Skip to main content

Marc Utkarsha Phase 3

Chahurana Bk, Ahmednagar

RERA Registered+13 Top Facilities

Construction Status

Ready to move

Completed in Dec, 2023

Price on request

Price on request

Download Brochure

1 BHK

Carpet Area

365.87–451.44 sqft

Price on Request

2 BHK

Carpet Area

566.94–581.36 sqft

Price on Request

Project Details

Project area
0.32 acres
Towers
1
Total units
41
Floors
4
Unit sizes
365.87–581.36 sqft · Carpet Area
Configurations
1, 2 BHK
Property type
Apartment
Possession
Since Dec, 2023
Specifications

FOUNDATION

Foundation as per the R.C.C. consultants recommendation

STRUCTURE

R.C.C. frame building structure with slabs and lintels

WALLS

External wall in 150mm (6) thick brick masonry and internal walls in 100mm (4) brick masonry work in cement mortar

PLASTER

Neru finished plaster internal wall and single coat sand finished plaster to external wall Ceiling with plain gypsum finish with oil bond distemper

FLOORING

vitrified flooring to all rooms with same skirting All common lobbies and passages with 400mm x 400mm ceramic tiles

KITCHEN

Kitchen with trolley, L shaped with granite platform and S.S. sink having 10ft length including sink Dado upto lintel level provision Provision for water purifier, dry balcony with washing place, kitchen trolley

PLUMBING

Concealed piping with

CPVC / UPVC / SWR,

pipes wherever necessary

FITTINGS

All sanitary fittings like commode, wash basin and WC pan of bell ceramic company

DOORS

Plywood box frame with both side laminated flush doors with SS fitting

ELECTRICALS

Concealed wiring with legrand/ GM equivalent modular switches, provision for inverter, 25 points with two power points for 1BHK and 30 points with two power points for 2BHK flat 35 points with three power points for 3BHK flats

As stated by the builder; shown as filed.

RERA Registration

Phase registrations, completion timelines and available documents from the state RERA record.

  • Phase 1

    P52200019301

    Maharashtra RERA

    Registered on
    Not stated
    Completion by
    Not stated
    Registered
Registry referenceP52200019301

Registration-number match

Registration number found in MahaRERA

The project registration number matched the registry snapshot. Confirm the current status and filings on the live portal before booking.

Snapshot checked
21 Jul 2026
Check the official portal
Open MahaRERA portal ↗
Registry ID
P52200019301
Registry promoter
Makarand Madhav Kulkarni

Registry documents

Mirrored from MahaRERA

0 documents

No mirrored registry documents available

Document availability varies by state portal. Use the official RERA portal below for the latest filed records.

About Marc Utkarsha Phase 3

Marc Utkarsha Phase 3 in Chahurana Bk, Ahmednagar is a ready-to-move housing society. This project is a perfect combination of comfort and style, specifically designed to suit your requirements and conveniences. This housing society is now ready to be called home as families have started moving in. Check out some of the features of Marc Utkarsha Phase 3 housing society: * Marc Utkarsha Phase 3 Chahurana Bk has single tower, with 4 floors each and 41 units on offer. * Spread over an area of 0.32 acres, Marc Utkarsha Phase 3 is one of the spacious housingMore ↓

Marc Utkarsha Phase 3 in Chahurana Bk, Ahmednagar is a ready-to-move housing society. This project is a perfect combination of comfort and style, specifically designed to suit your requirements and conveniences. This housing society is now ready to be called home as families have started moving in. Check out some of the features of Marc Utkarsha Phase 3 housing society: * Marc Utkarsha Phase 3 Chahurana Bk has single tower, with 4 floors each and 41 units on offer. * Spread over an area of 0.32 acres, Marc Utkarsha Phase 3 is one of the spacious housing societies in the Ahmednagar region. With all the basic amenities available, Marc Utkarsha Phase 3 fits into your budget and your lifestyle. * Chahurana Bk has good connectivity to some of the important areas in the proximity such as Chintamani Hospital, Bharat Petroleum and Bank of Maharashtra ATM and so on.

Top Facilities

13 facilities recorded for this project

  • Children's Play Area
  • Power Back up Lift
  • 24/7 Power Backup
  • 24/7 Water Supply
  • Lift(s)
  • Car Parking
  • Gated Community
  • Internal Street Lights
  • Solar Water Heating

Location Advantages

Key destinations around Marc Utkarsha Phase 3

Chintamani Hospital

Hospital · 600 meters

Bharat Petroleum

Petrol Pump · 800 meters

Bank of Maharashtra ATM

ATM · 2.3 kms

Axis Bank

Bank · 2.3 kms

Jagdamba Shopping Mall

Shopping Center/ Market/ Mall · 3.2 kms

Athare Patil Public School

School · 4.8 kms

View Official Brochure

Official brochure

Marc Utkarsha Phase 3

4 pages · 7.1 MB · PDF

Published by the builder; shown as filed.

Reading here is free. Downloading sends your enquiry to the seller so they can follow up.

Market Snapshot for Chahurana Bk

Computed from 2 Chahurana Bk projects in our catalogue.

Government charges

Stamp duty — Male Ownership6%

Stamp duty — Female Ownership5%

Stamp duty — Joint Ownership5.5 %

Registration1% of transaction value or max up to Rs 30,000

As recorded for this state — confirm current rates at registration.

Society Reviews

Reviews by residents

No written reviews yet

Be the first to share a first-hand experience.

Locality overview

Explore life around Marc Utkarsha Phase 3

Understand prices, daily conveniences and connectivity around the project before planning a visit.

View full locality insights
Distances and travel times are approximate. Confirm routes and access conditions before making a purchase decision.
Builder

About Marc Construction

View builder profile
Marc Construction logo

Marc Construction

9 projects on PropertyBaazi

Established in 1987, Marc Construction has been striding steadily towards creating a mammoth presence in the real estate industry. It is backed by a team of highly talented and experienced professionals who complete every project with the same attention to detail and enthusiasm. The company has gained fame in the real estate sector for serving the finest quality of service and its customers have always applauded it for upholding the highest health and safety standards during the construction of projects.

Projects by Marc Construction

FAQs

Frequently Asked Questions

What's the possession timeline at Marc Utkarsha Phase 3?

Marc Utkarsha Phase 3 was completed in Dec, 2023 (per our records).

Does Marc Utkarsha Phase 3 have RERA approval?

Yes. Marc Utkarsha Phase 3 is registered with MahaRERA under number P52200019301, which you can verify on the official RERA portal.

What are prices and sizes like at Marc Utkarsha Phase 3?

Marc Utkarsha Phase 3 offers 1, 2 BHK Apartment, sized 365.87–581.36 sq.ft carpet area. Current pricing is shared on request — download the brochure from the project page for the latest price list.

Whereabouts is Marc Utkarsha Phase 3, and what's the commute like?

Marc Utkarsha Phase 3 is located in Chahurana Bk, Ahmednagar.

What's the scale of Marc Utkarsha Phase 3?

Marc Utkarsha Phase 3 is spread across 0.3 acres, 1 tower, up to 4 floors and 41 homes.

What amenities does Marc Utkarsha Phase 3 offer?

Marc Utkarsha Phase 3 comes with 13 amenities, including Solar Water Heating, Power Back up Lift, Sewage Treatment Plant, Rain Water Harvesting, 24/7 Power Backup and Gated Community.

What conveniences are near Marc Utkarsha Phase 3?

Close to Marc Utkarsha Phase 3 you'll find hospitals such as Khandelwal Children Hospital and Chintamani Hospital and Urology Center, schools like Joshi School Ground Ahmendgar. and Pirmary School Ground Ahmednagar. and banks.

Which builder is behind Marc Utkarsha Phase 3?

Marc Utkarsha Phase 3 is being developed by Marc Construction.

Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.