Skip to main content

Outdoors

Elevation

01/03

Waystone Tigga Enclave

Outdoors · 1 of 3

Waystone Tigga Enclave — Elevation

Elevation

Waystone Tigga Enclave

Argora, Ranchi

RERA Registered+6 Top Facilities

Construction Status

New launch

Possession will start from May, 2027

Price on request

Price on request

Download Brochure

3 BHK

Super Built-up Area

1505–1826 sqft

Price on Request

Project Details

Towers
1
Total units
36
Floors
6
Unit sizes
1,505–1,826 sqft · Super Built-up Area
Configurations
3 BHK
Property type
Apartment
Possession
Completion in May, 2027
Specifications
Structure RCC framed structure with brick works, with cement mortar as per design & specification of structural consultants. Chowkhats & Doors Wooden door frames (Chowkhats) with flush door teak polish design.
Note
Entrance door (premium fancy door), other door (teak polish flush door). Windows Fully glazed aluminum frame with mirror look colour glass with grill. Floor Vitrified tiles. Kitchen
Flooring
Anti skid tiles.
Working platform
An L-shaped granite slab platform.
Dado
24" high glazed tiles.
Sink
Steel sink with drain board. Bathroom / Toilet
Flooring
Anti skid ceramic tiles.
Wall
Glazed / Ceramic tiles upto 7" height. Hot & Cold water line provided with mixture for shower. Sanitary Fitting Standard make white glazed sanitary wares with branded Jaguar / Hindware, ISI marked C.P. fittings with cistern of acrylic fiber glass. Electrical Concealed PVC pipes with ISI marked conduit wiring. All electrical switches & accessories of standard make (Modular). Adequate lighting / power point sockets, outlets etc. provided in each room. Dining Hall One coloured hand wash basin with bottle trap provided in dining hall. TV Cable & Telephone TV point & one telephone point in all bedrooms, drawing hall in each flat. Internal Wall Finish All internal walls shall be finished with wall putty. External Wall Finish Exquisitely designed classical exterior finish with Weather Coat Paint. Parking Area Flooring Parking area Mosaic Floor / Chequered Tiles. Lobby / Passage & Stair Vitrified tiles / Marble / Kota stone finished or as advised by our architect. Water Supply Round the clock water supply from own tube well with submersible pump. Security Guard & Maintenance Security guard & maintenance charges area paid by flat owners after completion of flats, these charges are fixed by promoter for six months, after that such maintenance is handled by flats owners.

As stated by the builder; shown as filed.

RERA Registration

Phase registrations, completion timelines and available documents from the state RERA record.

  • Phase 1

    JHARERA/PROJECT/108/2025

    Jharkhand RERA

    Registered on
    Not stated
    Completion by
    Not stated
    Registered

Snapshot coverage unavailable

Jharkhand is not covered by this registry snapshot

No registration conclusion can be drawn from this snapshot. Check the live state portal before you transact.

Snapshot checked
21 Jul 2026
Check the official portal
Open Jharkhand RERA portal ↗

Registry documents

Mirrored from the state RERA registry

0 documents

No mirrored registry documents available

Document availability varies by state portal. Use the official RERA portal below for the latest filed records.

About Waystone Tigga Enclave

For those looking to buy a residential property, here comes one of the choicest offerings in Ranchi, at Argora. Brought to you by Waystone Engicon, Waystone Tigga Enclave is among the newest addresses for homebuyers. There are apartments for sale in Waystone Tigga Enclave Argora, Ranchi. This is a new launch project right now, and is expected to be delivered by May, 2027 . Waystone Tigga Enclave Ranchi is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERAMore ↓

For those looking to buy a residential property, here comes one of the choicest offerings in Ranchi, at Argora. Brought to you by Waystone Engicon, Waystone Tigga Enclave is among the newest addresses for homebuyers. There are apartments for sale in Waystone Tigga Enclave Argora, Ranchi. This is a new launch project right now, and is expected to be delivered by May, 2027 . Waystone Tigga Enclave Ranchi is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERA registration number of this project is JHARERA/PROJECT/108/2025. Read on to know more about must-know features, Waystone Tigga Enclave Photos, Floor Plans, Payment Plans, Brochure download procedure and other exciting facts about the project.

Top Facilities

6 facilities recorded for this project

  • Car Parking
  • 24/7 Water Supply
  • Fire Fighting Systems
  • Waste Management
  • Sewage Treatment Plant
  • Rain Water Harvesting

Location Advantages

Key destinations around Waystone Tigga Enclave

Rinchi Trust Hospital

Hospital · 1.1 Km

St. Michael School Ranchi

School · 1.2 Km

Ranchi Railway Station

Railway Station · 5.7 Km

Birsa Munda Airport

Airport · 7.2 Km

Smart City Ranchi

Connectivity · 8.5 Km

View Official Brochure

Official brochure

Waystone Tigga Enclave

6 pages · 0.8 MB · PDF

Published by the builder; shown as filed.

Reading here is free. Downloading sends your enquiry to the seller so they can follow up.

Price list

Published by the builder; shown as filed. Downloading sends the same enquiry.

Market Snapshot for Argora

Computed from 13 Argora projects in our catalogue (7 with a per-sqft price).

13 projects here, by price band

Budget
1
Affordable
5
Premium
1

Society Reviews

Reviews by residents

No written reviews yet

Be the first to share a first-hand experience.

Locality overview

Explore life around Waystone Tigga Enclave

Understand daily conveniences and connectivity around the project before planning a visit.

View full locality insights
13
Projects listed
2, 3 BHK
Popular configurations
Under construction
Most common status

Based on 13 projects listed in Argora on PropertyBaazi — our catalog, not a market index.

Distances and travel times are approximate. Confirm routes and access conditions before making a purchase decision.
Builder

About Waystone Engicon

View builder profile
Waystone Engicon logo

Waystone Engicon

1 projects on PropertyBaazi

FAQs

Frequently Asked Questions

Is Waystone Tigga Enclave ready to move in?

Waystone Tigga Enclave is still under construction, with possession expected around May, 2027.

Does Waystone Tigga Enclave have RERA approval?

Yes. Waystone Tigga Enclave is registered with the state RERA under number JHARERA/PROJECT/108/2025, which you can verify on the official RERA portal.

What does a home at Waystone Tigga Enclave cost?

Waystone Tigga Enclave offers 3 BHK Apartment, sized 1,505–1,826 sq.ft super built-up area. Current pricing is shared on request — download the brochure from the project page for the latest price list.

Whereabouts is Waystone Tigga Enclave, and what's the commute like?

Waystone Tigga Enclave is located in Argora, Ranchi.

What's the scale of Waystone Tigga Enclave?

Waystone Tigga Enclave is 1 tower, up to 6 floors and 36 homes.

What amenities does Waystone Tigga Enclave offer?

Waystone Tigga Enclave comes with 6 amenities, including Car Parking, Fire Fighting Systems, Waste Management, Sewage Treatment Plant, 24/7 Water Supply and Rain Water Harvesting.

What conveniences are near Waystone Tigga Enclave?

Close to Waystone Tigga Enclave you'll find hospitals such as Om Sri Sai Hospital and Research Centre and Harmu Hospital & Research Centre.

Which builder is behind Waystone Tigga Enclave?

Waystone Tigga Enclave is being developed by Waystone Engicon.

Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.