Skip to main content

Outdoors

Elevation

01/01

Marc Amrutkalash Phase 3

Outdoors · 1 of 1

Marc Amrutkalash Phase 3 — Elevation

Elevation

Marc Amrutkalash Phase 3

Chahurana Bk, Ahmednagar

RERA RegisteredFloor Plans Available+9 Top Facilities

Construction Status

Ready to move

Completed in Mar, 2023

Price on request

Price on request

2 BHK

Carpet Area

597.4 sqft

Price on Request

3 BHK

Carpet Area

778.55 sqft

Price on Request

Project Details

Project area
0.15 acres
Towers
1
Total units
17
Floors
4
Unit sizes
597.4–778.55 sqft · Carpet Area
Configurations
2, 3 BHK
Property type
Apartment
Possession
Since Mar, 2023
Specifications

FOUNDATION

As per the RCC consultant's recommendation

STRUCTURE RCC

frame building structure with slabs and lintels

WALLS

External wall in 150mm (6') thick brick masonry Internal walls in 100mm (4') brick masonry work in cement mortar

PLASTER

Nerru finished plaster internal wall and single coat sand finished plaster to external wall Ceiling with plain gypsum finish with oil bond distemper

FLOORING

600mm x600mm vitrified flooring to all rooms with same skirting 400mm x400mm antiskid tiles floor to all terraces All common lobbies and passages with 400mm x 400mm ceramic tiles
Stairway
Trade and riser of steps(stairway) with granite

KITCHEN

kitchen with trolley, L shaped with granite platform and SS sink Dado upto lintel level provision (2.10mheight) Provision for water purifier, dry balcony with washing place

COMMON BATH

Wash basin of standard make Hotcold mixer unit, concealed half turn and branded CP fittings, wall tiles having size (300 x 450mm) up to lintel level (2.1m height 7'), western commode

PLUMBING

Concealed piping with

CPVC / UPVC / SWR,

pipes wherever necessary

FITTING

All sanitary fittings of i.e. commode, wash basin and WC pan of bell ceramic company And all Jal CP fittings

DOORS

Plywood box frame with both side laminated flush doors with SS fitting Bed
Rooms
Plywood box frame with flush doors with SS fittings
Toilet doors
PVC syntax doors to toilets with granite frame

FINISHES

Internal
Plain gypsun finish ceiling with oil bond distemper
External
Single coat sandfaced cement plaster with acrylic paint
Hall
With decorative POP/Gypsum ceiling

ELECTRICAL

Concealed wiring with legrand/ GM equivalent modular switches, provision for inverter, 25 points with two power points for 1BHK and 30 points with two power points for 2BHK flat And 35 points with three power points for 3BHK flats

WINDOWS AND RAILING

Three track powder coated aluminum windows with mosquito net and projected MS safety grills for all windows, front side SS railing for terraces, granite

As stated by the builder; shown as filed.

RERA Registration

Phase registrations, completion timelines and available documents from the state RERA record.

  • Phase 1

    P52200017860

    Maharashtra RERA

    Registered on
    Not stated
    Completion by
    Not stated
    Registered
Registry referenceP52200017860

Registration-number match

Registration number found in MahaRERA

The project registration number matched the registry snapshot. Confirm the current status and filings on the live portal before booking.

Snapshot checked
21 Jul 2026
Check the official portal
Open MahaRERA portal ↗
Registry ID
P52200017860
Registry promoter
Madhumalti Costruction Pvt Ltd

Registry documents

Mirrored from MahaRERA

0 documents

No mirrored registry documents available

Document availability varies by state portal. Use the official RERA portal below for the latest filed records.

Floor Plans & Pricing

Available configurations, areas and recorded pricing.

2 BHK

1 layout

2 BHK Apartment

597.4 sq.ft.

Price on Request

3 BHK

1 layout

3 BHK Apartment

778.55 sq.ft.

Price on Request

Room dimensions

Room-by-room dimensions from each plan’s published schedule — shown exactly as filed, never estimated.

2 BHK Apartment · 597.4 sq.ft.6 rooms
RoomDimensions (as printed)Area
Living3.30 m × 4.76 m169 sqft
Kitchen2.55 m × 3.68 m101 sqft
Bedroom3.23 m × 2.78 m97 sqft
Bedroom3.71 m × 2.75 m110 sqft
Toilet2.35 m × 1.20 m30 sqft
Toilet2.55 m × 1.00 m27 sqft

Itemized rooms add up to 534 sqft · super area 597.4 sqft (walls, circulation and balconies are not itemized)

3 BHK Apartment · 778.55 sq.ft.9 rooms
RoomDimensions (as printed)Area
Living3.35 m × 5.40 m195 sqft
Kitchen4.40 m × 2.40 m114 sqft
Bedroom3.30 m × 2.86 m102 sqft
Bedroom2.75 m × 3.35 m99 sqft
Bedroom3.05 m × 3.00 m98 sqft
Toilet2.40 m × 1.25 m32 sqft
Toilet2.05 m × 1.20 m26 sqft
Passage2.45 m × 1.61 m42 sqft
Terrace3.35 m × 3.90 m141 sqft

Itemized rooms add up to 849 sqft · super area 778.55 sqft (walls, circulation and balconies are not itemized)

About Marc Amrutkalash Phase 3

Check out Marc Amrutkalash Phase 3 in Chahurana Bk, one of the upcoming under-construction housing societies in Ahmednagar. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Marc Construction, Marc Amrutkalash Phase 3 is scheduled for possession in Mar, 2023. This housing society has multiple property options to offer, in varied price range, making it one of the most suitable address to own, that too in your budget. Being a RERA-registered society, the project details and otherMore ↓

Check out Marc Amrutkalash Phase 3 in Chahurana Bk, one of the upcoming under-construction housing societies in Ahmednagar. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Marc Construction, Marc Amrutkalash Phase 3 is scheduled for possession in Mar, 2023. This housing society has multiple property options to offer, in varied price range, making it one of the most suitable address to own, that too in your budget. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The RERA registration number of this project is P52200017860. Marc Construction is one of the known real estate brands in Ahmednagar.The builder has delivered 4 projects so far. Around 2 projects are upcoming. There are 4 projects of this builder, which are currently under-construction. Here’s everything you need to know about the must-know features of this housing society along with Marc Amrutkalash Phase 3, Photos, Floor Plans, Payment Plans, Brochure download procedure and other exciting facts about your future home:

Top Facilities

9 facilities recorded for this project

  • Power Back up Lift
  • 24/7 Water Supply
  • Lift(s)
  • Car Parking
  • Gated Community
  • Solar Water Heating
  • Sewage Treatment Plant
  • Rain Water Harvesting
  • Paved Compound

Location Advantages

Key destinations around Marc Amrutkalash Phase 3

Matoshree Garden

Park · 0.1 km

Chintamani Hospital and Urology Center

Hospital · 0.3 km

Khandelwal Children Hospital

Hospital · 0.4 km

Nagar Urban Co-operative Bank Limited

Bank · 0.4 km

Globus Diagnostic Centre

Hospital · 0.5 km

Mahalaxmi Udyan

Park · 0.5 km

Market Snapshot for Chahurana Bk

Computed from 2 Chahurana Bk projects in our catalogue.

Government charges

Stamp duty — Male Ownership6%

Stamp duty — Female Ownership5%

Stamp duty — Joint Ownership5.5 %

Registration1% of transaction value or max up to Rs 30,000

As recorded for this state — confirm current rates at registration.

Society Reviews

Reviews by residents

No written reviews yet

Be the first to share a first-hand experience.

Locality overview

Explore life around Marc Amrutkalash Phase 3

Understand prices, daily conveniences and connectivity around the project before planning a visit.

View full locality insights
Distances and travel times are approximate. Confirm routes and access conditions before making a purchase decision.
Builder

About Marc Construction

View builder profile
Marc Construction logo

Marc Construction

9 projects on PropertyBaazi

Established in 1987, Marc Construction has been striding steadily towards creating a mammoth presence in the real estate industry. It is backed by a team of highly talented and experienced professionals who complete every project with the same attention to detail and enthusiasm. The company has gained fame in the real estate sector for serving the finest quality of service and its customers have always applauded it for upholding the highest health and safety standards during the construction of projects.

Projects by Marc Construction

FAQs

Frequently Asked Questions

What's the possession timeline at Marc Amrutkalash Phase 3?

Marc Amrutkalash Phase 3 is ready to move in, so you can take possession as soon as the paperwork is done.

Is Marc Amrutkalash Phase 3 a RERA-registered project?

Yes. Marc Amrutkalash Phase 3 is registered with MahaRERA under number P52200017860, which you can verify on the official RERA portal.

How much should I budget for Marc Amrutkalash Phase 3?

Marc Amrutkalash Phase 3 offers 2, 3 BHK Apartment, sized 597.4–778.55 sq.ft carpet area. Current pricing is shared on request — download the brochure from the project page for the latest price list.

Where is Marc Amrutkalash Phase 3 and how well-connected is it?

Marc Amrutkalash Phase 3 is located in Chahurana Bk, Ahmednagar.

How big is the Marc Amrutkalash Phase 3 project?

Marc Amrutkalash Phase 3 is spread across 0.2 acres, 1 tower, up to 4 floors and 17 homes.

What can residents enjoy at Marc Amrutkalash Phase 3?

Marc Amrutkalash Phase 3 comes with 9 amenities, including Solar Water Heating, Power Back up Lift, Sewage Treatment Plant, Rain Water Harvesting, Gated Community and 24/7 Water Supply.

What's around Marc Amrutkalash Phase 3 for daily needs?

Close to Marc Amrutkalash Phase 3 you'll find hospitals such as Chintamani Hospital and Urology Center and Khandelwal Children Hospital, schools like Joshi School Ground Ahmendgar. and Pirmary School Ground Ahmednagar. and banks.

Who is developing Marc Amrutkalash Phase 3?

Marc Amrutkalash Phase 3 is being developed by Marc Construction.

Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.