Amenity
Birla Pravaah Amenity 1
Select a view or open the gallery
Birla Pravaah
Sector 71, Gurugram
Construction Status
New launch
Possession will start from Mar, 2032
Price on request
Price on request
3 BHK
Carpet Area
1357.77–1678.53 sqft
Price on Request
Project Details
- Project area
- 5.07 acres
- Towers
- 5
- Total units
- 492
- Floors
- 35
- Open area
- 70%
- Unit sizes
- 1,357.77–1,678.53 sqft · Carpet Area
- Configurations
- 3 BHK
- Property type
- Apartment
- Possession
- Completion in Mar, 2032
Specifications
- Living / Dining / Foyer / Family Lounge
- Floor
- Imported marble / stone and equivalents
- Walls
- Acrylic emulsion paint
- Ceiling
- Acrylic emulsion paint Master Bedroom / Dress Room
- Floor
- Laminated wooden flooring
- Walls
- Acrylic emulsion paint
- Ceiling
- Acrylic emulsion paint Modular
- Wardrobes
- N/A Master Toilet
- Floor
- Anti-skid vitrified tiles
- Walls
- Combination of tiles and acrylic emulsion paint
- Ceiling
- Grid ceiling / POP / acrylic emulsion paint
- Counter
- Granite / vitrified tiles and equivalents Sanitary Ware & CP
- Fittings
- Sanitary and CP fittings and equivalents
- Fittings / Fixtures
- Glass shower partition in master toilet without door; exhaust fan in all toilets of standard make Bedrooms
- Floor
- Laminated wooden flooring
- Walls
- Acrylic emulsion paint
- Ceiling
- Acrylic emulsion paint
- Wardrobes
- N/A Toilet
- Floor
- Anti-skid vitrified tiles
- Walls
- Combination of tiles and acrylic emulsion paint
- Ceiling
- Grid ceiling / POP / acrylic emulsion paint
- Counter
- Granite / vitrified tiles and equivalents Sanitary Ware & CP
- Fittings
- Sanitary and CP fittings and equivalents
- Fixtures
- Glass shower partition in master toilet without door; exhaust fan in all toilets of standard make Kitchen
- Floor
- Stone or tile or equivalent
- Walls
- Combination of tile dado and acrylic emulsion paint
- Ceiling
- Acrylic emulsion paint
- Counter
- Granite / vitrified tiles and equivalents
- Fixtures
- CP fittings, SS sink, exhaust fan Kitchen
- Appliances
- Modular kitchen with hob, chimney, and instant geyser Utility Room / Utility Balcony / Toilet
- Floor
- Tiles
- Walls & Ceiling
- Acrylic emulsion paint / oil-bound distemper
- Toilet
- Anti-skid vitrified tile flooring, granite stone counter, sanitary ware and CP fittings; walls - combination of tiles and acrylic emulsion paint
- Balcony
- Tiles / anti-skid vitrified tiles and equivalents Sit-Outs
- Floor
- Anti-skid vitrified tiles
- Walls & Ceiling
- Exterior grade paint
- Railing
- Glass & aluminum /
MS / SS
- Fixtures
- N/A
As stated by the builder; shown as filed.
RERA Registration
Phase registrations, completion timelines and available documents from the state RERA record.
Phase 1
GGM/1006/738/2025/109 DATED 06.11.2025
Haryana RERA
- Registered on
- 06/11/2025
- Completion by
- 31/03/2032
RERA-GRG-2071-2025Registration-number match
Registration number found in HRERA-GGM
The project registration number matched the registry snapshot. Confirm the current status and filings on the live portal before booking.
- Snapshot checked
- 21 Jul 2026
- Check the official portal
- Open HRERA portal ↗
- Registry ID
- RERA-GRG-2071-2025
- Registry promoter
- BIRLA ESTATES PRIVATE LIMITED
Registry documents
Mirrored from HRERA-GGM
Requesting a download sends your enquiry to the seller. Once sent, other documents for this project stay unlocked for this browser session.
CA certificate
Registration: RERA-GRG-2071-2025441 KB
Licence
Registration: RERA-GRG-2071-2025452 KB
Licence (2)
Registration: RERA-GRG-2071-2025224 KB
Letter of intent
Registration: RERA-GRG-2071-2025481 KB
Approved plan (2)
Registration: RERA-GRG-2071-2025201 KB
Approved plan
Registration: RERA-GRG-2071-20253.8 MB
Plans & drawings28
Approved plan (3)
Registration: RERA-GRG-2071-20252.5 MB
Approved plan (5)
Registration: RERA-GRG-2071-20251.8 MB
Approved plan (4)
Registration: RERA-GRG-2071-20252.5 MB
Approved plan (7)
Registration: RERA-GRG-2071-2025556 KB
Approved plan (6)
Registration: RERA-GRG-2071-20253.0 MB
Approved plan (9)
Registration: RERA-GRG-2071-2025851 KB
Approved plan (8)
Registration: RERA-GRG-2071-20252.0 MB
Approved plan (10)
Registration: RERA-GRG-2071-20251.8 MB
Approved plan (11)
Registration: RERA-GRG-2071-20252.6 MB
Approved plan (12)
Registration: RERA-GRG-2071-20251.3 MB
Approved plan (13)
Registration: RERA-GRG-2071-20253.1 MB
Approved plan (14)
Registration: RERA-GRG-2071-2025926 KB
Approved plan (17)
Registration: RERA-GRG-2071-2025964 KB
Approved plan (16)
Registration: RERA-GRG-2071-20252.5 MB
Approved plan (15)
Registration: RERA-GRG-2071-20251.8 MB
Approved plan (18)
Registration: RERA-GRG-2071-20251.2 MB
Approved plan (21)
Registration: RERA-GRG-2071-2025351 KB
Approved plan (19)
Registration: RERA-GRG-2071-20253.1 MB
Approved plan (20)
Registration: RERA-GRG-2071-20252.4 MB
Approved plan (23)
Registration: RERA-GRG-2071-20252.6 MB
Approved plan (22)
Registration: RERA-GRG-2071-20253.1 MB
Approved plan (25)
Registration: RERA-GRG-2071-2025916 KB
Approved plan (24)
Registration: RERA-GRG-2071-20254.1 MB
Approved plan (26)
Registration: RERA-GRG-2071-20252.0 MB
Approved plan (27)
Registration: RERA-GRG-2071-20252.0 MB
Approved plan (29)
Registration: RERA-GRG-2071-20252.6 MB
Approved plan (28)
Registration: RERA-GRG-2071-20252.2 MB
Approved plan (30)
Registration: RERA-GRG-2071-20252.5 MB
Land, title & agreements9
Agreement
Registration: RERA-GRG-2071-2025398 KB
Land record
Registration: RERA-GRG-2071-2025280 KB
Agreement (2)
Registration: RERA-GRG-2071-2025348 KB
Declaration
Registration: RERA-GRG-2071-202556 KB
Land record (2)
Registration: RERA-GRG-2071-2025244 KB
Encumbrance certificate
Registration: RERA-GRG-2071-2025246 KB
Declaration (2)
Registration: RERA-GRG-2071-2025128 KB
Declaration (3)
Registration: RERA-GRG-2071-2025116 KB
Land record (3)
Registration: RERA-GRG-2071-202580 KB
NOCs5
NOC
Registration: RERA-GRG-2071-2025111 KB
NOC (3)
Registration: RERA-GRG-2071-20251.9 MB
NOC (4)
Registration: RERA-GRG-2071-2025818 KB
NOC (2)
Registration: RERA-GRG-2071-20254.8 MB
NOC (5)
Registration: RERA-GRG-2071-2025369 KB
Other registry documents26
Other document
Registration: RERA-GRG-2071-20252.6 MB
Other document (2)
Registration: RERA-GRG-2071-2025821 KB
Other document (3)
Registration: RERA-GRG-2071-20251.9 MB
Other document (4)
Registration: RERA-GRG-2071-2025344 KB
Other document (6)
Registration: RERA-GRG-2071-202588 KB
Other document (7)
Registration: RERA-GRG-2071-2025424 KB
Other document (5)
Registration: RERA-GRG-2071-20252.9 MB
Other document (9)
Registration: RERA-GRG-2071-20252.4 MB
Other document (8)
Registration: RERA-GRG-2071-20254.0 MB
Other document (10)
Registration: RERA-GRG-2071-20252.6 MB
Other document (11)
Registration: RERA-GRG-2071-20252.6 MB
Other document (12)
Registration: RERA-GRG-2071-2025925 KB
Other document (13)
Registration: RERA-GRG-2071-20251.4 MB
Other document (15)
Registration: RERA-GRG-2071-2025851 KB
Other document (14)
Registration: RERA-GRG-2071-20252.4 MB
Other document (17)
Registration: RERA-GRG-2071-2025611 KB
Other document (16)
Registration: RERA-GRG-2071-20252.6 MB
Other document (18)
Registration: RERA-GRG-2071-2025162 KB
Other document (20)
Registration: RERA-GRG-2071-2025346 KB
Other document (19)
Registration: RERA-GRG-2071-20251.7 MB
Other document (22)
Registration: RERA-GRG-2071-20251.1 MB
Other document (21)
Registration: RERA-GRG-2071-20253.9 MB
Other document (23)
Registration: RERA-GRG-2071-20253.3 MB
Other document (24)
Registration: RERA-GRG-2071-20251.9 MB
Other document (25)
Registration: RERA-GRG-2071-20251.8 MB
Other document (26)
Registration: RERA-GRG-2071-20252.5 MB
Files are shown as captured in our registry snapshot. Always confirm the latest record on the official state portal before you transact.
Information available on record
A concise view of the details present in the records and published project material available to PropertyBaazi.
Available in the project record
On recordOnly items present in the available record or published project material are shown.
RERA registered
A state RERA registration is present in the project record.
Builder CIN on record
A Corporate Identity Number is recorded for the developer.
Images from official brochure
The displayed media is linked to published project material.
Developer legal entity identified
A legal entity is recorded for the developer.
Last checked 18 July 2026. These checks reflect the records available to PropertyBaazi. Confirm current details with the relevant authority or developer before booking.
About Birla Pravaah
For those looking to buy a residential property, here comes one of the choicest offerings in Gurgaon, at Sector 71. Brought to you by Birla Estates, Birla Pravaah is among the newest addresses for homebuyers. There are apartments for sale in Birla Pravaah Sector 71, Gurgaon. This is a new launch project right now, and is expected to be delivered by Mar, 2032 . Birla Pravaah Gurgaon is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERA registration number of…More ↓Less ↑
For those looking to buy a residential property, here comes one of the choicest offerings in Gurgaon, at Sector 71. Brought to you by Birla Estates, Birla Pravaah is among the newest addresses for homebuyers. There are apartments for sale in Birla Pravaah Sector 71, Gurgaon. This is a new launch project right now, and is expected to be delivered by Mar, 2032 . Birla Pravaah Gurgaon is a RERA-registered housing society, which means all projects details are also available on state RERA website for end-users and investors. The RERA registration number of this project is GGM/1006/738/2025/109 DATED 06.11.2025. Birla Estates is one of the known real estate brands in Gurgaon.The builder has delivered 2 projects so far. Around 13 projects are upcoming. There are 5 projects of this builder, which are currently under-construction. Read on to know more about must-know features, Birla Pravaah Photos, Floor Plans, Payment Plans, Brochure download procedure and other exciting facts about the project.
Written by PropertyBaazi from our own research into this project.
PropertyBaazi research view
Strengths
- Strong developer pedigree: Birla Estates is part of the Aditya Birla Group with established credibility and financial backing
- Lowest entry price among comparable branded luxury projects in Sector 71 (₹3.26 Cr vs ₹4.72 Cr+ competitors)
- Strategic SPR corridor location with connectivity to NH-48, Golf Course Extension Road, Sohna Road and proximity to Cyber City 2
- Low-density design: ~500 units on 5 acres with 70-80% open space, 2-4 units per core for privacy
- Strong initial market absorption with reported 24-hour sell-out
- RERA registered (RC/REP/HARERA/GGM/1006/738/2025/109) providing regulatory oversight
Risks
- Extremely long possession timeline of March 2032 (7 years from launch) exposes buyers to significant delay risk and capital lock-in
- Possession dates vary across sources (2029/2030/2031/2032) indicating lack of clarity or potential for slippage
- No established rental or resale market yet; investment returns purely speculative until 2032+
- Sector 71 SPR corridor is seeing massive supply influx with multiple competing luxury projects (Tonino Lamborghini, Signature Global Titanium, others) risking oversupply and price competition
- Infrastructure in SPR corridor still mid-upgrade; metro connectivity gap exists (nearest metro is Millennium City Centre on Yellow Line, not walking distance)
- Price on Request model limits price transparency; actual finalized costs may vary significantly
- Birla Estates' relatively newer presence in NCR residential market compared to established NCR developers; limited track record of timely delivery in Gurugram specifically
- RERA registration is very recent (Nov 2025); project is in extremely early stages with no visible construction progress reported
Our read
- Location:
- Sector 71 on SPR is a high-growth corridor with excellent road connectivity to NH-48, Golf Course Extension Road, Sohna Road and emerging commercial hubs. The location benefits from Gurugram's southward expansion and Cyber City 2 proximity. However, the area is still developing with ongoing infrastructure upgrades, lacks immediate metro connectivity, and faces traffic congestion risks as SPR corridor densifies. The presence of multiple simultaneous luxury launches suggests strong developer confidence but also raises oversupply concerns.
- Price:
- At ₹3.26 Cr onwards (approx ₹25,000/sq.ft.), Birla Pravaah positions itself as the most affordable branded luxury option in Sector 71, undercutting competitors by 30-40%. This pricing appears reasonable for a Birla-branded product on SPR if delivered as promised. However, with 7-year possession timeline and Price on Request policy, buyers lack cost certainty. The price is not cheap in absolute terms but is relatively competitive within its immediate micro-market. Risk of better value emerging in competing projects or later phases exists.
- Buyer fit:
- Best suited for: (1) End-users with a 7+ year horizon who prioritize Birla brand and spacious layouts over immediate possession; (2) Investors with high risk appetite seeking capital appreciation in Gurugram's luxury corridor and comfortable with long capital lock-in. NOT suited for: Buyers needing possession before 2032, rental income seekers in near term, or risk-averse investors concerned about construction delays and market cycles over 7 years.
Market read
- Price trend:
- ₹25,000/sq.ft. average at launch; starting price ₹3.26 Cr for 3 BHK. Sector 71 SPR corridor has seen steady appreciation with multiple luxury launches (Tonino Lamborghini at ₹5.30 Cr+, Signature Global Titanium at ₹4.72 Cr+), making Birla Pravaah the lowest entry point among branded competitors. However, as a new launch with possession in 2032, actual price discovery in resale market is non-existent currently.
- Rental yield:
- No verified rental yield data available specifically for Birla Pravaah as project is under construction with 2032 possession. Sector 71 SPR corridor rental demand is driven by proximity to Cyber City, Udyog Vihar and Golf Course Extension Road corporate hubs, but actual yields for comparable new luxury projects in this micro-market are estimated in the range of 3-4% annually based on Gurugram luxury rental trends.
- Demand:
- Strong initial demand evidenced by reported sell-out of 492 units within 24 hours. Demand drivers include Birla brand, SPR corridor growth, and relatively lower entry price vs. competitors. However, this is primary market demand; secondary market appetite remains untested until possession.
- Resale:
- Resale market does not exist yet as project is in pre-launch/early construction phase with possession 7 years away. Future resale will depend on delivery quality, actual infrastructure progress in Sector 71, and overall supply in SPR corridor.
In the news
Birla Pravaah in Sector 71 Gurgaon sold out within 24 hours of launch
The project reportedly saw all 492 units sell out within 24 hours at an average price near ₹25,000 per sq. ft., indicating strong initial demand. — Square Yards / Economic Times cited via HCO Real Estates, 2025
Birla Pravaah RERA registration approved under HARERA
Project received RERA registration RC/REP/HARERA/GGM/1006/738/2025/109 on 06.11.2025, confirming regulatory approval for launch. — HARERA / Grow More Realtors, 06 Nov 2025
Birla Estates launches Birla Pravaah on SPR corridor Sector 71
Birla Estates launched its luxury residential project on Southern Peripheral Road with 3, 3.5 BHK and penthouses across ~5 acres, positioned as lower-entry priced option compared to competing Lamborghini and Signature Global projects. — Various realty portals, 2025
Our verdict: Birla Pravaah is a credible but speculative long-term bet. The Birla brand, competitive pricing within Sector 71's luxury cluster, and SPR corridor growth story are genuine strengths. However, the March 2032 possession timeline (7 years) is a major risk factor in an volatile market, and the project is too early-stage to assess construction progress or delivery reliability. The reported 24-hour sell-out suggests strong initial demand, but this also means primary inventory is scarce, forcing buyers into resale/premium pricing. Cautious recommendation for buyers with long horizons and portfolio diversification; avoid if you cannot tolerate delay risk or need liquidity before 2032.
This is PropertyBaazi’s own research opinion, compiled from hcorealestates.com, nobroker.in, growmorerealtors.com, birlaestateshomes.com, birlassector71gurgaon.com and riseinfraventures.com. It is not investment advice — verify independently before you transact.
Top Facilities
34 facilities recorded for this project
- Swimming Pool
- Gymnasium
- Badminton Court
- Squash Court
- Basketball Court
- Skating Rink
- Yoga / Meditation Area
- Aerobics Centre
- Cricket Pitch
Location Advantages
Key destinations around Birla Pravaah
Lady Florence Public School
School · 5.2 Km
Park Hospital
Hospital · 5.8 Km
Gurugram University
University · 7.6 Km
Gurgaon Railway Station
Railway Station · 18 Km
Indira Gandhi International Airport
Airport · 35.5 Km
Elan Epic Mall
Shopping Center/ Market/ Mall · 2.5 Km
View Official Brochure
Official brochure
Birla Pravaah
24 pages · 13.7 MB · PDF
Published by the builder; shown as filed.
Reading here is free. Downloading sends your enquiry to the seller so they can follow up.
Price list
Published by the builder; shown as filed. Downloading sends the same enquiry.
Price Comparison
Current asking rates for this project, its locality and Gurugram.
Today’s asking rates
Project, locality and city benchmarks
Configuration rates in Sector 712 configurations
- 3 BHK
- ₹22,105/sqft · 9 samples
- 4 BHK
- ₹19,189/sqft · 5 samples
Stamp duty and registration · Haryana
- Stamp duty — For Female 5 % in Urban and 3% in Rural
- For Female 5% in Urban and 3% in Rural
- Stamp duty — For Male 7% in Urban and 5 % in Rural
- For Male 7% in Urban and 5% in Rural
- Stamp duty — For Joint Ownership 6 % in Urban and 4 % in Rural
- For Joint Ownership 6% in Urban and 4% in Rural
- Registration
- ₹50,000
Recorded state rates for reference. Confirm the applicable amount at registration.
Project and locality asking-rate medians come from the PropertyBaazi project records in the sample shown. Registered rates come from government transaction records. Neither is a valuation, index or forecast.
Market Snapshot for Sector 71
Computed from 18 Sector 71 projects in our catalogue (9 with a per-sqft price).
18 projects here, by price band
Society Reviews
Reviews by residents
No written reviews yet
Be the first to share a first-hand experience.
Explore life around Birla Pravaah
Understand daily conveniences and connectivity around the project before planning a visit.
Based on 12 projects listed in Sector 71 on PropertyBaazi — our catalog, not a market index.
Distances as recorded by the builder — approximate; please confirm on the ground.
View on mapMetro & Rail 2
- Gurgaon Railway Station18 Km
- Millennium City Centre Gurugram11 Km
Schools 1
- Lady Florence Public School5.2 Km
Colleges & Universities 1
- Gurugram University7.6 Km
Hospitals 1
- Park Hospital5.8 Km
Shopping & Malls 1
- Elan Epic Mall2.5 Km
Business Hubs 1
- Vatika Business Centre4.4 Km
Airport 1
- Indira Gandhi International Airport35.5 Km
Hotels 1
- Sunday Hotel & Residences Gurugram350 m
Sports & Stadiums 1
- Tau Devi Lal Athletic Stadium8.7 Km
Golf 1
- DLF Golf and Country Club13 Km
Distances as recorded when the project was listed — approximate; please confirm on the ground.
Similar Projects
Comparable projects around Sector 71
About Birla Estates

Birla Estates
17 projects on PropertyBaazi
Birla Estates Private Limited, a part of the Aditya Birla Group, was founded in 2016. They specialize in premium and high mid-income residential housing, working on owned land parcels and joint ventures. Their aim is to be among India's top 5 real estate companies by creating world-class properties with a focus on design, customer service, sustainability, and execution excellence. Their philosophy focuses on enriching customers' lives through well-designed environments. Birla Estates is based in Mumbai, with offices in NCR and Bangalore, working on commercial and residential projects.
Projects by Birla Estates
Frequently Asked Questions
When can I move into Birla Pravaah?
Birla Pravaah is still under construction, with possession expected around Mar, 2032.
Does Birla Pravaah have RERA approval?
Yes. Birla Pravaah is registered with HRERA-GGM under number GGM/1006/738/2025/109 DATED 06.11.2025, which you can verify on the official RERA portal.
How much should I budget for Birla Pravaah?
Birla Pravaah offers 3 BHK Apartment, sized 1,357.77–1,678.53 sq.ft carpet area. Current pricing is shared on request — download the brochure from the project page for the latest price list.
Whereabouts is Birla Pravaah, and what's the commute like?
Birla Pravaah is located in Sector 71, Gurugram. The nearest metro is about 4.32 km away.
What's the scale of Birla Pravaah?
Birla Pravaah is spread across 5.1 acres, 5 towers, up to 35 floors and 492 homes.
What amenities does Birla Pravaah offer?
Birla Pravaah comes with 34 amenities, including Swimming Pool, Gymnasium, Club House, Mini Theatre, Children's Play Area and Badminton Court.
What conveniences are near Birla Pravaah?
Close to Birla Pravaah you'll find hospitals such as Kamal Hospital and Maternity Centre and Gobind Hospital, schools like Kamla International.
Which builder is behind Birla Pravaah?
Birla Pravaah is being developed by Birla Estates.
Quick Links
Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.











