Skip to main content

Outdoors

Elevation

01/09

Northernsky Tranquillo

Outdoors · 1 of 9

Northernsky Tranquillo — Elevation

Elevation

Northernsky Tranquillo

Kodikal, Mangaluru

RERA Registered+14 Top Facilities

Construction Status

New launch

Possession will start from May, 2027

₹66.25 L - 1.18 Cr

Price range· ₹6,250/sqft

Download Brochure

2 BHK

Super Built-up Area

1060–1390 sqft

₹66.25 - 86.88 L

3 BHK

Super Built-up Area

1585–1820 sqft

₹1.03 - 1.18 Cr

Project Details

Project area
0.37 acres
Towers
1
Total units
56
Floors
14
Open area
32%
Unit sizes
1,060–1,820 sqft · Super Built-up Area
Price per sqft
₹6,250
Configurations
2, 3 BHK
Property type
Apartment
Possession
Completion in May, 2027
Specifications
Safety & Security Fire
Safety
Advanced Fire Safety System with fire sprinklers in parking areas and fire hydrants on each floor. Power
Backup
100% DG backup for all essential appliances and common areas, with auto changeover and acoustic canopy for silent operation. Utilities & Infrastructure
Lighting
LED Lighting across all common areas with centralised control for optimised energy efficiency. Parking
Floors
Finished with VDF, interlocking pavers or parking tiles, based on functional needs. Entry
Gate
Equipped with RFID/remote controlled boom barrier for secure vehicle access.
Transformer
Of adequate load capacity. Electrical
Provisions
For balconies, landscape, clubhouse, yard, parking, and facade load capacity. Water
Supply
Borewell and MCC water supply with underground sump tank. Doors & Windows
Doors
Premium main and internal flush doors with veneer finish and biometric locks.
Windows
Aluminium sliding French doors and mosquito mesh window provisions. Flooring & Finishes Main
Flooring
Premium vitrified tiles (Simpolo or equivalent). Bathroom Wall
Tiles
Premium vitrified tiles (Simpolo or equivalent). Balcony
Tiles
Premium vitrified tiles (Simpolo or equivalent). Interior
Finishes
Premium emulsion paint over smooth putty-finished walls and ceilings. Electrical & Communication
Switches
Modular Electrical Switches throughout the apartment. Power Load
Allocation
2
BHK
4 KW (Single Phase), 3
BHK
5 KW (Single Phase). Computer
Point
6A switch & socket with telephone port. TV
Point
With DTH/cable readiness. Bedrooms TV points in the Master bedroom. 6A switch and socket provision near the bedside in all bedrooms. Split A/C provision with drain points in all bedrooms. Two-way light control wherever applicable. Kitchen & Utility
Kitchen
3 nos. 16A and 3 nos. 6A sockets.
Utility
1 no. 16A socket. Plumbing & Power Point for a washing machine. Building Infrastructure
Masonry
Laterite/Concrete solid block. External
Plaster
Double coat with waterproof t

As stated by the builder; shown as filed.

RERA Registration

Phase registrations, completion timelines and available documents from the state RERA record.

  • Phase 1

    PRM/KA/RERA/1257/334/PR/260925/008122

    Karnataka RERA

    Registered on
    Not stated
    Completion by
    Not stated
    Registered
Registry referencePRM/KA/RERA/1257/334/PR/260925/008122

Registration-number match

Registration number found in K-RERA

The project registration number matched the registry snapshot. Confirm the current status and filings on the live portal before booking.

Snapshot checked
21 Jul 2026
Check the official portal
Open K-RERA portal ↗
Registry ID
PRM/KA/RERA/1257/334/PR/260925/008122
Registry promoter
M/S. JV BUILDERS

Registry documents

Mirrored from K-RERA

29 documents

Requesting a download sends your enquiry to the seller. Once sent, other documents for this project stay unlocked for this browser session.

  • Registration certificate

    Registration: PRM/KA/RERA/1257/334/PR/260925/0081221.3 MB

  • Commencement certificate

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122611 KB

  • Completion certificate

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122220 KB

  • Completion certificate (2)

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122965 KB

  • Approved building plan

    Registration: PRM/KA/RERA/1257/334/PR/260925/00812214.2 MB

  • Sectional drawing

    Registration: PRM/KA/RERA/1257/334/PR/260925/0081222.2 MB

NOCs13
  • NOC — Escom Electricity

    Registration: PRM/KA/RERA/1257/334/PR/260925/0081221.1 MB

  • NOC — Kwssb Water

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122637 KB

  • NOC — Kspcb

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122993 KB

  • NOC — Seiaa

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122188 KB

  • NOC — Fire Force Department

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122276 KB

  • NOC — Airport Authority Of India

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122184 KB

  • NOC — Bsnl

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122183 KB

  • NOC — Lift Authorities

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122183 KB

  • NOC — Bmrcl

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122182 KB

  • NOC — Noc In Case Of Building Proposals Abutting To Neighbouring P

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122182 KB

  • NOC — Bangalore Urban Arts Commission

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122175 KB

  • NOC — Inspector Of Factories Controller Of Explosives Railways

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122175 KB

  • NOC — Coastal Regulation Zone Authority

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122175 KB

Progress & status reports9
  • Quarterly progress report

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122987 KB

  • Quarterly progress report (2)

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122153 KB

  • Quarterly progress report (3)

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122162 KB

  • Quarterly progress report (4)

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122924 KB

  • Quarterly progress report (5)

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122154 KB

  • Quarterly progress report (6)

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122164 KB

  • Quarterly progress report (7)

    Registration: PRM/KA/RERA/1257/334/PR/260925/0081224.1 MB

  • Quarterly progress report (8)

    Registration: PRM/KA/RERA/1257/334/PR/260925/0081221.4 MB

  • Quarterly progress report (9)

    Registration: PRM/KA/RERA/1257/334/PR/260925/008122153 KB

Other registry documents1
  • Brochure

    Registration: PRM/KA/RERA/1257/334/PR/260925/0081221005 KB

Files are shown as captured in our registry snapshot. Always confirm the latest record on the official state portal before you transact.

About Northernsky Tranquillo

For those looking to buy a residential property, here comes one of the choicest offerings in Mangalore, at Kodikal. Brought to you by NorthernSky Properties, Northernsky Tranquillo is among the newest addresses for homebuyers. There are apartments for sale in Northernsky Tranquillo Kodikal, Mangalore. This is a new launch project right now, and is expected to be delivered by May, 2027 . Northernsky Tranquillo Mangalore is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users andMore ↓

For those looking to buy a residential property, here comes one of the choicest offerings in Mangalore, at Kodikal. Brought to you by NorthernSky Properties, Northernsky Tranquillo is among the newest addresses for homebuyers. There are apartments for sale in Northernsky Tranquillo Kodikal, Mangalore. This is a new launch project right now, and is expected to be delivered by May, 2027 . Northernsky Tranquillo Mangalore is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERA registration number of this project is PRM/KA/RERA/1257/334/PR/260925/008122. NorthernSky Properties is one of the known real estate brands in Mangalore.The builder has delivered 9 projects so far. Around 1 project is upcoming. There are 4 projects of this builder, which are currently under-construction. Read on to know more about must-know features, Northernsky Tranquillo Photos, Floor Plans, Payment Plans, Brochure download procedure and other exciting facts about the project.

Top Facilities

14 facilities recorded for this project

  • Gymnasium
  • Yoga / Meditation Area
  • Indoor Games
  • Chess
  • Carrom
  • Foosball
  • Car Parking
  • Waiting Lounge
  • Entrance Lobby

Location Advantages

Key destinations around Northernsky Tranquillo

Podar International School

School · 4.1 Km

Yenepoya University

University · 3.3 Km

AJ Hospital

Hospital · 4.6 Km

Empire Mall

Shopping Center/ Market/ Mall · 3.4 Km

Mangalore International Airport

Airport · 10.9 Km

Mangaluru Railway Station

Railway Station · 10.8 Km

View Official Brochure

Official brochure

Northernsky Tranquillo

12 pages · 1.6 MB · PDF

Published by the builder; shown as filed.

Reading here is free. Downloading sends your enquiry to the seller so they can follow up.

Price list

Published by the builder; shown as filed. Downloading sends the same enquiry.

Market Snapshot for Kodikal

Computed from 2 Kodikal projects in our catalogue (1 with a per-sqft price).

2 projects here, by price band

Affordable
2

Society Reviews

Reviews by residents

No written reviews yet

Be the first to share a first-hand experience.

Locality overview

Explore life around Northernsky Tranquillo

Understand daily conveniences and connectivity around the project before planning a visit.

View full locality insights
Distances and travel times are approximate. Confirm routes and access conditions before making a purchase decision.
Builder

About NorthernSky Properties

View builder profile
NorthernSky Properties logo

NorthernSky Properties

9 projects on PropertyBaazi

NorthernSky Properties offers high-quality housing and commercial spaces in prime locations in Mangalore. They have completed 9 housing projects and have 7 ongoing projects, with 6 more coming up. Previously known as JV Builders, the group focuses on eco-friendly and quality homes in Karnataka. Led by Mr. Dheeraj Amin, the company has a rich history dating back to 1932. They are known for their commitment to excellence and innovation. NorthernSky Properties is dedicated to turning your dream home into a reality with the best apartments in Mangalore.

Projects by NorthernSky Properties

FAQs

Frequently Asked Questions

When can I move into Northernsky Tranquillo?

Northernsky Tranquillo is still under construction, with possession expected around May, 2027.

Does Northernsky Tranquillo have RERA approval?

Yes. Northernsky Tranquillo is registered with K-RERA under number PRM/KA/RERA/1257/334/PR/260925/008122, which you can verify on the official RERA portal.

What does a home at Northernsky Tranquillo cost?

Homes at Northernsky Tranquillo are priced ₹66.25 L - 1.18 Cr (about ₹6,250/sq.ft) for 2, 3 BHK Apartment, sized 1,060–1,820 sq.ft super built-up area.

Whereabouts is Northernsky Tranquillo, and what's the commute like?

Northernsky Tranquillo is located in Kodikal, Mangaluru.

What's the scale of Northernsky Tranquillo?

Northernsky Tranquillo is spread across 0.4 acres, 1 tower, up to 14 floors and 56 homes.

What amenities does Northernsky Tranquillo offer?

Northernsky Tranquillo comes with 14 amenities, including Gymnasium, Landscape Garden, Yoga / Meditation Area, Indoor Games, Carrom and Chess.

What conveniences are near Northernsky Tranquillo?

Close to Northernsky Tranquillo you'll find hospitals such as Karnakaka Ayurveda Medical College Hospital and Exservice Mens Hospital Service.. E C H S, schools like Government School, Kottara and St. Aloysius English Medium School.

Which builder is behind Northernsky Tranquillo?

Northernsky Tranquillo is being developed by NorthernSky Properties.

Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.