Skip to main content

Outdoors

Elevation

01/10

Total Environment In That Quiet Earth

Outdoors · 1 of 10

Total Environment In That Quiet Earth — Elevation

Elevation

Total Environment In That Quiet Earth

Hennur Road, Bengaluru

RERA RegisteredFloor Plans Available+34 Top Facilities

Construction Status

Under construction

Possession will start from Sep, 2026

₹1.9 Cr - 6.5 Cr

Price range· ₹18,269/sqft

2 BHK

Built-up Area

1100–1431 sqft

₹1.9 - 2.42 Cr

3 BHK

Carpet Area

1040–2890 sqft

₹2.85 - 5.6 Cr

4 BHK

Super Built-up Area

2200–4957 sqft

₹3.8 - 6.5 Cr

Project Details

Project area
37 acres
Towers
5
Total units
1,235
Floors
26
Open area
92%
Unit sizes
1,040–2,890 sqft · Carpet Area
Price per sqft
₹18,269
Configurations
2, 3, 4 BHK
Property type
Apartment
Possession
Completion from Sep, 2026 onwards
Specifications

STRUCTURE:

Shell RCC frame structure with a height of 9'6" from slab top to slab top, except in the case of sloped or curved roofs. Masonry High quality exposed brick masonry using specially procured highstrength terracotta wirecut bricks and / or stone masonry for parts of the exterior with deepset waterproof pointing. All other masonry in terracotta blocks, table molded brick, Aerocon blocks or Concrete blocks with plaster

FLOORING

and

DADO:

Living and Dining Kota stone laid with paper joints and finished with 8 coats polish Imported marble laid with paper joints and finished with 8 coats polish Kitchen Green marble flooring and Counter with glass or glazed tile dado above the counter up to a height of 2' Imported marble laid with paper joint and finished with 8 coats polish on the floor. Marble/granite counter with glass or glazed tile dado above the counter up to a height of 2' Utility / Laundry Green marble flooring. No dado or counter Master Bedroom Kota stone laid with paper joints and finished with 8 coats polish Hardwood flooring Master Bathroom Indian marble on the floor and counter, Marazzi or equivalent tile / glass dado on the walls up to 7' in shower area Imported marble floor and counter, Marazzi or equivalent tile / glass dado on the walls up to 7' in shower area Children's Bedroom Kota stone laid with paper joints and finished with 8 coats polish Children's Bathroom Indian Marble counter. Marazzi or equivalent tiles on the floor and walls up to 7' in shower area Imported marble floor and counter, Marazzi or equivalent tile / glass dado on the walls up to 7' in shower area Guest Bedroom (U20) Kota stone laid with paper joints and finished with 8 coats polish Guest Bathroom (U20) Indian Marble counter. Marazzi or equivalent tiles on the floor and walls upto 7' in shower area Imported marble floor and counter, Marazzi or equivalent tile / glass dado on the walls upto 7' in shower area

SANITARY

and

PLUMBING:

Water Closets Western style, porcelain EWC of

As stated by the builder; shown as filed.

RERA Registration

Phase registrations, completion timelines and available documents from the state RERA record.

  • Phase 2

    PRM/KA/RERA/1251/446/PR/180519/001745

    Karnataka RERA

    Registered on
    Not stated
    Completion by
    Not stated
    Registered
  • Phase 1

    PRM/KA/RERA/1251/446/PR/201001/003630

    Karnataka RERA

    Registered on
    Not stated
    Completion by
    Not stated
    Registered
  • Phase 3

    PRM/KA/RERA/1251/446/PR/060722/005044

    Karnataka RERA

    Registered on
    Not stated
    Completion by
    Not stated
    Registered
  • Phase 4

    PRM/KA/RERA/1251/446/PR/060424/006780

    Karnataka RERA

    Registered on
    Not stated
    Completion by
    Not stated
    Registered
Registry referencesPRM/KA/RERA/1251/446/PR/060424/006780PRM/KA/RERA/1251/446/PR/060722/005044PRM/KA/RERA/1251/446/PR/180519/001745PRM/KA/RERA/1251/446/PR/201001/003630

Registration-number match

Registration number found in K-RERA

The project registration number matched the registry snapshot. Confirm the current status and filings on the live portal before booking.

Snapshot checked
21 Jul 2026
Check the official portal
Open K-RERA portal ↗
Registry ID
PRM/KA/RERA/1251/446/PR/180519/001745
Registry promoter
Total Environment Constructions Private Limited

Registry documents

Mirrored from K-RERA

91 documents

Requesting a download sends your enquiry to the seller. Once sent, other documents for this project stay unlocked for this browser session.

  • Registration certificate

    Registration: PRM/KA/RERA/1251/446/PR/180519/0017451018 KB

  • Registration certificate

    Registration: PRM/KA/RERA/1251/446/PR/201001/0036301018 KB

  • Registration certificate

    Registration: PRM/KA/RERA/1251/446/PR/060722/0050441016 KB

  • Registration certificate

    Registration: PRM/KA/RERA/1251/446/PR/060424/0067801.3 MB

  • Commencement certificate

    Registration: PRM/KA/RERA/1251/446/PR/180519/001745669 KB

  • Commencement certificate (2)

    Registration: PRM/KA/RERA/1251/446/PR/180519/001745604 KB

Certificates & approvals5
  • Commencement certificate (3)

    Registration: PRM/KA/RERA/1251/446/PR/180519/001745466 KB

  • Commencement certificate

    Registration: PRM/KA/RERA/1251/446/PR/201001/003630612 KB

  • Commencement certificate

    Registration: PRM/KA/RERA/1251/446/PR/060722/005044109 KB

  • Commencement certificate

    Registration: PRM/KA/RERA/1251/446/PR/060424/0067806.4 MB

  • Completion certificate

    Registration: PRM/KA/RERA/1251/446/PR/060722/005044445 KB

Plans & drawings17
  • Approved building plan

    Registration: PRM/KA/RERA/1251/446/PR/060424/0067801.2 MB

  • Approved layout plan

    Registration: PRM/KA/RERA/1251/446/PR/180519/00174511.7 MB

  • Approved layout plan (2)

    Registration: PRM/KA/RERA/1251/446/PR/180519/0017455.2 MB

  • Approved layout plan

    Registration: PRM/KA/RERA/1251/446/PR/201001/00363019.7 MB

  • Approved layout plan (2)

    Registration: PRM/KA/RERA/1251/446/PR/201001/00363019.7 MB

  • Approved layout plan

    Registration: PRM/KA/RERA/1251/446/PR/060722/00504414.1 MB

  • Approved layout plan (2)

    Registration: PRM/KA/RERA/1251/446/PR/060722/00504414.1 MB

  • Approved layout plan

    Registration: PRM/KA/RERA/1251/446/PR/060424/006780146 KB

  • Approved layout plan (2)

    Registration: PRM/KA/RERA/1251/446/PR/060424/006780146 KB

  • Area development plan

    Registration: PRM/KA/RERA/1251/446/PR/180519/0017451.6 MB

  • Sectional drawing

    Registration: PRM/KA/RERA/1251/446/PR/180519/0017459.3 MB

  • Area development plan

    Registration: PRM/KA/RERA/1251/446/PR/201001/0036304.3 MB

  • Sectional drawing

    Registration: PRM/KA/RERA/1251/446/PR/201001/00363016.6 MB

  • Sectional drawing

    Registration: PRM/KA/RERA/1251/446/PR/060722/005044564 KB

  • Area development plan

    Registration: PRM/KA/RERA/1251/446/PR/060722/005044143 KB

  • Sectional drawing

    Registration: PRM/KA/RERA/1251/446/PR/060424/0067806.4 MB

  • Area development plan

    Registration: PRM/KA/RERA/1251/446/PR/060424/006780143 KB

Land, title & agreements3
  • Encumbrance certificate

    Registration: PRM/KA/RERA/1251/446/PR/180519/0017452.6 MB

  • Encumbrance certificate

    Registration: PRM/KA/RERA/1251/446/PR/201001/003630425 KB

  • Encumbrance certificate (2)

    Registration: PRM/KA/RERA/1251/446/PR/201001/0036302.1 MB

NOCs18
  • NOC — Document (1)

    Registration: PRM/KA/RERA/1251/446/PR/180519/001745348 KB

  • NOC — Document (2)

    Registration: PRM/KA/RERA/1251/446/PR/180519/001745385 KB

  • NOC — Document (3)

    Registration: PRM/KA/RERA/1251/446/PR/180519/001745527 KB

  • NOC — Document (4)

    Registration: PRM/KA/RERA/1251/446/PR/180519/001745930 KB

  • NOC — Document (5)

    Registration: PRM/KA/RERA/1251/446/PR/180519/001745515 KB

  • NOC — Document (6)

    Registration: PRM/KA/RERA/1251/446/PR/180519/001745759 KB

  • NOC — Document (7)

    Registration: PRM/KA/RERA/1251/446/PR/180519/001745557 KB

  • NOC — Escom Electricity

    Registration: PRM/KA/RERA/1251/446/PR/060722/005044566 KB

  • NOC — Kwssb Water

    Registration: PRM/KA/RERA/1251/446/PR/060722/005044893 KB

  • NOC — Fire Force Department

    Registration: PRM/KA/RERA/1251/446/PR/060722/005044296 KB

  • NOC — Airport Authority Of India

    Registration: PRM/KA/RERA/1251/446/PR/060722/005044385 KB

  • NOC — Kspcb

    Registration: PRM/KA/RERA/1251/446/PR/060722/005044561 KB

  • NOC — Bsnl

    Registration: PRM/KA/RERA/1251/446/PR/060722/005044302 KB

  • NOC — Escom Electricity

    Registration: PRM/KA/RERA/1251/446/PR/060424/006780389 KB

  • NOC — Kwssb Water

    Registration: PRM/KA/RERA/1251/446/PR/060424/0067801.1 MB

  • NOC — Fire Force Department

    Registration: PRM/KA/RERA/1251/446/PR/060424/006780348 KB

  • NOC — Airport Authority Of India

    Registration: PRM/KA/RERA/1251/446/PR/060424/006780280 KB

  • NOC — Seiaa

    Registration: PRM/KA/RERA/1251/446/PR/060424/0067804.6 MB

Progress & status reports36
  • Quarterly progress report

    Registration: PRM/KA/RERA/1251/446/PR/180519/0017451.6 MB

  • Quarterly progress report (2)

    Registration: PRM/KA/RERA/1251/446/PR/180519/001745265 KB

  • Quarterly progress report (3)

    Registration: PRM/KA/RERA/1251/446/PR/180519/0017452.4 MB

  • Quarterly progress report (4)

    Registration: PRM/KA/RERA/1251/446/PR/180519/0017452.2 MB

  • Quarterly progress report (5)

    Registration: PRM/KA/RERA/1251/446/PR/180519/001745287 KB

  • Quarterly progress report (6)

    Registration: PRM/KA/RERA/1251/446/PR/180519/0017452.4 MB

  • Quarterly progress report (7)

    Registration: PRM/KA/RERA/1251/446/PR/180519/0017452.7 MB

  • Quarterly progress report (8)

    Registration: PRM/KA/RERA/1251/446/PR/180519/001745293 KB

  • Quarterly progress report (9)

    Registration: PRM/KA/RERA/1251/446/PR/180519/0017452.4 MB

  • Quarterly progress report

    Registration: PRM/KA/RERA/1251/446/PR/201001/0036301.8 MB

  • Quarterly progress report (2)

    Registration: PRM/KA/RERA/1251/446/PR/201001/003630405 KB

  • Quarterly progress report (3)

    Registration: PRM/KA/RERA/1251/446/PR/201001/0036301.9 MB

  • Quarterly progress report (4)

    Registration: PRM/KA/RERA/1251/446/PR/201001/0036302.2 MB

  • Quarterly progress report (5)

    Registration: PRM/KA/RERA/1251/446/PR/201001/003630184 KB

  • Quarterly progress report (6)

    Registration: PRM/KA/RERA/1251/446/PR/201001/0036301.9 MB

  • Quarterly progress report (7)

    Registration: PRM/KA/RERA/1251/446/PR/201001/0036302.7 MB

  • Quarterly progress report (8)

    Registration: PRM/KA/RERA/1251/446/PR/201001/003630189 KB

  • Quarterly progress report (9)

    Registration: PRM/KA/RERA/1251/446/PR/201001/0036301.9 MB

  • Quarterly progress report

    Registration: PRM/KA/RERA/1251/446/PR/060722/0050441.6 MB

  • Quarterly progress report (2)

    Registration: PRM/KA/RERA/1251/446/PR/060722/005044261 KB

  • Quarterly progress report (3)

    Registration: PRM/KA/RERA/1251/446/PR/060722/0050442.2 MB

  • Quarterly progress report (4)

    Registration: PRM/KA/RERA/1251/446/PR/060722/0050442.2 MB

  • Quarterly progress report (5)

    Registration: PRM/KA/RERA/1251/446/PR/060722/005044196 KB

  • Quarterly progress report (6)

    Registration: PRM/KA/RERA/1251/446/PR/060722/0050441.7 MB

  • Quarterly progress report (7)

    Registration: PRM/KA/RERA/1251/446/PR/060722/0050443.0 MB

  • Quarterly progress report (8)

    Registration: PRM/KA/RERA/1251/446/PR/060722/005044326 KB

  • Quarterly progress report (9)

    Registration: PRM/KA/RERA/1251/446/PR/060722/0050442.1 MB

  • Quarterly progress report

    Registration: PRM/KA/RERA/1251/446/PR/060424/0067802.1 MB

  • Quarterly progress report (2)

    Registration: PRM/KA/RERA/1251/446/PR/060424/006780234 KB

  • Quarterly progress report (3)

    Registration: PRM/KA/RERA/1251/446/PR/060424/0067801.8 MB

  • Quarterly progress report (4)

    Registration: PRM/KA/RERA/1251/446/PR/060424/0067802.2 MB

  • Quarterly progress report (5)

    Registration: PRM/KA/RERA/1251/446/PR/060424/006780287 KB

  • Quarterly progress report (6)

    Registration: PRM/KA/RERA/1251/446/PR/060424/0067801.6 MB

  • Quarterly progress report (7)

    Registration: PRM/KA/RERA/1251/446/PR/060424/0067802.7 MB

  • Quarterly progress report (8)

    Registration: PRM/KA/RERA/1251/446/PR/060424/006780284 KB

  • Quarterly progress report (9)

    Registration: PRM/KA/RERA/1251/446/PR/060424/0067801.8 MB

Other registry documents6
  • Brochure

    Registration: PRM/KA/RERA/1251/446/PR/180519/001745998 KB

  • Brochure (2)

    Registration: PRM/KA/RERA/1251/446/PR/180519/0017456.4 MB

  • Brochure

    Registration: PRM/KA/RERA/1251/446/PR/201001/0036301.7 MB

  • Brochure (2)

    Registration: PRM/KA/RERA/1251/446/PR/201001/0036301.5 MB

  • Brochure

    Registration: PRM/KA/RERA/1251/446/PR/060722/005044143 KB

  • Brochure

    Registration: PRM/KA/RERA/1251/446/PR/060424/006780143 KB

Files are shown as captured in our registry snapshot. Always confirm the latest record on the official state portal before you transact.

Floor Plans & Pricing

Available configurations, areas and recorded pricing.

2 BHK

2 layouts

2 BHK Apartment

934 sq.ft.

1.9 - 2.42 Cr

2 BHK Apartment

1431 sq.ft.

1.9 - 2.42 Cr

3 BHK

4 layouts

3 BHK Apartment

1453 sq.ft.

3.18 Cr

3 BHK Apartment

1460 sq.ft.

3.2 Cr

3 BHK Apartment

2305 sq.ft.

5.04 Cr

3 BHK Apartment

3430 sq.ft.

7.51 Cr

4 BHK

1 layout

4 BHK Apartment

2890 sq.ft.

5.21 - 5.9 Cr

Room dimensions

Room-by-room dimensions from each plan’s published schedule — shown exactly as filed, never estimated.

2 BHK Apartment · 934 sq.ft.9 rooms
RoomDimensions (as printed)Area
Living Room6.27 m × 4.09 m276 sqft
Kitchen3.99 m × 2.44 m105 sqft
Bedroom3.50 m × 3.79 m143 sqft
Bedroom3.50 m × 4.39 m166 sqft
Toilet2.39 m × 1.55 m40 sqft
Toilet1.63 m × 2.64 m46 sqft
UtilityService1.45 m × 1.83 m29 sqft
Terrace3.02 m × 2.49 m81 sqft
Foyer3.66 m × 1.29 m51 sqft

Itemized rooms add up to 937 sqft · super area 934 sqft (walls, circulation and balconies are not itemized)

2 BHK Apartment · 1431 sq.ft.9 rooms
RoomDimensions (as printed)Area
Living Room6.27 m × 4.09 m276 sqft
Kitchen3.99 m × 2.44 m105 sqft
Bedroom3.50 m × 3.79 m143 sqft
Bedroom3.50 m × 4.39 m166 sqft
Toilet2.39 m × 1.55 m40 sqft
Toilet1.63 m × 2.64 m46 sqft
UtilityService1.45 m × 1.83 m29 sqft
Terrace3.02 m × 2.49 m81 sqft
Foyer3.66 m × 1.29 m51 sqft

Itemized rooms add up to 937 sqft · super area 1,431 sqft (walls, circulation and balconies are not itemized)

3 BHK Apartment · 1453 sq.ft.14 rooms
RoomDimensions (as printed)Area
Living Room3.81 m × 3.66 m150 sqft
Family Room3.89 m × 3.66 m153 sqft
Kitchen And Dining3.81 m × 3.91 m160 sqft
Bedroom3.91 m × 3.76 m158 sqft
Bedroom4.95 m × 3.76 m200 sqft
Bedroom5.05 m × 3.76 m205 sqft
Toilet2.62 m × 1.65 m46 sqft
Toilet1.52 m × 2.59 m43 sqft
Toilet2.62 m × 1.65 m46 sqft
UtilityService1.52 m × 2.64 m43 sqft
Service1.47 m × 1.17 m19 sqft
Dack3.83 m × 1.83 m76 sqft
Garden3.83 m × 2.79 m115 sqft
Foyer2.11 m × 4.57 m104 sqft

Itemized rooms add up to 1,518 sqft · super area 1,453 sqft (walls, circulation and balconies are not itemized)

3 BHK Apartment · 1460 sq.ft.15 rooms
RoomDimensions (as printed)Area
Living Room3.81 m × 3.66 m150 sqft
Family Room3.89 m × 3.66 m153 sqft
Kitchen And Dining3.81 m × 3.91 m160 sqft
Bedroom4.95 m × 3.76 m200 sqft
Bedroom5.05 m × 3.76 m205 sqft
Bedroom3.91 m × 3.76 m158 sqft
Toilet1.52 m × 2.59 m43 sqft
Toilet2.62 m × 1.65 m46 sqft
Toilet1.52 m × 2.59 m43 sqft
UtilityService1.52 m × 2.64 m43 sqft
Garden3.83 m × 2.79 m115 sqft
Dack3.83 m × 1.83 m76 sqft
Terrace1.80 m × 3.61 m70 sqft
Service1.47 m × 1.17 m19 sqft
Foyer2.11 m × 4.57 m104 sqft

Itemized rooms add up to 1,585 sqft · super area 1,460 sqft (walls, circulation and balconies are not itemized)

3 BHK Apartment · 2305 sq.ft.14 rooms
RoomDimensions (as printed)Area
Living Room3.81 m × 3.66 m150 sqft
Family Room3.89 m × 3.66 m153 sqft
Kitchen And Dining3.81 m × 3.91 m160 sqft
Bedroom3.91 m × 3.76 m158 sqft
Bedroom4.95 m × 3.76 m200 sqft
Bedroom5.05 m × 3.76 m205 sqft
Toilet2.62 m × 1.65 m46 sqft
Toilet1.52 m × 2.59 m43 sqft
Toilet2.62 m × 1.65 m46 sqft
UtilityService1.52 m × 2.64 m43 sqft
Service1.47 m × 1.17 m19 sqft
Dack3.83 m × 1.83 m76 sqft
Garden3.83 m × 2.79 m115 sqft
Foyer2.11 m × 4.57 m104 sqft

Itemized rooms add up to 1,518 sqft · super area 2,305 sqft (walls, circulation and balconies are not itemized)

3 BHK Apartment · 3430 sq.ft.15 rooms
RoomDimensions (as printed)Area
Living Room5.71 m × 4.04 m248 sqft
Kitchen3.28 m × 2.52 m89 sqft
Bedroom3.50 m × 6.93 m262 sqft
Bedroom3.58 m × 6.93 m267 sqft
Bedroom3.50 m × 3.73 m141 sqft
Bedroom3.50 m × 3.73 m141 sqft
Toilet1.60 m × 3.43 m59 sqft
Toilet2.44 m × 1.60 m42 sqft
Toilet2.44 m × 1.60 m42 sqft
Toilet2.44 m × 1.60 m42 sqft
Terrace2.97 m × 2.52 m80 sqft
Terrace2.97 m × 2.52 m80 sqft
Dining3.12 m × 4.34 m146 sqft
Foyer3.50 m × 1.22 m46 sqft
UtilityService2.67 m × 1.52 m44 sqft

Itemized rooms add up to 1,729 sqft · super area 3,430 sqft (walls, circulation and balconies are not itemized)

About Total Environment In That Quiet Earth

Check out Total Environment In That Quiet Earth in Hennur Road, one of the upcoming under-construction housing societies in Bangalore North. There are apartments and villas for sale in Total Environment In That Quiet Earth. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Total Environment Homes, Total Environment In That Quiet Earth is scheduled for possession in Sep, 2026. This housing society has multiple property options to offer, in varied price range, making it one of the mostMore ↓

Check out Total Environment In That Quiet Earth in Hennur Road, one of the upcoming under-construction housing societies in Bangalore North. There are apartments and villas for sale in Total Environment In That Quiet Earth. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Total Environment Homes, Total Environment In That Quiet Earth is scheduled for possession in Sep, 2026. This housing society has multiple property options to offer, in varied price range, making it one of the most suitable address to own, that too in your budget. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The RERA registration number of this project is PRM/KA/RERA/1251/446/PR/180519/001745. Total Environment Homes is one of the known real estate brands in Bangalore North.The builder has delivered 23 projects so far. Around 2 projects are upcoming. There are 4 projects of this builder, which are currently under-construction. Here’s everything you need to know about the must-know features of this housing society along with Total Environment In That Quiet Earth Price List, Photos, Floor Plans, Payment Plans, Brochure download procedure and other exciting facts about your future home:

Top Facilities

34 facilities recorded for this project

  • Swimming Pool
  • Steam Room
  • Squash Court
  • Lawn Tennis Court
  • Toddler Pool
  • Table Tennis
  • Basketball Court
  • Badminton Court
  • Indoor Games

Location Advantages

Key destinations around Total Environment In That Quiet Earth

Shri Vidya Niketan School and College

College · 1.3 km

Kalkere Lake Park

Park · 1.4 km

L.B.S. School

School · 1.4 km

Ramapura Lake Park

Park · 1.4 km

SLS International Gurukul

School · 1.5 km

St George High School

School · 1.6 km

Market Snapshot for Hennur Road

Computed from 73 Hennur Road projects in our catalogue (56 with a per-sqft price).

73 projects here, by price band

Budget
1
Affordable
20
Premium
28
Luxury
7

Society Reviews

Reviews by residents

No written reviews yet

Be the first to share a first-hand experience.

Locality overview

Explore life around Total Environment In That Quiet Earth

Understand daily conveniences and connectivity around the project before planning a visit.

View full locality insights
73
Projects listed
2, 3 BHK
Popular configurations
Ready to move
Most common status

Based on 73 projects listed in Hennur Road on PropertyBaazi — our catalog, not a market index.

Distances and travel times are approximate. Confirm routes and access conditions before making a purchase decision.

About Total Environment Builders

View builder profile

Total Environment Builders

15 projects on PropertyBaazi

Total Environment has delivered over 4 million square feet to 1,200 customers in Bangalore, Hyderabad, and Pune. Our love for design and creating homes is what truly drives us. We are committed to design thinking and practices in all our projects. We aim to make the places we go more beautiful and the experiences more enjoyable. Our passion for design and creating unique spaces fuels us. We prioritize inspiration, intention, and integrity in all our projects. We live by our passions and hope to inspire yours.

Projects by Total Environment Builders

FAQs

Frequently Asked Questions

Is Total Environment In That Quiet Earth ready to move in?

Total Environment In That Quiet Earth is still under construction, with possession expected around Sep, 2026.

Is Total Environment In That Quiet Earth a RERA-registered project?

Yes. Total Environment In That Quiet Earth is registered with K-RERA under numbers PRM/KA/RERA/1251/446/PR/180519/001745, PRM/KA/RERA/1251/446/PR/201001/003630, PRM/KA/RERA/1251/446/PR/060722/005044, PRM/KA/RERA/1251/446/PR/060424/006780, which you can verify on the official RERA portal.

What are prices and sizes like at Total Environment In That Quiet Earth?

Homes at Total Environment In That Quiet Earth are priced ₹1.9 Cr - 6.5 Cr (about ₹18,269/sq.ft) for 2, 3, 4 BHK Apartment, sized 1,040–2,890 sq.ft carpet area.

Where is Total Environment In That Quiet Earth and how well-connected is it?

Total Environment In That Quiet Earth is located in Hennur Road, Bengaluru. The railway station is around 4.97 km away.

How big is the Total Environment In That Quiet Earth project?

Total Environment In That Quiet Earth is spread across 37 acres, 5 towers, up to 26 floors and 1,235 homes.

What can residents enjoy at Total Environment In That Quiet Earth?

Total Environment In That Quiet Earth comes with 34 amenities, including Swimming Pool, RO System, Terrace Garden, Steam Room, Squash Court and Cafeteria.

What's around Total Environment In That Quiet Earth for daily needs?

Close to Total Environment In That Quiet Earth you'll find hospitals such as Eshawar HospItal and Medi Derma Hospital and schools like L.B.S. School.

Who is developing Total Environment In That Quiet Earth?

Total Environment In That Quiet Earth is being developed by Total Environment Builders.

Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.