Skip to main content

Outdoors

Elevation

01/07

Mahira Homes 104

Outdoors · 1 of 7

Mahira Homes 104 — Elevation

Elevation

Mahira Homes 104

Sector 104, Gurugram

RERA RegisteredFloor Plans Available+23 Top Facilities

Construction Status

Ready to move

Possession completed (Sep 2025)

Price on request

Price on request

Download Brochure

1 BHK

Carpet Area

337.66 sqft

Price on Request

2 BHK

Carpet Area

641.47–643.55 sqft

Price on Request

Project Details

Project area
10.44 acres
Towers
8
Total units
1,505
Floors
19
Open area
50%
Unit sizes
337.66–643.55 sqft · Carpet Area
Configurations
1, 2 BHK
Property type
Apartment
Possession
Ready to move
Specifications
1

DRG. / LOBBY FLOORING -TILES / IPS

2

DRG. / LOBBY WALL CEILING FINISH -TILES / IPS

3

BEDROOMS FLOORING- TILES / IPS

4

BEDROOM WALL CEILING FINISH- OIL BOND DISTEMPER / COLOUR WASH

5

TOILETS WALL FINISH- TILES / COLOUR WASH

6

TOILETS FLOORING- TILES / IPS

7

KITCHEN FLOORING- TILES / IPS

8

KITCHEN PLATFORM STONE / TILES

9

KITCHEN WALL FINISH- "TILES UP TO

2

FEET HIGH ABOVE COUNTER AND OIL BOND DISTEMPER / COLOUR WASH IN BALANCE AREA"

10

FIXTURE AND FITTINGS- "SINGLE BOWL STAINLESS STEEL SINK & CP FITTINGS"

11

BALCONY FLOORING- TILES / IPS

12

WINDOW -"HARDWOOD / MS

Z-SECTION /

FIBER /COMPOSITE"

13

DOOR FRAME / DOORS- "HARDWOOD

/ M.S /

FIBER DOOR FRAMES WITH FLUSH DOOR SHUTTER / COMPOSITE DOOR SHUTTER / FIBER DOOR SHUTTER ETC"

14

COMMON AREA FLOORING / STAIRCASE FLOORING- STONE / TILES / IPS

15

LIFT LOBBY- STONE / TILES / IPS

16

CHINAWARE- STANDARD FITTING

17

ELECTRICAL- "ISI MARK PRODUCTS FOR WIRING, SWITCHES AND CIRCUITS"

18

SECURITY- GATED COMPLEX

As stated by the builder; shown as filed.

RERA Registration

Phase registrations, completion timelines and available documents from the state RERA record.

  • Phase 1

    GGM/504/236/2021/72 DATED 25.10.2021

    Haryana RERA

    Registered on
    Not stated
    Completion by
    Not stated
    Registered

Not found in this snapshot

No matching registry entry was found

The registration was not found in our Maharashtra, Tamil Nadu, Karnataka, Haryana, Uttar Pradesh and Gujarat snapshot. This does not mean the project is unregistered; check the live state portal before you transact.

Snapshot checked
21 Jul 2026
Check the official portal
Open HRERA portal ↗

Registry documents

Mirrored from the state RERA registry

0 documents

No mirrored registry documents available

Document availability varies by state portal. Use the official RERA portal below for the latest filed records.

Project record

Information available on record

A concise view of the details present in the records and published project material available to PropertyBaazi.

Available in the project record

On record

Only items present in the available record or published project material are shown.

  • RERA registered

    A state RERA registration is present in the project record.

  • Floor plans with measured dimensions

    Published floor plans include room-level dimensions.

Last checked 18 July 2026. These checks reflect the records available to PropertyBaazi. Confirm current details with the relevant authority or developer before booking.

Floor Plans & Pricing

4 unique plan layouts on record: 2 BHK Apartment. Room-by-room dimensions available for 1 of the 2 plans shown.

2 BHK

2 layouts

2 BHK Apartment

642.35 sq.ft.

Price on Request

2 BHK Apartment

643.55 sq.ft.

Price on Request

Room dimensions

Room-by-room dimensions from each plan’s published schedule — shown exactly as filed, never estimated.

2 BHK Apartment · 642.35 sq.ft.10 rooms
RoomDimensions (as printed)Area
Drawing Room3.14 m × 4.28 m145 sqft
Kitchen2.24 m × 2.45 m59 sqft
Bedroom3.05 m × 3.60 m118 sqft
Bedroom3.05 m × 3.30 m108 sqft
Toilet2.11 m × 1.38 m31 sqft
Toilet1.38 m × 2.10 m31 sqft
Balcony1.35 m × 2.43 m35 sqft
UtilityService3.05 m × 2.48 m81 sqft
Balcony1.45 m × 1.50 m23 sqft
Balcony4.80 m × 1.67 m86 sqft

Itemized rooms add up to 717 sqft · super area 642.35 sqft (walls, circulation and balconies are not itemized)

About Mahira Homes 104

Check out Mahira Homes 104 in Sector 104, one of the upcoming under-construction housing societies in Gurgaon. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Mahira Group, Mahira Homes 104 is scheduled for possession in Sep, 2025. This housing society has multiple property options to offer, in varied price range, making it one of the most suitable address to own, that too in your budget. Being a RERA-registered society, the project details and other important information is alsoMore ↓

Check out Mahira Homes 104 in Sector 104, one of the upcoming under-construction housing societies in Gurgaon. This society will have all basic facilities and amenities to suit homebuyer’s needs and requirements. Brought to you by Mahira Group, Mahira Homes 104 is scheduled for possession in Sep, 2025. This housing society has multiple property options to offer, in varied price range, making it one of the most suitable address to own, that too in your budget. Being a RERA-registered society, the project details and other important information is also available on state RERA portal. The RERA registration number of this project is GGM/504/236/2021/72 DATED 25.10.2021. Mahira Group is one of the known real estate brands in Gurgaon. There is 1 project of this builder, which is currently under-construction. Here’s everything you need to know about the must-know features of this housing society along with Mahira Homes 104 Price List, Photos, Floor Plans, Payment Plans, Brochure download procedure and other exciting facts about your future home:

Written by PropertyBaazi from our own research into this project.

PropertyBaazi research view

Strengths

  • RERA-registered (HRERA-72 of 2021 / RERA-GRG-PROJ-910-2021)
  • Location in New Gurgaon near Dwarka Expressway corridor with proposed metro/RRTS upside
  • Affordable entry pricing under Haryana Affordable Housing Policy
  • Basic amenities included: power backup, CCTV, security, children's play area, rainwater harvesting, STP
  • 50% open space as per affordable housing norms

Risks

  • SERIOUS DEVELOPER TRACK RECORD CONCERN: HRERA cancelled the licence of a Mahira Infratech project in Sector 68 and blacklisted four other projects by the same group (formerly Sai Aaina Farms Pvt Ltd), impacting 1,000+ buyers per CNBC TV18. Independent legal verification is essential.
  • Specific construction progress and possession status updates for Homes 104 were scarce in public search results; physical site verification required.
  • Compact unit sizes (carpet area ~338–644 sqft) limit liveability.
  • New Gurgaon affordable segment faces oversupply risk with multiple competing projects.
  • Nearest operational metro (Huda City Centre) is 15–18 km away; current public transport dependence is high.
  • Maintenance quality after the initial 5-year waiver period is uncertain.
  • ‘Price on Request’ listings on several portals reduce price transparency.

Our read

Location:
Sector 104 sits on the Dwarka Expressway corridor in New Gurgaon. The micro-market offers long-term connectivity upside, but current social infrastructure and retail maturity lag established Gurgaon hubs. Suitable for buyers with a 5–7 year horizon.
Price:
Entry-level pricing makes it accessible for first-time buyers and PMAY beneficiaries. However, buyers should benchmark against comparable affordable projects (e.g., Signature Global, Pyramid, ROF) to avoid overpayment, and verify exact all-in costs independently.
Buyer fit:
Suitable only for budget-constrained end-users seeking affordable housing benefits and investors with high risk tolerance targeting the Dwarka Expressway corridor. Mandatory for: legal due diligence, physical site inspection, and RERA status verification given developer history. Not recommended for risk-averse buyers.

Market read

Price trend:
Approximate listed prices: ₹40 lakh (1 BHK), ₹60 lakh (2 BHK), ₹1 crore (3 BHK) per planmyproperty.in. Verified resale price appreciation data for this specific project was not found.
Rental yield:
No specific rental yield data found for Mahira Homes 104. General rental demand in New Gurgaon is reported to be rising due to nearby office corridors, but quantified yields are unavailable.
Demand:
Steady budget-end demand under the Haryana Affordable Housing / PMAY framework. Listings are active on listing portals, indicating ongoing market participation.
Resale:
Resale listings appear on major portals, but verified transaction volumes or resale price trends were not found in search results.

In the news

  • Mahira Homes Gurgaon licence cancelled: RERA recognised questions home buyers should ask

    Haryana RERA cancelled the licence of a Mahira Infratech project in Sector 68 and blacklisted four other projects by the developer (formerly Sai Aaina Farms Pvt Ltd), leaving over 1,000 homebuyers in a fix. The report advises buyers to verify RERA status, bank approvals, and legal documentation before purchasing. CNBC TV18, Not specified in search snippet

  • Draw of Results Mahira Homes 104 Affordable Housing Sector 104 Gurgaon

    Official draw results for Mahira Homes 104 were published by the Town and Country Planning Department, showing unit allocations to applicants under the General Category for 2 BHK units. affordablehomesgurgaon.in / Town and Country Planning Department, 2021

Our verdict: PROCEED WITH EXTREME CAUTION. The location and affordable price point are structurally attractive, but the developer’s history of HRERA licence cancellation and blacklisting on other projects is a material red flag. Buyers must independently confirm that Mahira Homes 104 is not among the affected projects, verify active RERA compliance, inspect actual construction/possession status on site, and obtain a lawyer’s title and documentation review before committing. Do not rely solely on broker assurances or marketing materials.

This is PropertyBaazi’s own research opinion, compiled from nobroker.in, cnbctv18.com, planmyproperty.in, mahirahomes.com, proptiger.com, affordablehomesgurgaon.in, propertyveda.com, magicbricks.com and orionrealtors.com. It is not investment advice — verify independently before you transact.

Top Facilities

23 facilities recorded for this project

  • Basketball Court
  • Badminton Court
  • Yoga / Meditation Area
  • Jogging Track
  • Gymnasium
  • Gazebo
  • Banquet Hall
  • Children's Play Area
  • Senior Citizen Sitout

Location Advantages

Key destinations around Mahira Homes 104

Sector 42-43 metro

Metro Station · 600m

Corporate Office Vipul Lt

Office complex · 650m

DLF Golf and Country Club

Golf Course · 1.6km

Sky College

University · 2.2km

Dighert Clinic

Hospital · 3.2km

Appu Ghar   

Amusement Park · 3.6km

View Official Brochure

Official brochure

Mahira Homes 104

23 pages · 3.1 MB · PDF

Published by the builder; shown as filed.

Reading here is free. Downloading sends your enquiry to the seller so they can follow up.

Price list

Published by the builder; shown as filed. Downloading sends the same enquiry.

Market Snapshot for Sector 104

Computed from 20 Sector 104 projects in our catalogue (14 with a per-sqft price).

20 projects here, by price band

Budget
2
Affordable
1
Premium
7
Luxury
5

Society Reviews

Reviews by residents

No written reviews yet

Be the first to share a first-hand experience.

Locality overview

Explore life around Mahira Homes 104

Understand daily conveniences and connectivity around the project before planning a visit.

View full locality insights
18
Projects listed
3, 4 BHK
Popular configurations
Ready to move
Most common status

Based on 18 projects listed in Sector 104 on PropertyBaazi — our catalog, not a market index.

Distances and travel times are approximate. Confirm routes and access conditions before making a purchase decision.
Builder

About Mahira Group

View builder profile
Mahira Group logo

Mahira Group

5 projects on PropertyBaazi

Mahira Group is a brand of repute and integrity in the real estate market. Although it started with a modest beginning, today Mahira Group stands tall after delivering new-age homes to a plethora of customers in North India, particularly around Gurugram and Delhi. The core values of the company are quality, excellence, and timely completion. It is driven by the vision to become the most trusted name in the construction industry. By continuing to deliver landmark projects, the company strives to become a name that generates confidence and inspires trust.

Projects by Mahira Group

FAQs

Frequently Asked Questions

When can I move into Mahira Homes 104?

Mahira Homes 104 is under construction; its earlier possession date (Sep 2025) has passed, so confirm the current handover timeline with the developer.

Is Mahira Homes 104 a RERA-registered project?

Yes. Mahira Homes 104 is registered with the state RERA under number GGM/504/236/2021/72 DATED 25.10.2021, which you can verify on the official RERA portal.

What are prices and sizes like at Mahira Homes 104?

Mahira Homes 104 offers 1, 2 BHK Apartment, sized 337.66–643.55 sq.ft carpet area. Current pricing is shared on request — download the brochure from the project page for the latest price list.

Where is Mahira Homes 104 and how well-connected is it?

Mahira Homes 104 is located in Sector 104, Gurugram.

How big is the Mahira Homes 104 project?

Mahira Homes 104 is spread across 10.4 acres, 8 towers, up to 19 floors and 1,505 homes.

What can residents enjoy at Mahira Homes 104?

Mahira Homes 104 comes with 23 amenities, including Visitors Parking, Restaurant, Creche / Day Care, Gazebo, Banquet Hall and Shopping Centre.

What's around Mahira Homes 104 for daily needs?

Close to Mahira Homes 104 you'll find hospitals such as Medanta and Paras Hospital, Gurugram, schools like Royal Convent School and S B Public School.

Who is developing Mahira Homes 104?

Mahira Homes 104 is being developed by Mahira Group.

Disclaimer: The material and information contained on this page is provided for general information purposes only and does not constitute an endorsement, warranty, or representation by PropertyBaazi. PropertyBaazi is an information platform and is not a party to any transaction between users. Project details, prices, availability, RERA status and other information are compiled from public records and third-party sources, may change without notice, and should be independently verified with the developer, the relevant RERA authority and your own legal/financial advisors before you rely on them or make any decision.