Skip to main content

Outdoors

Aerial View

01/19

Suvrith Shelter

Outdoors · 1 of 19

Suvrith Shelter — Aerial View

Aerial View

Suvrith Shelter

Electronic City Phase 2, Bengaluru

RERA Registered+20 Top Facilities

Construction Status

Under construction

Possession will start from Sep, 2026

Price on request

Price on request

Download Brochure

3 BHK

Area

Price on Request

Project Details

Project area
1.5 acres
Towers
3
Total units
124
Floors
4
Open area
40%
Configurations
3 BHK
Property type
Apartment
Possession
Completion in Sep, 2026
Specifications
1.

STRUCTURE RCC

framed Structure 2.

WALLS

6" Thick Cement solid block for exterior walls & 4" thick cement solid block for interior walls.

FLOORING

Premium quality Vitrified tiles for flooring and anti-skid tiles for balcony & Utility 3.

PAINTING

Internal walls smoothly plastered with primer lime rendering & painted with emulsion paint and external walls with primer and ACE paint 4.

DOORS

Main door teak wood frame with BST doors & Internal doors of Sal wood frame with flush doors. 5. WINDOW/SLIDING

DOORS

Three track & two track

UPVC

windows with safety grills 6.

ELECTRICAL

GM/Anchor/Roma or equivalent Provision for AC points in Master Bed Room 7.

TOILETS

Ceramic tile flooring & Glaze tiles dado Upto 8 feet height 8.

SANITARY

Jaguar/Equivalent CP fittings and Hindware/

CERA

sanitary 9.

KITCHEN

Granite Platform with stainless sink 10.

POWER BACKUP

Generator for common area, lifts and lighting points up to power backup of 1KW for each flat 11.

COMMON AREA

Granite for common area 12. T.V. &

TELEPHONE TV

& Telephone point in Living & Master Bedroom 13.

CAR PARKING

Exclusive covered car parking with EV Charging Point 14.

LIFT

15 passenger Fujitech 3 Lifts 15.

WATER SUPPLY

Water supply from Borewell

As stated by the builder; shown as filed.

RERA Registration

Phase registrations, completion timelines and available documents from the state RERA record.

  • Phase 1

    PRM/KA/RERA/1251/310/PR/151124/007230

    Karnataka RERA

    Registered on
    Not stated
    Completion by
    Not stated
    Registered
Registry referencePRM/KA/RERA/1251/310/PR/151124/007230

Registration-number match

Registration number found in K-RERA

The project registration number matched the registry snapshot. Confirm the current status and filings on the live portal before booking.

Snapshot checked
21 Jul 2026
Check the official portal
Open K-RERA portal ↗
Registry ID
PRM/KA/RERA/1251/310/PR/151124/007230
Registry promoter
SUVRITH STRUCTURES

Registry documents

Mirrored from K-RERA

20 documents

Requesting a download sends your enquiry to the seller. Once sent, other documents for this project stay unlocked for this browser session.

  • Registration certificate

    Registration: PRM/KA/RERA/1251/310/PR/151124/0072301.3 MB

  • Commencement certificate

    Registration: PRM/KA/RERA/1251/310/PR/151124/007230185 KB

  • Completion certificate

    Registration: PRM/KA/RERA/1251/310/PR/151124/007230402 KB

  • Approved layout plan

    Registration: PRM/KA/RERA/1251/310/PR/151124/007230195 KB

  • Approved layout plan (2)

    Registration: PRM/KA/RERA/1251/310/PR/151124/007230195 KB

  • Sectional drawing

    Registration: PRM/KA/RERA/1251/310/PR/151124/0072307.1 MB

Plans & drawings1
  • Area development plan

    Registration: PRM/KA/RERA/1251/310/PR/151124/0072307.1 MB

NOCs3
  • NOC — Escom Electricity

    Registration: PRM/KA/RERA/1251/310/PR/151124/0072301.5 MB

  • NOC — Kwssb Water

    Registration: PRM/KA/RERA/1251/310/PR/151124/007230505 KB

  • NOC — Kspcb

    Registration: PRM/KA/RERA/1251/310/PR/151124/0072301.9 MB

Progress & status reports9
  • Quarterly progress report

    Registration: PRM/KA/RERA/1251/310/PR/151124/0072303.4 MB

  • Quarterly progress report (2)

    Registration: PRM/KA/RERA/1251/310/PR/151124/0072303.5 MB

  • Quarterly progress report (3)

    Registration: PRM/KA/RERA/1251/310/PR/151124/0072303.1 MB

  • Quarterly progress report (4)

    Registration: PRM/KA/RERA/1251/310/PR/151124/0072304.0 MB

  • Quarterly progress report (5)

    Registration: PRM/KA/RERA/1251/310/PR/151124/0072301.7 MB

  • Quarterly progress report (6)

    Registration: PRM/KA/RERA/1251/310/PR/151124/0072301.5 MB

  • Quarterly progress report (7)

    Registration: PRM/KA/RERA/1251/310/PR/151124/0072304.1 MB

  • Quarterly progress report (8)

    Registration: PRM/KA/RERA/1251/310/PR/151124/0072301.6 MB

  • Quarterly progress report (9)

    Registration: PRM/KA/RERA/1251/310/PR/151124/0072301.3 MB

Other registry documents1
  • Brochure

    Registration: PRM/KA/RERA/1251/310/PR/151124/007230184 KB

Files are shown as captured in our registry snapshot. Always confirm the latest record on the official state portal before you transact.

About Suvrith Shelter

Check out Suvrith Shelter in Electronic City Phase 2, Bangalore, one of the upcoming under-construction housing societies in Bangalore South. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Suvrith Structures, Suvrith Shelter is scheduled for possession in Sep, 2026. This housing society has multiple property options to offer, in varied price range, making it one of the most suitable address to own, that too in your budget. Being a RERA-registered society, the project details andMore ↓

Check out Suvrith Shelter in Electronic City Phase 2, Bangalore, one of the upcoming under-construction housing societies in Bangalore South. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Suvrith Structures, Suvrith Shelter is scheduled for possession in Sep, 2026. This housing society has multiple property options to offer, in varied price range, making it one of the most suitable address to own, that too in your budget. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The RERA registration number of this project is PRM/KA/RERA/1251/310/PR/151124/007230. Suvrith Structures is one of the known real estate brands in Bangalore South.The builder has delivered 1 project so far. There is 1 project of this builder, which is currently under-construction. Here’s everything you need to know about the must-know features of this housing society along with Suvrith Shelter, Photos, Floor Plans, Payment Plans, Brochure download procedure and other exciting facts about your future home:

Top Facilities

20 facilities recorded for this project

  • Swimming Pool
  • Gymnasium
  • Jogging Track
  • Indoor Games
  • Children's Play Area
  • Multipurpose Hall
  • Senior Citizen Sitout
  • Pergola
  • Car Parking

Location Advantages

Key destinations around Suvrith Shelter

St. Philomena Convent School

School · 1.1 Km

Semicon Park IT Park

Office complex · 1.6 Km

Sacred Oak Hospital

Hospital · 1.9 Km

M5 Ecity Mall

Shopping Center/ Market/ Mall · 2.1 Km

National Highway 44

Highway · 2.5 Km

Infosys Foundation Metro Station

Metro Station · 2.8 Km

View Official Brochure

Official brochure

Suvrith Shelter

15 pages · 22.1 MB · PDF

Published by the builder; shown as filed.

Reading here is free. Downloading sends your enquiry to the seller so they can follow up.

Price list

Published by the builder; shown as filed. Downloading sends the same enquiry.

Market Snapshot for Electronic City Phase 2

Computed from 37 Electronic City Phase 2 projects in our catalogue (21 with a per-sqft price).

37 projects here, by price band

Budget
5
Affordable
11
Premium
5

Society Reviews

Reviews by residents

No written reviews yet

Be the first to share a first-hand experience.

Locality overview

Explore life around Suvrith Shelter

Understand daily conveniences and connectivity around the project before planning a visit.

View full locality insights
37
Projects listed
2, 3 BHK
Popular configurations
Ready to move
Most common status

Based on 37 projects listed in Electronic City Phase 2 on PropertyBaazi — our catalog, not a market index.

Distances and travel times are approximate. Confirm routes and access conditions before making a purchase decision.
Builder

About Suvrith Structures

View builder profile
Suvrith Structures logo

Suvrith Structures

2 projects on PropertyBaazi

Suvrith Structures is one of the leading real estate company in the industry which has successfully completed many residential projects.

Projects by Suvrith Structures

FAQs

Frequently Asked Questions

When can I move into Suvrith Shelter?

Suvrith Shelter is still under construction, with possession expected around Sep, 2026.

Does Suvrith Shelter have RERA approval?

Yes. Suvrith Shelter is registered with K-RERA under number PRM/KA/RERA/1251/310/PR/151124/007230, which you can verify on the official RERA portal.

What does a home at Suvrith Shelter cost?

Suvrith Shelter offers 3 BHK Apartment. Current pricing is shared on request — download the brochure from the project page for the latest price list.

Whereabouts is Suvrith Shelter, and what's the commute like?

Suvrith Shelter is located in Electronic City Phase 2, Bengaluru.

What's the scale of Suvrith Shelter?

Suvrith Shelter is spread across 1.5 acres, 3 towers, up to 4 floors and 124 homes.

What amenities does Suvrith Shelter offer?

Suvrith Shelter comes with 20 amenities, including Swimming Pool, Gymnasium, Children's Play Area, Landscape Garden, Jogging Track and Multipurpose Hall.

What conveniences are near Suvrith Shelter?

Close to Suvrith Shelter you'll find hospitals such as Apollo Clinic and Anugrahaa Hospital, schools like St Gasper School and GHPS Govindashetty Palya.

Which builder is behind Suvrith Shelter?

Suvrith Shelter is being developed by Suvrith Structures.

Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.