Construction Status
Under construction
Possession will start from Jun, 2030
₹1.07 Cr - 1.4 Cr
Price range· ₹12,614/sqft
3 BHK
Carpet Area
850–1080 sqft
₹1.07 - 1.4 Cr
Project Details
- Project area
- 4.32 acres
- Towers
- 2
- Total units
- 288
- Floors
- 7
- Open area
- 70%
- Unit sizes
- 850–1,080 sqft · Carpet Area
- Price per sqft
- ₹12,614
- Configurations
- 3 BHK
- Property type
- Apartment
- Possession
- Completion in Jun, 2030
Specifications
FLOORING
- Wooden texture vitrified flooring for the Master Bedroom. 800 mm x 800 mm vitrified floor tiles for drawing, dining, rooms & kitchen. 300 mm x 300 mm size anti-skid mat finish tiles for utility, balcony & toilets. Anti-skid ceramic tiles in flooring for toilets. Entrance lobby finished with anti-skid tiles.
BATHROOMS
- Sanitary fittings of Jaguar or equivalent. Glazed wall tiles for toilets.
KITCHEN
- Glazed wall tile dado. Provision for water purifier point. Provision for washing machine point in utility area.
DOORS AND WINDOWS
- Main door
- Teak wood frame with teak veneer shutters.
- Other doors
- Sal wood frames with flush shutters, branded hardware fittings Icony doors.
UPVC
- window with mosquito mesh provision. Safety MS grills for windows.
FINISHES
- Internal walls
- Smoothly plastered.
- External walls
- Sponge finished.
- Interior walls
- Asian One emulsion coat of paint primer with a two coat smooth finish.
- Exterior walls
- Textured finish with one coat of primer and two coats of ACE paint. Granite for staircase and railing in the entrance lobby.
ELECTRICAL
- FR-LSH (Fire Resistant Low Smoke Halogen) concealed copper wiring of Anchor or equivalent. Modular switches and sockets of Havells or equivalent.
BUILDING STRUCTURE
- R.C.C. framed structure and solid cement blocks. External walls of 6 solid blocks. Internal walls with 4 solid blocks.
VERTICAL TRANSPORTATION
- 8 passenger capacity lift of
KONE
- or equivalent brand.
POWER
- BACK-UP Generator backup of 1 KV for each flat. Additional power back-up for lift, water pump and common area lighting.
WATER SUPPLY
- 24 hr adequate water supply through borewells.
PARKING
- Exclusive covered parking. Open car parking.
SECURITY
- 24/7
CCTV
- surveillance. App based security controls.
As stated by the builder; shown as filed.
RERA Registration
Phase registrations, completion timelines and available documents from the state RERA record.
Phase 1
PRM/KA/RERA/1251/308/PR/180325/007592
Karnataka RERA
- Registered on
- Not stated
- Completion by
- Not stated
PRM/KA/RERA/1251/308/PR/180325/007592Registration-number match
Registration number found in K-RERA
The project registration number matched the registry snapshot. Confirm the current status and filings on the live portal before booking.
- Snapshot checked
- 21 Jul 2026
- Check the official portal
- Open K-RERA portal ↗
- Registry ID
- PRM/KA/RERA/1251/308/PR/180325/007592
- Registry promoter
- ABHEE VENTURES PRIVATE LIMITED
Registry documents
Mirrored from K-RERA
Requesting a download sends your enquiry to the seller. Once sent, other documents for this project stay unlocked for this browser session.
Registration certificate
Registration: PRM/KA/RERA/1251/308/PR/180325/0075921.3 MB
Commencement certificate
Registration: PRM/KA/RERA/1251/308/PR/180325/007592266 KB
Approved building plan
Registration: PRM/KA/RERA/1251/308/PR/180325/0075926.4 MB
Sectional drawing
Registration: PRM/KA/RERA/1251/308/PR/180325/0075928.7 MB
Brochure
Registration: PRM/KA/RERA/1251/308/PR/180325/007592903 KB
NOC — Escom Electricity
Registration: PRM/KA/RERA/1251/308/PR/180325/007592690 KB
NOCs12
NOC — Kwssb Water
Registration: PRM/KA/RERA/1251/308/PR/180325/007592129 KB
NOC — Kspcb
Registration: PRM/KA/RERA/1251/308/PR/180325/007592995 KB
NOC — Seiaa
Registration: PRM/KA/RERA/1251/308/PR/180325/0075923.7 MB
NOC — Fire Force Department
Registration: PRM/KA/RERA/1251/308/PR/180325/007592273 KB
NOC — Airport Authority Of India
Registration: PRM/KA/RERA/1251/308/PR/180325/0075923.6 MB
NOC — Bsnl
Registration: PRM/KA/RERA/1251/308/PR/180325/007592432 KB
NOC — Lift Authorities
Registration: PRM/KA/RERA/1251/308/PR/180325/00759249 KB
NOC — Bmrcl
Registration: PRM/KA/RERA/1251/308/PR/180325/00759249 KB
NOC — Noc In Case Of Building Proposals Abutting To Neighbouring P
Registration: PRM/KA/RERA/1251/308/PR/180325/00759249 KB
NOC — Bangalore Urban Arts Commission
Registration: PRM/KA/RERA/1251/308/PR/180325/00759249 KB
NOC — Inspector Of Factories Controller Of Explosives Railways
Registration: PRM/KA/RERA/1251/308/PR/180325/00759249 KB
NOC — Coastal Regulation Zone Authority
Registration: PRM/KA/RERA/1251/308/PR/180325/00759249 KB
Progress & status reports9
Quarterly progress report
Registration: PRM/KA/RERA/1251/308/PR/180325/0075922.3 MB
Quarterly progress report (2)
Registration: PRM/KA/RERA/1251/308/PR/180325/0075922.7 MB
Quarterly progress report (3)
Registration: PRM/KA/RERA/1251/308/PR/180325/0075923.0 MB
Quarterly progress report (4)
Registration: PRM/KA/RERA/1251/308/PR/180325/007592881 KB
Quarterly progress report (5)
Registration: PRM/KA/RERA/1251/308/PR/180325/0075924.9 MB
Quarterly progress report (6)
Registration: PRM/KA/RERA/1251/308/PR/180325/0075924.9 MB
Quarterly progress report (7)
Registration: PRM/KA/RERA/1251/308/PR/180325/007592855 KB
Quarterly progress report (8)
Registration: PRM/KA/RERA/1251/308/PR/180325/007592594 KB
Quarterly progress report (9)
Registration: PRM/KA/RERA/1251/308/PR/180325/007592699 KB
Files are shown as captured in our registry snapshot. Always confirm the latest record on the official state portal before you transact.
About Abhee Serenity Springs
Check out Abhee Serenity Springs in Electronic City Phase 2, one of the upcoming under-construction housing societies in Bangalore South. There are apartments for sale in Abhee Serenity Springs Electronic City Phase 2, Bangalore. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Abhee Ventures, Abhee Serenity Springs is scheduled for possession in Jun, 2030. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The…More ↓Less ↑
Check out Abhee Serenity Springs in Electronic City Phase 2, one of the upcoming under-construction housing societies in Bangalore South. There are apartments for sale in Abhee Serenity Springs Electronic City Phase 2, Bangalore. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Abhee Ventures, Abhee Serenity Springs is scheduled for possession in Jun, 2030. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The RERA registration number of this project is PRM/KA/RERA/1251/308/PR/180325/007592. Abhee Ventures is one of the known real estate brands in Bangalore South.The builder has delivered 6 projects so far. Around 3 projects are upcoming. There are 4 projects of this builder, which are currently under-construction. Here’s everything you need to know about the must-know features of this housing society along with Abhee Serenity Springs Photos, Floor Plans, Payment Plans, Brochure download procedure and other exciting facts about your future home:
Top Facilities
20 facilities recorded for this project
- Swimming Pool
- Gymnasium
- Skating Rink
- Yoga / Meditation Area
- Chess
- Spa
- Club House
- Children's Play Area
- Multipurpose Hall
Location Advantages
Key destinations around Abhee Serenity Springs
BS Carmel School
School · 500m
Mazumdar Medical Center
Hospital · 2.2km
IIIT
University · 8.2km
Heelalige
Railway Station · 4km
Kempegowda International Airport
Airport · 57.4km
M5 Ecity Mall
Shopping Center/ Market/ Mall · 6.5km
View Official Brochure
Official brochure
Abhee Serenity Springs
35 pages · 4.4 MB · PDF
Published by the builder; shown as filed.
Reading here is free. Downloading sends your enquiry to the seller so they can follow up.
Price list
Published by the builder; shown as filed. Downloading sends the same enquiry.
Price Comparison
Current asking rates for this project, its locality and Bengaluru.
Today’s asking rates
Project, locality and city benchmarks
Configuration rates in Electronic City Phase 23 configurations
- 1 BHK
- ₹6,415/sqft · 6 samples
- 2 BHK
- ₹6,025/sqft · 16 samples
- 3 BHK
- ₹6,618/sqft · 18 samples
Stamp duty and registration · Karnataka
- Stamp duty — 2 % of Value up to Rs 20 Lakh
- 2% of Value up to ₹20 Lakh
- Stamp duty — 3 % of Value between Rs 21–45 Lakh
- 3% of Value between ₹21–45 Lakh
- Stamp duty — 5 % of Value above Rs 45 Lakh(Rates applicable to both male and female).
- 5% of Value above ₹45 Lakh(Rates applicable to both male and female).
- Registration
- 1% of Value
Recorded state rates for reference. Confirm the applicable amount at registration.
Project and locality asking-rate medians come from the PropertyBaazi project records in the sample shown. Registered rates come from government transaction records. Neither is a valuation, index or forecast.
Market Snapshot for Electronic City Phase 2
Computed from 37 Electronic City Phase 2 projects in our catalogue (21 with a per-sqft price).
37 projects here, by price band
Society Reviews
Reviews by residents
No written reviews yet
Be the first to share a first-hand experience.
Explore life around Abhee Serenity Springs
Understand daily conveniences and connectivity around the project before planning a visit.
Based on 37 projects listed in Electronic City Phase 2 on PropertyBaazi — our catalog, not a market index.
Distances as recorded by the builder — approximate; please confirm on the ground.
View on mapMetro & Rail 1
- Heelalige4km
Schools 1
- BS Carmel School500m
Colleges & Universities 1
- IIIT8.2km
Hospitals 1
- Mazumdar Medical Center2.2km
Shopping & Malls 1
- M5 Ecity Mall6.5km
Business Hubs 1
- Pride Gateway7.1km
Roads & Connectivity 1
- NH 441.8km
Airport 1
- Kempegowda International Airport57.4km
Hotels 1
- The Oterra Hotel9.5km
Golf 1
- Infosys Golf Course10.6km
Distances as recorded when the project was listed — approximate; please confirm on the ground.
Similar Projects
Comparable projects around Electronic City Phase 2
About Abhee Ventures

Abhee Ventures
12 projects on PropertyBaazi
Projects by Abhee Ventures
Frequently Asked Questions
Is Abhee Serenity Springs ready to move in?
Abhee Serenity Springs is still under construction, with possession expected around Jun, 2030.
Is Abhee Serenity Springs a RERA-registered project?
Yes. Abhee Serenity Springs is registered with K-RERA under number PRM/KA/RERA/1251/308/PR/180325/007592, which you can verify on the official RERA portal.
What are prices and sizes like at Abhee Serenity Springs?
Homes at Abhee Serenity Springs are priced ₹1.07 Cr - 1.4 Cr (about ₹12,614/sq.ft) for 3 BHK Apartment, sized 850–1,080 sq.ft carpet area.
Where is Abhee Serenity Springs and how well-connected is it?
Abhee Serenity Springs is located in Electronic City Phase 2, Bengaluru.
How big is the Abhee Serenity Springs project?
Abhee Serenity Springs is spread across 4.3 acres, 2 towers, up to 7 floors and 288 homes.
What can residents enjoy at Abhee Serenity Springs?
Abhee Serenity Springs comes with 20 amenities, including Swimming Pool, Gymnasium, Club House, Children's Play Area, Skating Rink and Yoga / Meditation Area.
What's around Abhee Serenity Springs for daily needs?
Close to Abhee Serenity Springs you'll find hospitals such as Global Speciality Hospital and Naryana Hrudalya.
Who is developing Abhee Serenity Springs?
Abhee Serenity Springs is being developed by Abhee Ventures.
Quick Links
Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.