Skip to main content

Outdoors

Aerial View

01/04

Sun Crest

Outdoors · 1 of 4

Sun Crest — Aerial View

Aerial View

Sun Crest

Bhadaj, Ahmedabad

RERA RegisteredFloor Plans Available+11 Top Facilities

Construction Status

Ready to move

Possession completed (Dec 2025)

Price on request

Price on request

Download Brochure

3 BHK

Carpet Area

841.52–876.18 sqft

Price on Request

Project Details

Project area
0.6 acres
Towers
2
Total units
83
Floors
11
Unit sizes
841.52–876.18 sqft · Carpet Area
Configurations
3 BHK
Property type
Apartment
Possession
Ready to move
Specifications

RCC Frame Structure Internal wall mala plaster with double coat white putty finish External double coat sand faced plaster or texture finish with 100% Acrylic Paint for exterior. Vitrified tiles flooring in all rooms Natural granite platform with sink and glazed tiles dado up to lintel level. Decorative main doors and other are flush doors. Aluminum sliding windows. Glazed tiles up to lintel level in all bathrooms with jaguar Company or equitant C.P fitting and sanitary ware. Concealed copper wiring with sufficient e ectric point in all rooms.

As stated by the builder; shown as filed.

RERA Registration

Phase registrations, completion timelines and available documents from the state RERA record.

  • Phase 1

    PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/250222

    Gujarat RERA

    Registered on
    25/02/2022
    Completion by
    31/12/2025
    Registered
Registry referencePR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/250222

Registration-number match

Registration number found in GujRERA

The project registration number matched the registry snapshot. Confirm the current status and filings on the live portal before booking.

Snapshot checked
21 Jul 2026
Check the official portal
Open GujRERA portal ↗
Registry ID
PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/250222
Registry promoter
SUN INFRACON
Registry project status
New

Registry documents

Mirrored from GujRERA

17 documents

Requesting a download sends your enquiry to the seller. Once sent, other documents for this project stay unlocked for this browser session.

  • Registration certificate

    Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/250222950 KB

  • Commencement certificate

    Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/2502224.2 MB

  • Title clearance certificate

    Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/250222462 KB

  • Title report

    Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/250222462 KB

  • Agreement for sale

    Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/250222128 KB

  • Approved sanction plan

    Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/2502223.1 MB

Plans & drawings2
  • Approved layout plan

    Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/2502222.4 MB

  • Area development plan

    Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/2502224.0 MB

Land, title & agreements6
  • Encumbrance certificate

    Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/250222219 KB

  • Land & location document

    Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/2502222.6 MB

  • Declaration (Form B)

    Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/250222637 KB

  • Draft sale agreement

    Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/250222189 KB

  • Draft allotment letter

    Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/2502221.4 MB

  • Property card (3)

    Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/25022273 KB

NOCs1
  • NOCs

    Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/250222546 KB

Other registry documents2
  • Brochure

    Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/2502222.4 MB

  • Project document

    Registration: PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/25022237 KB

Files are shown as captured in our registry snapshot. Always confirm the latest record on the official state portal before you transact.

Floor Plans & Pricing

Available configurations, areas and recorded pricing.

3 BHK

2 layouts

3 BHK Apartment

841.52 sq.ft.

Price on Request

3 BHK Apartment

876.18 sq.ft.

Price on Request

Room dimensions

Room-by-room dimensions from each plan’s published schedule — shown exactly as filed, never estimated.

3 BHK Apartment · 841.52 sq.ft.10 rooms
RoomDimensions (as printed)Area
Drawing Room4.72 m × 3.05 m155 sqft
Kitchen And Dining4.39 m × 2.74 m130 sqft
Bedroom3.05 m × 3.96 m130 sqft
Bedroom3.35 m × 4.78 m172 sqft
Bedroom3.05 m × 3.05 m100 sqft
Toilet1.42 m × 2.13 m33 sqft
Toilet1.83 m × 1.22 m24 sqft
Toilet1.52 m × 2.13 m35 sqft
WashService1.45 m × 1.83 m29 sqft
Balcony1.12 m × 1.72 m21 sqft

Itemized rooms add up to 829 sqft · super area 841.52 sqft (walls, circulation and balconies are not itemized)

3 BHK Apartment · 876.18 sq.ft.10 rooms
RoomDimensions (as printed)Area
Drawing Room3.20 m × 4.72 m163 sqft
Kitchen And Dining3.05 m × 4.27 m140 sqft
Bedroom3.05 m × 4.27 m140 sqft
Bedroom3.35 m × 4.57 m165 sqft
Bedroom3.05 m × 3.05 m100 sqft
Toilet1.22 m × 1.83 m24 sqft
Toilet1.52 m × 2.23 m37 sqft
Toilet1.52 m × 2.23 m37 sqft
WashService1.83 m × 1.32 m26 sqft
Balcony1.96 m × 1.11 m23 sqft

Itemized rooms add up to 855 sqft · super area 876.18 sqft (walls, circulation and balconies are not itemized)

About Sun Crest

For those looking to buy a residential property, here comes one of the choicest offerings in Ahmedabad West, at Bhadaj. Brought to you by Sun Infracon, Sun Crest is among the newest addresses for homebuyers. This is an under-construction project right now, and is expected to be delivered by Dec, 2025. It has a variety of options to choose from that too in a varied budget range. Sun Crest Ahmedabad West is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERAMore ↓

For those looking to buy a residential property, here comes one of the choicest offerings in Ahmedabad West, at Bhadaj. Brought to you by Sun Infracon, Sun Crest is among the newest addresses for homebuyers. This is an under-construction project right now, and is expected to be delivered by Dec, 2025. It has a variety of options to choose from that too in a varied budget range. Sun Crest Ahmedabad West is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERA registration number of this project is PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/250222. Read on to know more about must-know features, Sun Crest, Photos, Floor Plans, Payment Plans, Brochure download procedure and other exciting facts about the project.

Top Facilities

11 facilities recorded for this project

  • Swimming Pool
  • 24/7 Water Supply
  • Lift(s)
  • Car Parking
  • 24/7 Security
  • Gated Community
  • Security Cabin
  • Fire Fighting Systems
  • Sewage Treatment Plant

Location Advantages

Key destinations around Sun Crest

Bhadaj Primary School

School · 1Km

Sardar Patel Ring Road

Connectivity · 1.2Km

Bhadaj Cricket Ground

Others · 1.3Km

Science City Nature Park

Park · 3Km

CIMS Hospital

Hospital · 4.7Km

Ambli Railway station

Railway Station · 6.9Km

View Official Brochure

Official brochure

Sun Crest

11 pages · 2.4 MB · PDF

Published by the builder; shown as filed.

Reading here is free. Downloading sends your enquiry to the seller so they can follow up.

Price list

Published by the builder; shown as filed. Downloading sends the same enquiry.

Market Snapshot for Bhadaj

Computed from 23 Bhadaj projects in our catalogue (17 with a per-sqft price).

23 projects here, by price band

Budget
2
Affordable
8
Premium
5
Luxury
2

Society Reviews

Reviews by residents

No written reviews yet

Be the first to share a first-hand experience.

Locality overview

Explore life around Sun Crest

Understand daily conveniences and connectivity around the project before planning a visit.

View full locality insights
22
Projects listed
3, 4 BHK
Popular configurations
Ready to move
Most common status

Based on 22 projects listed in Bhadaj on PropertyBaazi — our catalog, not a market index.

Distances and travel times are approximate. Confirm routes and access conditions before making a purchase decision.
Builder

About Sun Infracon

View builder profile
Sun Infracon logo

Sun Infracon

1 projects on PropertyBaazi

FAQs

Frequently Asked Questions

Is Sun Crest ready to move in?

Sun Crest is under construction; its earlier possession date (Dec 2025) has passed, so confirm the current handover timeline with the developer.

Does Sun Crest have RERA approval?

Yes. Sun Crest is registered with GujRERA under number PR/GJ/AHMEDABAD/AHMEDABADCITY/AUDA/MAA09848/250222, which you can verify on the official RERA portal.

What are prices and sizes like at Sun Crest?

Sun Crest offers 3 BHK Apartment, sized 841.52–876.18 sq.ft carpet area. Current pricing is shared on request — download the brochure from the project page for the latest price list.

Whereabouts is Sun Crest, and what's the commute like?

Sun Crest is located in Bhadaj, Ahmedabad. The railway station is around 3.87 km away.

What's the scale of Sun Crest?

Sun Crest is spread across 0.6 acres, 2 towers, up to 11 floors and 83 homes.

What amenities does Sun Crest offer?

Sun Crest comes with 11 amenities, including Swimming Pool, Sewage Treatment Plant, Rain Water Harvesting, 24/7 Security, Gated Community and 24/7 Water Supply.

Which builder is behind Sun Crest?

Sun Crest is being developed by Sun Infracon.

What costs should I plan beyond the price of Sun Crest?

Beyond the home price, budget for stamp duty (from about 4.9%) plus registration charges when you buy at Sun Crest.

Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.