Loading project details…
Loading project details…
Hosakote, Kolar
Construction Status
New launch
Possession will start from Dec, 2031
Price on request
Price on request
Built with durable materials and thoughtful space utilization, the interiors focus on comfort and efficiency.
As stated by the builder; shown as filed.
Phase registrations, completion timelines and available documents from the state RERA record.
Phase 1
PRM/KA/RERA/1250/304/PR/260226/008490
Karnataka RERA
PRM/KA/RERA/1250/304/PR/260226/008490Registration-number match
Registration number found in K-RERA
The project registration number matched the registry snapshot. Confirm the current status and filings on the live portal before booking.
Registry documents
Mirrored from K-RERA
Requesting a download sends your enquiry to the seller. Once sent, other documents for this project stay unlocked for this browser session.
Registration certificate
Registration: PRM/KA/RERA/1250/304/PR/260226/0084901.3 MB
Commencement certificate
Registration: PRM/KA/RERA/1250/304/PR/260226/0084903.7 MB
Approved building plan
Registration: PRM/KA/RERA/1250/304/PR/260226/0084903.2 MB
Sectional drawing
Registration: PRM/KA/RERA/1250/304/PR/260226/0084903.9 MB
Brochure
Registration: PRM/KA/RERA/1250/304/PR/260226/008490143 KB
NOC — Escom Electricity
Registration: PRM/KA/RERA/1250/304/PR/260226/008490876 KB
NOC — Kwssb Water
Registration: PRM/KA/RERA/1250/304/PR/260226/008490613 KB
NOC — Kspcb
Registration: PRM/KA/RERA/1250/304/PR/260226/0084901.7 MB
NOC — Seiaa
Registration: PRM/KA/RERA/1250/304/PR/260226/0084902.7 MB
NOC — Fire Force Department
Registration: PRM/KA/RERA/1250/304/PR/260226/008490296 KB
NOC — Airport Authority Of India
Registration: PRM/KA/RERA/1250/304/PR/260226/0084903.8 MB
NOC — Bsnl
Registration: PRM/KA/RERA/1250/304/PR/260226/0084901.2 MB
Quarterly progress report
Registration: PRM/KA/RERA/1250/304/PR/260226/008490528 KB
Quarterly progress report (2)
Registration: PRM/KA/RERA/1250/304/PR/260226/0084902.0 MB
Quarterly progress report (3)
Registration: PRM/KA/RERA/1250/304/PR/260226/0084901.8 MB
Quarterly progress report (4)
Registration: PRM/KA/RERA/1250/304/PR/260226/008490526 KB
Quarterly progress report (5)
Registration: PRM/KA/RERA/1250/304/PR/260226/0084902.0 MB
Quarterly progress report (6)
Registration: PRM/KA/RERA/1250/304/PR/260226/0084901.8 MB
Files are shown as captured in our registry snapshot. Always confirm the latest record on the official state portal before you transact.
For those looking to buy a residential property, here comes one of the choicest offerings in Kolar, at Hosakote. Trivik Signature is among the newest addresses for homebuyers. This is a new launch project right now, and is expected to be delivered by Dec, 2031. It has a variety of options to choose from that too in a varied budget range. Trivik Signature Kolar is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERA registration number of this project is PRM/KA/RERA/1250/304/PR/260226/008490.
6 facilities recorded for this project
Key destinations around Trivik Signature
Dhruva Nursing Home And Diagnostic Centre
Hospital · 0.9 km
Kempanna Nursing Home
Hospital · 0.9 km
Government Boys High School
School · 0.9 km
Government Girls High School
School · 1.0 km
Sri Srinivasa Hospital, Bengaluru Rural
Hospital · 1.0 km
Ashwini Hospital
Hospital · 1.1 km
Computed from 1 Hosakote project in our catalogue.
Government charges
Stamp duty — 2 % of Value up to Rs 20 Lakh2 % of Value up to Rs 20 Lakh
Stamp duty — 3 % of Value between Rs 21–45 Lakh3 % of Value between Rs 21–45 Lakh
Stamp duty — 5 % of Value above Rs 45 Lakh(Rates applicable to both male and female).5 % of Value above Rs 45 Lakh(Rates applicable to both male and female).
Registration1 % of Value
As recorded for this state — confirm current rates at registration.
Reviews by residents
No written reviews yet
Be the first to share a first-hand experience.
Understand prices, daily conveniences and connectivity around the project before planning a visit.
Aerial distances measured on the map from the project’s recorded location — straight lines, not routes. Map data © OpenStreetMap contributors.
View on mapSchools 2
Colleges 1
Hospitals 5
Straight-line distances, approximate, measured from the project’s recorded location. Data © OpenStreetMap contributors.
Trivik Signature is still under construction, with possession expected around Dec, 2031.
Yes. Trivik Signature is registered with K-RERA under number PRM/KA/RERA/1250/304/PR/260226/008490, which you can verify on the official RERA portal.
Trivik Signature is located in Hosakote, Kolar.
Trivik Signature is up to 17 floors and 24 homes.
Trivik Signature comes with 6 amenities, including Fire Fighting Systems, Waste Management, Garbage Disposal, Sewage Treatment Plant, 24/7 Water Supply and Rain Water Harvesting.
Close to Trivik Signature you'll find hospitals such as Sri Srinivasa Hospital, Bengaluru Rural and Ashwini Hospital.
Beyond the home price, budget for stamp duty (from about 2%) plus registration charges when you buy at Trivik Signature.
Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.