's the possession timeline at Status?

Status is still under construction, with possession expected around Oct, 2027.

Is Status a RERA-registered project?

Yes. Status is registered with the state RERA under number JHARERA/PROJECT/66/2025, which you can verify on the official RERA portal.

How much should I budget for Status?

Status offers 4 BHK Villa. Current pricing is shared on request — download the brochure from the project page for the latest price list.

Where is Status and how well-connected is it?

Status is located in Tupudana, Ranchi.

How big is the Status project?

Status is spread across 0.5 acres, 1 tower, up to 8 floors and 23 homes.

What can residents enjoy at Status?

Status comes with 12 amenities, including Children's Play Area, Terrace Garden, Landscape Garden, Yoga / Meditation Area, Open Space and Car Parking.

What's around Status for daily needs?

Close to Status you'll find hospitals such as The Vinayka Hospital and Research Centre and Max Orthopaedic Hospital and banks.

Who is developing Status?

Status is being developed by Anandi Estates.

Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.