Skip to main content

Outdoors

Elevation

01/14

JMS Group The Majestic

Outdoors · 1 of 14

JMS Group The Majestic — Elevation

Elevation

JMS Group The Majestic

Harsaru, Gurugram

RERA Registered+20 Top Facilities

Construction Status

New launch

Possession will start from Jun, 2028

₹1.51 Cr - 2.19 Cr

Price range· ₹8,947/sqft

Download Brochure

3 BHK

Super Built-up Area

1691–2453 sqft

₹1.51 - 2.19 Cr

Project Details

Project area
1.43 acres
Total units
236
Floors
4
Open area
70%
Unit sizes
1,691–2,453 sqft · Super Built-up Area
Price per sqft
₹8,947
Configurations
3 BHK
Property type
Apartment
Possession
Completion in Jun, 2028
Specifications

DRAWING / DINING ROOM

Floor
Vitrified Tiles
Ceiling
Oil Bound Distemper
Wall
Acrylic Emulsion

BEDROOM

Floor
Vitrified Tiles / Wooden Flooring (Master Bedroom)
Ceiling
Oil Bound Distemper
Wall
Acrylic Emulsion
Wardrobe
In all Bedrooms
AC
In all Bedrooms

MODULAR KITCHEN

Floor
Vitrified / Ceramic Tiles
Wall / Ceiling
Oil Bound Distemper
Dado
Ceramic Tiles Counter
Top
Granite Stone
Fittings & Fixtures
ISI Marked CP, Fittings & SS Sink, Hob & Chimney, Microwave, RO in Kitchen
Others
Kitchen Wardrobe below the counter

BALCONIES

Floor
Anti-Skid / Matt Finish Ceramic Tiles
Railing
Glass Railing / MS Railing

TERRACE

Flooring
Brickbat Coba + Brick Tiles
Treatment
Water Proofing Treatment

TOILET & BATHROOM

Floor
Vitrified / Ceramic Tiles
Wall
Ceramic Tiles
Ceiling
Grid False Ceiling
Fittings & Fixtures
ISI Marked CP Fittings, WC & Wash Basin, Geyser in Master Toilet, Vanity in Master Toilet

DOORS & WINDOWS

Main / Internal Door
Frame
Hard Wood / Red Meranti + Flush Door Internal Door
Shutters
Flush Doors External
Doors & Windows

UPVC

/ Aluminium, Powder Coated

ELECTRICAL

Wiring
Copper wiring throughout in concealed conduit for light points
Switches / Socket
ISI Marked Switches & Sockets
Security
Digital Lock, Video Door Phone,

CCTV

Access Control System
Others
MRL Lifts, Fan & LED Lights

EXTERNAL DEVELOPMENT

Internal
Roads
Interlocking Blocks / Tremix Concrete Road Boundary
Wall
RCC / Brick Wall with Plaster & Paint External
Paint
Weather Proof Texture Paint in Buildings

STRUCTURE

Earthquake
Resistant
RCC Framed Structure as per seismic zone

As stated by the builder; shown as filed.

RERA Registration

Phase registrations, completion timelines and available documents from the state RERA record.

  • Phase 1

    GGM/966/698/2025/69 DATED 03.07.2025

    Haryana RERA

    Registered on
    03/07/2025
    Completion by
    30/06/2028
    Registered
  • Phase 2

    GGM/975/707/2025/78 DATED 14.08.2025

    Haryana RERA

    Registered on
    14/08/2025
    Completion by
    30/06/2028
    Registered
  • Phase 3

    GGM/988/720/2025/91 DATED 14.10.2025

    Haryana RERA

    Registered on
    14/10/2025
    Completion by
    31/03/2028
    Registered
  • Phase 4

    GGM/1033/765/2026/05 DATED 15.01.2026

    Haryana RERA

    Registered on
    15/01/2026
    Completion by
    31/12/2028
    Registered
Registry referencesRERA-GRG-1964-2025RERA-GRG-1984-2025RERA-GRG-2038-2025RERA-GRG-2131-2025

Registration-number match

Registration number found in HRERA-GGM

The project registration number matched the registry snapshot. Confirm the current status and filings on the live portal before booking.

Snapshot checked
21 Jul 2026
Check the official portal
Open HRERA portal ↗
Registry ID
RERA-GRG-1964-2025
Registry promoter
JMS REALTY DEVELOPERS LLP

Registry documents

Mirrored from HRERA-GGM

252 documents

Requesting a download sends your enquiry to the seller. Once sent, other documents for this project stay unlocked for this browser session.

  • CA certificate

    Registration: RERA-GRG-1964-2025314 KB

  • CA certificate

    Registration: RERA-GRG-1984-202562 KB

  • CA certificate

    Registration: RERA-GRG-2038-2025314 KB

  • CA certificate (2)

    Registration: RERA-GRG-2038-2025929 KB

  • CA certificate

    Registration: RERA-GRG-2131-202562 KB

  • Licence

    Registration: RERA-GRG-1964-2025872 KB

Certificates & approvals4
  • Licence

    Registration: RERA-GRG-1984-2025872 KB

  • Licence

    Registration: RERA-GRG-2038-2025872 KB

  • Licence (2)

    Registration: RERA-GRG-2038-2025872 KB

  • Licence

    Registration: RERA-GRG-2131-2025872 KB

Plans & drawings46
  • Approved plan

    Registration: RERA-GRG-1964-20252.2 MB

  • Approved plan (3)

    Registration: RERA-GRG-1964-2025901 KB

  • Approved plan (4)

    Registration: RERA-GRG-1964-20253.4 MB

  • Approved plan (2)

    Registration: RERA-GRG-1964-20254.9 MB

  • Approved plan (5)

    Registration: RERA-GRG-1964-20256 KB

  • Approved plan (6)

    Registration: RERA-GRG-1964-20254.3 MB

  • Approved plan

    Registration: RERA-GRG-1984-20252.2 MB

  • Approved plan (2)

    Registration: RERA-GRG-1984-20254.9 MB

  • Approved plan (3)

    Registration: RERA-GRG-1984-20252.2 MB

  • Approved plan (5)

    Registration: RERA-GRG-1984-2025901 KB

  • Approved plan (4)

    Registration: RERA-GRG-1984-20253.7 MB

  • Approved plan (7)

    Registration: RERA-GRG-1984-2025578 KB

  • Approved plan (6)

    Registration: RERA-GRG-1984-20253.7 MB

  • Approved plan (8)

    Registration: RERA-GRG-1984-20253.7 MB

  • Approved plan (9)

    Registration: RERA-GRG-1984-20253.0 MB

  • Approved plan (10)

    Registration: RERA-GRG-1984-20253.7 MB

  • Approved plan (11)

    Registration: RERA-GRG-1984-20253.7 MB

  • Approved plan (12)

    Registration: RERA-GRG-1984-20253.8 MB

  • Approved plan (13)

    Registration: RERA-GRG-1984-20253.6 MB

  • Approved plan (14)

    Registration: RERA-GRG-1984-20253.7 MB

  • Approved plan

    Registration: RERA-GRG-2038-20252.2 MB

  • Approved plan (2)

    Registration: RERA-GRG-2038-2025335 KB

  • Approved plan (3)

    Registration: RERA-GRG-2038-20252.2 MB

  • Approved plan (4)

    Registration: RERA-GRG-2038-2025901 KB

  • Approved plan (5)

    Registration: RERA-GRG-2038-20254.9 MB

  • Approved plan (2)

    Registration: RERA-GRG-2131-20252.2 MB

  • Approved plan

    Registration: RERA-GRG-2131-20252.2 MB

  • Approved plan (3)

    Registration: RERA-GRG-2131-20253.3 MB

  • Approved plan (4)

    Registration: RERA-GRG-2131-20253.3 MB

  • Approved plan (5)

    Registration: RERA-GRG-2131-20253.2 MB

  • Approved plan (6)

    Registration: RERA-GRG-2131-20253.2 MB

  • Approved plan (7)

    Registration: RERA-GRG-2131-20253.4 MB

  • Approved plan (8)

    Registration: RERA-GRG-2131-2025901 KB

  • Approved plan (9)

    Registration: RERA-GRG-2131-20253.2 MB

  • Approved plan (10)

    Registration: RERA-GRG-2131-20254.9 MB

  • Approved plan (11)

    Registration: RERA-GRG-2131-20253.3 MB

  • Approved plan (12)

    Registration: RERA-GRG-2131-20253.4 MB

  • Approved plan (13)

    Registration: RERA-GRG-2131-20253.3 MB

  • Approved plan (14)

    Registration: RERA-GRG-2131-20253.3 MB

  • Approved plan (15)

    Registration: RERA-GRG-2131-20253.3 MB

  • Approved plan (16)

    Registration: RERA-GRG-2131-20253.3 MB

  • Approved plan (17)

    Registration: RERA-GRG-2131-20253.4 MB

  • Approved plan (18)

    Registration: RERA-GRG-2131-20253.4 MB

  • Approved plan (19)

    Registration: RERA-GRG-2131-20253.3 MB

  • Approved plan (20)

    Registration: RERA-GRG-2131-20253.2 MB

  • Approved plan (21)

    Registration: RERA-GRG-2131-20253.3 MB

Land, title & agreements18
  • Agreement

    Registration: RERA-GRG-1964-20251.2 MB

  • Declaration

    Registration: RERA-GRG-1964-20251.1 MB

  • Declaration (2)

    Registration: RERA-GRG-1964-2025255 KB

  • Declaration (3)

    Registration: RERA-GRG-1964-2025695 KB

  • Agreement (2)

    Registration: RERA-GRG-1964-2025725 KB

  • Declaration (4)

    Registration: RERA-GRG-1964-202563 KB

  • Declaration

    Registration: RERA-GRG-1984-2025323 KB

  • Declaration (2)

    Registration: RERA-GRG-1984-2025215 KB

  • Agreement

    Registration: RERA-GRG-1984-20251.2 MB

  • Agreement (2)

    Registration: RERA-GRG-1984-2025730 KB

  • Declaration

    Registration: RERA-GRG-2038-2025207 KB

  • Agreement

    Registration: RERA-GRG-2038-2025724 KB

  • Declaration (2)

    Registration: RERA-GRG-2038-2025360 KB

  • Declaration (3)

    Registration: RERA-GRG-2038-20251.7 MB

  • Declaration

    Registration: RERA-GRG-2131-2025229 KB

  • Agreement

    Registration: RERA-GRG-2131-2025173 KB

  • Agreement (2)

    Registration: RERA-GRG-2131-2025310 KB

  • Declaration (2)

    Registration: RERA-GRG-2131-20251.6 MB

NOCs5
  • NOC

    Registration: RERA-GRG-1964-2025431 KB

  • NOC

    Registration: RERA-GRG-1984-2025431 KB

  • NOC

    Registration: RERA-GRG-2038-2025593 KB

  • NOC (2)

    Registration: RERA-GRG-2038-2025431 KB

  • NOC

    Registration: RERA-GRG-2131-2025299 KB

Other registry documents173
  • Other document

    Registration: RERA-GRG-1964-20251.5 MB

  • Other document (3)

    Registration: RERA-GRG-1964-202543 KB

  • Other document (2)

    Registration: RERA-GRG-1964-20251.4 MB

  • Other document (4)

    Registration: RERA-GRG-1964-20251.5 MB

  • Other document (5)

    Registration: RERA-GRG-1964-2025123 KB

  • Other document (6)

    Registration: RERA-GRG-1964-20251.4 MB

  • Other document (7)

    Registration: RERA-GRG-1964-2025539 KB

  • Other document (8)

    Registration: RERA-GRG-1964-20251.4 MB

  • Other document (9)

    Registration: RERA-GRG-1964-20251023 KB

  • Other document (10)

    Registration: RERA-GRG-1964-2025424 KB

  • Other document (11)

    Registration: RERA-GRG-1964-20251.5 MB

  • Other document (13)

    Registration: RERA-GRG-1964-202597 KB

  • Other document (12)

    Registration: RERA-GRG-1964-20251.4 MB

  • Other document (14)

    Registration: RERA-GRG-1964-2025777 KB

  • Other document (15)

    Registration: RERA-GRG-1964-2025146 KB

  • Other document (16)

    Registration: RERA-GRG-1964-20251.3 MB

  • Other document (17)

    Registration: RERA-GRG-1964-20251.3 MB

  • Other document (18)

    Registration: RERA-GRG-1964-2025538 KB

  • Other document (19)

    Registration: RERA-GRG-1964-20251.2 MB

  • Other document (20)

    Registration: RERA-GRG-1964-202545 KB

  • Other document (21)

    Registration: RERA-GRG-1964-20251.4 MB

  • Other document (22)

    Registration: RERA-GRG-1964-20251.3 MB

  • Other document (24)

    Registration: RERA-GRG-1964-2025588 KB

  • Other document (25)

    Registration: RERA-GRG-1964-202546 KB

  • Other document (23)

    Registration: RERA-GRG-1964-20251.5 MB

  • Other document (27)

    Registration: RERA-GRG-1964-20251.2 MB

  • Other document (26)

    Registration: RERA-GRG-1964-20251.2 MB

  • Other document (28)

    Registration: RERA-GRG-1964-20251.5 MB

  • Other document (29)

    Registration: RERA-GRG-1964-20251.5 MB

  • Other document (30)

    Registration: RERA-GRG-1964-20251.4 MB

  • Other document (33)

    Registration: RERA-GRG-1964-20251.4 MB

  • Other document (31)

    Registration: RERA-GRG-1964-20251.2 MB

  • Other document (32)

    Registration: RERA-GRG-1964-20251.5 MB

  • Other document (34)

    Registration: RERA-GRG-1964-20251.2 MB

  • Other document (36)

    Registration: RERA-GRG-1964-20251.4 MB

  • Other document (35)

    Registration: RERA-GRG-1964-20251.2 MB

  • Other document (37)

    Registration: RERA-GRG-1964-20251.2 MB

  • Other document (38)

    Registration: RERA-GRG-1964-20251.1 MB

  • Other document (39)

    Registration: RERA-GRG-1964-2025483 KB

  • Brochure

    Registration: RERA-GRG-1964-2025918 KB

  • Other document (40)

    Registration: RERA-GRG-1964-2025672 KB

  • Other document

    Registration: RERA-GRG-1984-20251.4 MB

  • Other document (2)

    Registration: RERA-GRG-1984-202539 KB

  • Other document (3)

    Registration: RERA-GRG-1984-20252.3 MB

  • Other document (4)

    Registration: RERA-GRG-1984-20251.2 MB

  • Other document (5)

    Registration: RERA-GRG-1984-2025104 KB

  • Other document (6)

    Registration: RERA-GRG-1984-2025594 KB

  • Other document (7)

    Registration: RERA-GRG-1984-20251.2 MB

  • Other document (8)

    Registration: RERA-GRG-1984-20251.3 MB

  • Other document (9)

    Registration: RERA-GRG-1984-20251.0 MB

  • Other document (10)

    Registration: RERA-GRG-1984-20251.4 MB

  • Other document (11)

    Registration: RERA-GRG-1984-20251.6 MB

  • Brochure

    Registration: RERA-GRG-1984-20251.3 MB

  • Other document (12)

    Registration: RERA-GRG-1984-2025249 KB

  • Other document (13)

    Registration: RERA-GRG-1984-2025777 KB

  • Other document (14)

    Registration: RERA-GRG-1984-20251.4 MB

  • Other document (15)

    Registration: RERA-GRG-1984-20251.2 MB

  • Other document (16)

    Registration: RERA-GRG-1984-20251.4 MB

  • Other document (17)

    Registration: RERA-GRG-1984-202547 KB

  • Other document (18)

    Registration: RERA-GRG-1984-20251.1 MB

  • Other document (19)

    Registration: RERA-GRG-1984-202544 KB

  • Other document (20)

    Registration: RERA-GRG-1984-2025539 KB

  • Other document (21)

    Registration: RERA-GRG-1984-2025483 KB

  • Other document (22)

    Registration: RERA-GRG-1984-20251.2 MB

  • Other document (23)

    Registration: RERA-GRG-1984-20251.4 MB

  • Other document (24)

    Registration: RERA-GRG-1984-20251.4 MB

  • Other document (25)

    Registration: RERA-GRG-1984-20251.4 MB

  • Other document (26)

    Registration: RERA-GRG-1984-20251.4 MB

  • Other document (27)

    Registration: RERA-GRG-1984-20251.4 MB

  • Other document (28)

    Registration: RERA-GRG-1984-20251.3 MB

  • Other document (29)

    Registration: RERA-GRG-1984-20251.3 MB

  • Other document (30)

    Registration: RERA-GRG-1984-20251.4 MB

  • Other document (31)

    Registration: RERA-GRG-1984-20251.4 MB

  • Other document (32)

    Registration: RERA-GRG-1984-20251.3 MB

  • Other document (33)

    Registration: RERA-GRG-1984-2025578 KB

  • Other document (34)

    Registration: RERA-GRG-1984-20251.1 MB

  • Other document (35)

    Registration: RERA-GRG-1984-2025842 KB

  • Other document (36)

    Registration: RERA-GRG-1984-2025210 KB

  • Other document (37)

    Registration: RERA-GRG-1984-202577 KB

  • Other document

    Registration: RERA-GRG-2038-2025335 KB

  • Other document (2)

    Registration: RERA-GRG-2038-202545 KB

  • Other document (3)

    Registration: RERA-GRG-2038-20251.2 MB

  • Other document (4)

    Registration: RERA-GRG-2038-2025324 KB

  • Other document (5)

    Registration: RERA-GRG-2038-20251.4 MB

  • Other document (6)

    Registration: RERA-GRG-2038-20251.2 MB

  • Other document (7)

    Registration: RERA-GRG-2038-2025539 KB

  • Other document (8)

    Registration: RERA-GRG-2038-202595 KB

  • Other document (9)

    Registration: RERA-GRG-2038-202550 KB

  • Other document (10)

    Registration: RERA-GRG-2038-20251.3 MB

  • Other document (11)

    Registration: RERA-GRG-2038-20251.2 MB

  • Other document (12)

    Registration: RERA-GRG-2038-20251.2 MB

  • Other document (13)

    Registration: RERA-GRG-2038-20251.2 MB

  • Other document (14)

    Registration: RERA-GRG-2038-202572 KB

  • Other document (15)

    Registration: RERA-GRG-2038-2025468 KB

  • Other document (16)

    Registration: RERA-GRG-2038-20251.4 MB

  • Other document (17)

    Registration: RERA-GRG-2038-20251.3 MB

  • Other document (18)

    Registration: RERA-GRG-2038-2025590 KB

  • Other document (19)

    Registration: RERA-GRG-2038-20251.2 MB

  • Other document (20)

    Registration: RERA-GRG-2038-20251.2 MB

  • Other document (21)

    Registration: RERA-GRG-2038-20251.1 MB

  • Other document (22)

    Registration: RERA-GRG-2038-2025777 KB

  • Other document (23)

    Registration: RERA-GRG-2038-20251.5 MB

  • Other document (24)

    Registration: RERA-GRG-2038-20251.5 MB

  • Other document (25)

    Registration: RERA-GRG-2038-20251.2 MB

  • Other document (26)

    Registration: RERA-GRG-2038-20251.2 MB

  • Other document (27)

    Registration: RERA-GRG-2038-20251.9 MB

  • Other document (28)

    Registration: RERA-GRG-2038-20251.2 MB

  • Other document (29)

    Registration: RERA-GRG-2038-20251.2 MB

  • Other document (30)

    Registration: RERA-GRG-2038-2025123 KB

  • Other document (31)

    Registration: RERA-GRG-2038-2025364 KB

  • Other document (32)

    Registration: RERA-GRG-2038-2025743 KB

  • Other document (33)

    Registration: RERA-GRG-2038-2025229 KB

  • Other document (34)

    Registration: RERA-GRG-2038-2025932 KB

  • Other document (36)

    Registration: RERA-GRG-2038-2025150 KB

  • Other document (35)

    Registration: RERA-GRG-2038-20251.1 MB

  • Other document (37)

    Registration: RERA-GRG-2038-202546 KB

  • Other document (38)

    Registration: RERA-GRG-2038-20251.5 MB

  • Other document (39)

    Registration: RERA-GRG-2038-20251.4 MB

  • Other document (40)

    Registration: RERA-GRG-2038-20251.5 MB

  • Other document (41)

    Registration: RERA-GRG-2038-20251.3 MB

  • Other document (42)

    Registration: RERA-GRG-2038-20251.2 MB

  • Other document (43)

    Registration: RERA-GRG-2038-20251.2 MB

  • Other document (44)

    Registration: RERA-GRG-2038-20251.7 MB

  • Other document (45)

    Registration: RERA-GRG-2038-20251.2 MB

  • Other document (46)

    Registration: RERA-GRG-2038-20251.1 MB

  • Other document (2)

    Registration: RERA-GRG-2131-20251.9 MB

  • Other document

    Registration: RERA-GRG-2131-20254.0 MB

  • Other document (3)

    Registration: RERA-GRG-2131-20252 KB

  • Other document (4)

    Registration: RERA-GRG-2131-202594 KB

  • Other document (5)

    Registration: RERA-GRG-2131-20251.9 MB

  • Other document (7)

    Registration: RERA-GRG-2131-20251.9 MB

  • Other document (6)

    Registration: RERA-GRG-2131-20251.9 MB

  • Other document (9)

    Registration: RERA-GRG-2131-2025483 KB

  • Other document (8)

    Registration: RERA-GRG-2131-2025492 KB

  • Other document (10)

    Registration: RERA-GRG-2131-2025524 KB

  • Other document (11)

    Registration: RERA-GRG-2131-20251.9 MB

  • Other document (13)

    Registration: RERA-GRG-2131-202575 KB

  • Other document (12)

    Registration: RERA-GRG-2131-2025961 KB

  • Other document (14)

    Registration: RERA-GRG-2131-202571 KB

  • Other document (16)

    Registration: RERA-GRG-2131-202542 KB

  • Other document (15)

    Registration: RERA-GRG-2131-20252.0 MB

  • Other document (17)

    Registration: RERA-GRG-2131-2025684 KB

  • Other document (18)

    Registration: RERA-GRG-2131-2025675 KB

  • Other document (19)

    Registration: RERA-GRG-2131-202571 KB

  • Other document (20)

    Registration: RERA-GRG-2131-20251.9 MB

  • Other document (21)

    Registration: RERA-GRG-2131-20251.9 MB

  • Other document (22)

    Registration: RERA-GRG-2131-20252.0 MB

  • Other document (23)

    Registration: RERA-GRG-2131-20251.2 MB

  • Other document (24)

    Registration: RERA-GRG-2131-202550 KB

  • Other document (25)

    Registration: RERA-GRG-2131-2025208 KB

  • Other document (26)

    Registration: RERA-GRG-2131-20251.4 MB

  • Other document (27)

    Registration: RERA-GRG-2131-20251.9 MB

  • Other document (29)

    Registration: RERA-GRG-2131-2025777 KB

  • Other document (28)

    Registration: RERA-GRG-2131-20253.7 MB

  • Other document (30)

    Registration: RERA-GRG-2131-20252.0 MB

  • Other document (32)

    Registration: RERA-GRG-2131-2025603 KB

  • Other document (33)

    Registration: RERA-GRG-2131-20252.0 MB

  • Other document (31)

    Registration: RERA-GRG-2131-20251.8 MB

  • Other document (35)

    Registration: RERA-GRG-2131-202571 KB

  • Other document (37)

    Registration: RERA-GRG-2131-20251012 KB

  • Other document (34)

    Registration: RERA-GRG-2131-20254.8 MB

  • Other document (38)

    Registration: RERA-GRG-2131-2025539 KB

  • Other document (36)

    Registration: RERA-GRG-2131-20251.9 MB

  • Other document (39)

    Registration: RERA-GRG-2131-20251.8 MB

  • Other document (40)

    Registration: RERA-GRG-2131-2025287 KB

  • Other document (41)

    Registration: RERA-GRG-2131-20251.9 MB

  • Other document (42)

    Registration: RERA-GRG-2131-2025292 KB

  • Other document (43)

    Registration: RERA-GRG-2131-2025106 KB

  • Other document (44)

    Registration: RERA-GRG-2131-20252 KB

  • Brochure

    Registration: RERA-GRG-2131-20253.4 MB

  • Other document (45)

    Registration: RERA-GRG-2131-2025133 KB

  • Other document (47)

    Registration: RERA-GRG-2131-202539 KB

  • Other document (46)

    Registration: RERA-GRG-2131-20252.0 MB

Files are shown as captured in our registry snapshot. Always confirm the latest record on the official state portal before you transact.

Project record

Information available on record

A concise view of the details present in the records and published project material available to PropertyBaazi.

Available in the project record

On record

Only items present in the available record or published project material are shown.

  • RERA registered

    A state RERA registration is present in the project record.

  • Developer legal entity identified

    A legal entity is recorded for the developer.

Last checked 18 July 2026. These checks reflect the records available to PropertyBaazi. Confirm current details with the relevant authority or developer before booking.

About JMS Group The Majestic

For those looking to buy a residential property, here comes one of the choicest offerings in Gurgaon, at Harsaru. Brought to you by JMS Group, JMS Group The Majestic is among the newest addresses for homebuyers. There are apartments for sale in JMS Group The Majestic Harsaru, Gurgaon. This is a new launch project right now, and is expected to be delivered by Jun, 2028 . JMS Group The Majestic Gurgaon is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERAMore ↓

For those looking to buy a residential property, here comes one of the choicest offerings in Gurgaon, at Harsaru. Brought to you by JMS Group, JMS Group The Majestic is among the newest addresses for homebuyers. There are apartments for sale in JMS Group The Majestic Harsaru, Gurgaon. This is a new launch project right now, and is expected to be delivered by Jun, 2028 . JMS Group The Majestic Gurgaon is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERA registration number of this project is GGM/966/698/2025/69 DATED 03.07.2025. JMS Group is one of the known real estate brands in Gurgaon. Around 4 projects are upcoming. There are 2 projects of this builder, which are currently under-construction. Read on to know more about must-know features, JMS Group The Majestic Photos, Floor Plans, Payment Plans, Brochure download procedure and other exciting facts about the project.

Written by PropertyBaazi from our own research into this project.

PropertyBaazi research view

Strengths

  • RERA-registered under four separate certificates (GGM/966/698/2025/69, GGM/975/707/2025/78, GGM/988/720/2025/91, GGM/1033/765/2026/05)
  • Low-rise G+4 format with only 236 units offers lower density versus high-rise towers
  • NH-48 and Dwarka Expressway access provides road connectivity to Delhi and Gurugram
  • Pricing at ₹1.51-2.19 Cr is mid-tier and below prime Gurugram luxury benchmarks
  • Sector M9 Manesar may benefit from industrial corridor employment growth

Risks

  • Possession target of June 2028 is 3+ years away, exposing buyers to construction delays, cost overruns, and market cycle risk
  • Developer JMS Group’s residential delivery track record and past completed projects in Gurugram could not be independently verified from available public data; transparency is limited
  • RERA registration dates are very recent (July 2025-January 2026), indicating a freshly launched project with no visible construction heritage
  • Harsaru/Manesar is a peripheral, industrially dominated zone with weak social infrastructure—limited premium schools, hospitals, and retail within immediate radius
  • No genuine buyer reviews, forum discussions, or social media feedback found; only broker-generated marketing content is visible
  • Residential rental demand in Manesar is driven by industrial labour rather than IT/white-collar professionals, likely suppressing yields and increasing vacancy risk
  • Potential oversupply of builder floors and affordable luxury inventory along the Dwarka Expressway corridor
  • Nearby areas still retain rural/agricultural character (Chandu village census data), suggesting neighbourhood maturity will take years

Our read

Location:
Sector M9, Harsaru-Manesar is a transitional industrial-peripheral zone, not an established residential destination. Highway access via NH-48 and Dwarka Expressway is a plus, but daily commutes to Gurugram’s CBD or Delhi will remain 45-75 minutes. The immediate vicinity lacks top-tier schools, multi-specialty hospitals, and organised retail. Industrial activity generates employment but also brings heavy vehicle traffic and pollution concerns. It is a bet on future infrastructure rather than a liveable present.
Price:
At ₹8,400-8,900/sqft, the ask is competitive versus prime Gurugram but not inexpensive for Manesar’s current infrastructure deficit. Buyers are paying today’s price for 2028 delivery; the time-value of money and risk premium for a new developer launch in a peripheral area should be factored. Comparable ready or near-ready inventory in emerging sectors may offer better risk-adjusted value.
Buyer fit:
Suitable only for end-users employed in Manesar’s industrial belt or along NH-48 who specifically prefer low-rise living and can tolerate a 2028 possession timeline. Not appropriate for immediate occupancy, rental-yield investors (likely sub-3%), or buyers dependent on metro/public transport. Speculative investors should prefer markets with proven liquidity.

Market read

Price trend:
Average ₹8,452/sqft with 1.60% month-on-month growth per a listing portal (2025). New bookings listed at ₹8,950/sqft on a listing portal. Broader Manesar micro-market shows wide dispersion from ₹6,200/sqft to ₹10,100/sqft.
Rental yield:
Specific rental yield data for JMS The Majestic not found. Manesar is an industrial belt with limited white-collar residential tenant pool; estimated residential yield likely 2.5-3.5% but figures are unverified.
Demand:
No evidence of high sell-out or waitlist. Project is marketed through broker channels as low-rise luxury floors. Demand drivers cited are NH-48 and Dwarka Expressway connectivity.
Resale:
No active resale inventory or transaction data found for this project. With possession in 2028 and recent RERA registration, resale liquidity is effectively non-existent today.

In the news

  • JMS The Majestic on track for June 2028 possession with construction in progress

    Per builder update, the low-rise floor project spanning 1.43 acres with 236 units is under construction and targeting possession around 30-06-2028. 99acres, 2025

  • JMS The Majestic average rates at ₹8,452/sqft reflect modest 1.60% growth

    Price trend data shows average property rates at the project around ₹8,452 per sq ft, marking a 1.60% growth compared to past months. Magicbricks, 2025

Our verdict: CAUTIOUS. JMS The Majestic is a newly RERA-registered, low-rise project at a mid-tier price, but the combination of a 3-year construction horizon, unverified developer track record, peripheral location with limited social infrastructure, and absence of buyer feedback warrants material caution. The recent RERA dates (mid-2025 to early 2026) confirm this is a fresh launch with no visible execution history. Buyers should physically verify the site, demand escrow compliance, prefer construction-linked payment plans, and cross-shop with ready inventory in nearby sectors before committing.

This is PropertyBaazi’s own research opinion, compiled from 99acres.com, magicbricks.com, jmsgroup.co.in, projectsgurgaon.in, realoneassets.com, justplan.co.in, charitrarealty.com and geolysis.com. It is not investment advice — verify independently before you transact.

Top Facilities

20 facilities recorded for this project

  • Swimming Pool
  • Jogging Track
  • Badminton Court
  • Basketball Court
  • Yoga / Meditation Area
  • Indoor Games
  • Club House
  • Mini Theatre
  • Children's Play Area

Location Advantages

Key destinations around JMS Group The Majestic

Gurugram University

Connectivity · 5.3 Km

IGI Airport

Airport · 37.9 Km

National Highway 352W

Highway · 4.2 Km

Medicure Hospital

Hospital · 3.7 Km

Sapphire 90 Mall

Shopping Center/ Market/ Mall · 6.8 Km

Unni Krishnan Stadium

Stadium · 11.4 Km

View Official Brochure

Official brochure

JMS Group The Majestic

14 pages · 13.4 MB · PDF

Published by the builder; shown as filed.

Reading here is free. Downloading sends your enquiry to the seller so they can follow up.

Price list

Published by the builder; shown as filed. Downloading sends the same enquiry.

Market Snapshot for Harsaru

Computed from 1 Harsaru project in our catalogue (1 with a per-sqft price).

1 projects here, by price band

Premium
1

Society Reviews

Reviews by residents

No written reviews yet

Be the first to share a first-hand experience.

Locality overview

Explore life around JMS Group The Majestic

Understand daily conveniences and connectivity around the project before planning a visit.

View full locality insights
Distances and travel times are approximate. Confirm routes and access conditions before making a purchase decision.
FAQs

Frequently Asked Questions

When can I move into JMS Group The Majestic?

JMS Group The Majestic is still under construction, with possession expected around Jun, 2028.

Does JMS Group The Majestic have RERA approval?

Yes. JMS Group The Majestic is registered with HRERA-GGM under numbers GGM/966/698/2025/69 DATED 03.07.2025, GGM/975/707/2025/78 DATED 14.08.2025, GGM/988/720/2025/91 DATED 14.10.2025, GGM/1033/765/2026/05 DATED 15.01.2026, which you can verify on the official RERA portal.

What does a home at JMS Group The Majestic cost?

Homes at JMS Group The Majestic are priced ₹1.51 Cr - 2.19 Cr (about ₹8,947/sq.ft) for 3 BHK Apartment, sized 1,691–2,453 sq.ft super built-up area.

Whereabouts is JMS Group The Majestic, and what's the commute like?

JMS Group The Majestic is located in Harsaru, Gurugram.

What's the scale of JMS Group The Majestic?

JMS Group The Majestic is spread across 1.4 acres, up to 4 floors and 236 homes.

What amenities does JMS Group The Majestic offer?

JMS Group The Majestic comes with 20 amenities, including Swimming Pool, Club House, Mini Theatre, Children's Play Area, Landscape Garden and Banquet Hall.

What conveniences are near JMS Group The Majestic?

Close to JMS Group The Majestic you'll find hospitals such as Nidan Hospital and Trauma Centre and Rathore Imt Hospital.

Which builder is behind JMS Group The Majestic?

JMS Group The Majestic is being developed by JMS Group.

Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.